The Division of Capital Asset Management and Maintenance (DCAMM), an agency within the Executive Office for Administration and Finance (A&F) is responsible for capital planning, major public building construction, facilities management, and real estate services for the Commonwealth of Massachusetts. The agency was created by the legislature in 1980 to promote quality and integrity in the management and construction of the Commonwealth’s capital facilities and real estate assets.

Standard Documents

Name * Description
DCAMM E-Bid Room Information (27.3 KB)
DCAMM E-Bid Room Information, Verification, Registration and Security Requirements
1 Document

Upcoming Solicitations

Number Deadline
DCP2117
DCP - Danvers State Hospital - Power Plant Demolition and Remediation, Danvers, MA. This Project is for remediation of hazardous materials and demolition of a boiler plant and ancillary structures, including the removal of an underground fuel storage tank and contaminated soils. The Category of Work is General Building Construction OR Demolition.
01/07/2025 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
DCP2119 HC1
Erich Lindemann Building - Existing Fuel Oil System Upgrades, Boston, MA. This project consists of upgrades to the existing fuel oil system, including replacement of existing emergency generator day tank fuel oil transfer system with new packaged fuel oil transfer system, remote-mounted transfer system control panel, main storage tank, interconnecting secondary containment piping system with two service pipes, and various fuel oil controls devices and accessories. The Category of Work is Mechanical Systems.
10/07/2021 06:00 PM UTC
DCP2136 - CM RFQ
Request for Qualifications for Construction Management at Risk Services, State Transportation Building and Massachusetts Information Technology Center (MITC) - Renovation and Modernization, Boston and Chelsea, MA. This project will renovate and modernize interior office spaces at the State Transportation Building, in Boston, and the MITC in Chelsea. Work at the State Transportation Building includes infill of an interior stair, mechanical upgrades to the VAV system, reconfiguration of interior office partitions and upgrading the finishes to approximately 63,000 usable square feet. Work at the MITC includes construction of a radio room and exterior radio antenna, building improvements to the main lobby/vestibule, reconfiguration of interior office partitions, and upgrading the office finishes. The Category of Work is General Building Construction.
09/29/2021 06:00 PM UTC
DPH2003
Tewksbury State Hospital - Saunders Building Elevator Modernization, Tewksbury, MA. This project is for the modernization of 10 elevators in the existing Tewksbury State Hospital building, including upgrades to existing elevator penthouses, mechanical and electrical systems. Work consists of the modernization of eight elevators with six stops and two elevators with seven stops in a fully occupied and operational hospital in a phased manner. This includes the upgrade of mechanical and electrical systems in support of the elevators. There is also an upgrade of service access to the elevator penthouses to meet current OSHA requirements. This project includes the following Filed Sub-Bid Categories: Masonry; Miscellaneous and Ornamental Iron; Painting; Elevators; HVAC; Electrical. The Category of Work is General Building Construction.
09/24/2021 06:00 PM UTC
DCP2118
New Bedford Armory Roof & Structural Repairs, New Bedford, MA. Renovation to an armory building, with construction of roof replacement and structural repair. This includes steel framing; sheathing; masonry work; carpentry; waterproofing, dampproofing and caulking; and roofing. This project includes the following Filed Sub-Bid: Roofing and Flashing. The Category of Work is General Building Construction.
09/23/2021 06:00 PM UTC
WSC1901 - Trade RFQ - Waterproofing, Dampproofing & Caulking 2nd Request
Request for Qualifications for one (1) Trade Contractor Package: Waterproofing; Dampproofing & Caulking - Second Request ($78,000), for Westfield State University - Renovate Parenzo Hall/Demo Mod Hall, Westfield, MA. This project is for renovations to better fit the current needs of Westfield State University, including the addition of HVAC, sprinkler system, new windows, asbestos removal, updates for Building Code/ADA compliance, updates to Dever Auditorium, and demo of Mod Hall. The Construction Manager is Daniel O'Connell's Sons.
09/16/2021 04:00 PM UTC
TRC1905
Third Street Courthouse - Envelope Repairs, Cambridge, MA. This project is for complete removal and disposal of the entire SBS roofing system; repair copper roofing; removal and disposal of skylight, Cupola cladding, and exterior window; restoration of exterior brick and granite; replacement of existing air handler; relocation of existing chiller; renovations at the detention center to add a cell and change entry/existing cell to improve privacy; slab modifications in Sally Port. This project includes the following Filed Sub-Bids: Masonry; Miscellaneous & Ornamental Iron; Waterproofing, Dampproofing & Caulking; Roofing & Flashing; Metal Windows; Glass & Glazing; Fire Protection; Plumbing; HVAC; Electrical. The Category of Work is General Building Construction. Please see the SSI Attachment: Confidentiality Agreement. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
09/14/2021 06:00 PM UTC
BHC1901 - Trade RFQ - Plumbing 2nd Request
Request for Qualifications for One (1) Trade Contractor Package: Early Plumbing – 2nd Request ($42,000), for Bunker Hill Community College - New Academic Student Success Center - Building E Renovation, Boston, MA. This project is for construction of a new building, partial renovation of E Building, which was constructed in 1973, the demolition of the M Building (modular building), and the replacement of the primary electrical infrastructure on the Charlestown Campus.
09/09/2021 04:00 PM UTC
DOC2003 - CM RFQ
Request for Qualifications for Construction Management at Risk Services for DOC Plymouth - Massachusetts Alcohol and Substance Abuse Center (MASAC) Section 35 Upgrades, Plymouth, MA. This project includes renovation and reorganization of approximately 5,500 SF of interior space across three buildings; a decrease of current capacity to allow for single-occupancy rooms while addressing existing ligature issues; the addition of large community rooms and individual therapy rooms; large, shared restroom spaces to be divided into smaller, single-use shower, toilet, lavatory rooms; repairing or replacing roofing systems and window systems; major building infrastructure repairs and replacement; site-related alterations for accessibility; and additional site work. All CM firms must be Certified in General Building Construction.
09/07/2021 06:00 PM UTC
WSC1901 - Trade RFQ
Request for Qualifications for One (1) Trade Contractor Package: Waterproofing, Dampproofing & Caulking ($78,000), for Westfield State University - Renovate Parenzo Hall/Demo Mod Hall, Westfield, MA. This project is for renovations to Parenzo Hall to better fit the current needs of Westfield State University. The project will include addition of HVAC, sprinkler system, new windows, asbestos removal, updates for Building Code/ADA compliance, updates to Dever Auditorium, and demo of Mod Hall. The Construction Manager is Daniel O'Connell's Sons.
08/19/2021 04:00 PM UTC
DPH1641 - Trade RFQ
Request for Qualifications for Four (4) Trade Contractor Packages: Waterproofing, Dampproofing & Caulking ($475,479); Meta Windows ($2,779,942); Resilient Floors - Second Request ($1,234,288); Electrical - Second Request ($19,633,666), for Mass. Department of Public Health, Jamaica Plain Campus Tower Building Renovation, Jamaica Plain, MA. This project is for the phased renovation of an approximately 208,000 GSF, eight-story plus basement building that contains laboratory, administrative, and research space. Built in the 1970’s, this building is cast-in-place construction with MEP systems that warrant special construction due to the sophistication and complexity of the program and operations housed in the building. The building will remain occupied throughout construction and remain 24/7/365 operational. The Construction Manager is The Whiting-Turner Contracting Co.