General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
OSM 10(6495)101.1
Abandoned Mine Reclamation Project, West Liberty South #1, Brady Township, Butler County Estimated Amount: $500,000 to $1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 Each Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 672 L.F. Clearing and Grubbing, 1 L.S. Subsurface Drains with Cleanouts, 1,750 L.F. Grading, 252,589 C.Y. Planting – Tree Seedlings, 9,318 EACH READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
05/09/2024 06:00 PM UTC
OSM 10(6493)102.1
Abandoned Mine Reclamation Project West Liberty East #3, Brady Township and West Liberty Borough, Butler County Estimated Amount: $300,000-$500,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32" Diameter), 1,530 L.F. Grading - Grading, 66,293 C.Y. Subsurface Drain, 386 L.F. Sealing Mine Openings - Sealing Mine Openings, 1 EACH
04/04/2024 06:00 PM UTC
OSM 33(4911)101.1
Abandoned Mine Reclamation Project South Timblin Porter Township, Jefferson County Estimated Amount: $100,000-$200,000 (Small Business Only) Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction, Entrance, 1 Each Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter, Sock Eighteen-Inch (18”) Diameter, Stacked, 2,050 L.F. Grading, 35,500 C.Y. Seeding – Seed Bed Preparation, 5.0 Acres
03/14/2024 06:00 PM UTC
OSM 32(3591)101.1
Abandoned Mine Reclamation Project Johnsonburg #2 Banks Twp., Indiana County Estimated Amount: $200,000-$299,000 (Small Business Only) Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 1,100 L.F. Grading – Grading, 18,700 C.Y. Subsurface Highwall Drain, 450 L.F. Planting – Tree Seedlings, 2,584 EACH
02/22/2024 07:00 PM UTC
EC-65-81369-23
Storage Tank Removal Pitzer Transport, Inc. City of Jeannette, Westmoreland County Estimated Amount: $0-$100,000 (Small Business Only) Term: 90 calendar days No Bid Bond Required Principal Items of Work and Approximate Quantities: Removal of one steel underground storage tank system. (1 10,000-gallon diesel underground storage tank) Tank is uncapped and has 25 5/8 inches of water and 3/8 inches of product at the last inspection. There is a need to pump the tanks of liquid and property dispose of liquid. A closure report is required as well as closure sampling.
02/22/2024 07:00 PM UTC
OSM 13,54(3204)101.1
Abandoned Mine Reclamation Project Honeybrook-Audenried Banks Township, Carbon County Kline Township, Schuylkill County Estimated Amount: $500,000-$1,000,000 Term: 90 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Removal and Disposal of Structures Seedings READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 18%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
11/30/2023 07:00 PM UTC
OSM 65(1199)102.1
Abandoned Mine Reclamation Project Bovard Area Wide Subsidence Hempfield Township, Westmoreland County Estimated Amount: Greater Than $5,000,000 Term: 630 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Overburden Drilling and Casing, Steel or PVC, 10,203 L.F. Four-Inch (4") Air Rotary Drilling, 33,942 L.F. Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 32,224 L.F. Supply and Delivery, Mixing and Injection of Grout Material - Cement, 5,045 TON Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 29,522 DRY TON Supply and Delivery, Mixing and Injection of Grout Material - Stone (AASHTO No. 57), 20 TON Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 17,892 DRY TON Injection Site Preparation and Site Restoration, 497 EACH READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
11/30/2023 07:00 PM UTC
OSM 26(0690)101.1
Abandoned Mine Reclamation Project, Juniata West, Franklin Township, Fayette County Estimated Amount: $100,000-$200,000 (Small Business Only) Term: 270 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 2 Each Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 1,800 L.F. Clearing and Grubbing, 1 L.S. Grading, 16,060 C.Y. Seeding – Seed Bed Preparation, 6.3 Acre
08/31/2023 06:00 PM UTC
OOGM 23-1 (Reissued Extension)
Cleaning Out and Plugging Thirteen (13) Abandoned Permitted/Rule Authorized Class IIR Injection Wells, Highland Township, Elk County Estimated Amount: $500,000-$1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug thirteen (13) abandoned injection wells, estimated to be up to 2,500 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: June 29, 2023 at 9:00 a.m. Department representatives will meet contractors at: Dj’s Russell City Store, 1536 Route 66, Russell City, PA 16735. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
07/27/2023 06:00 PM UTC
OOGM 23-3
Cleaning Out and Plugging Ten (10) Abandoned Permitted/Rule Authorized IIR Injection Wells, Highland Township, Elk County Estimated Amount: $500,000-$1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug ten (10) abandoned injection wells, estimated to be up to 2,700 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: June 29, 2023, at 9:00 a.m. Department representatives will meet contractors at: Dj’s Russell City Store, 1536 Route 66, Russell City, PA 16735. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
07/20/2023 06:00 PM UTC
11 - 20 of 152 Solicitations