OSM 11(3266)102.1
Abandoned Mine Reclamation Project, Cymbria II, Susquehanna Township, Cambria County.
Estimated Amount: $300,000 to $500,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clearing and Grubbing, 20.2 Acre; Permanent Swales with R-4 Rock Check Dams, 1,070 L.F.; Grading, 169,119 C.Y.; Tree Planting, 11,450 Tree.
*There are no goal requirements for this project.
Please note: Contract Drawing 5 of 6 for the Permanent Swales W/ Rock Check Dams should read “ To be lined with erosion matting which shall be Curlex II as manufactured by American Excelsior Company, 850 Avenue H East Arlington, TX 76011 or approved equivalent . Telephone 817-385-3500”.
| 07/08/2021 06:00 PM UTC |
OSM 02(1726,0385)103.1
Abandoned Mine Reclamation Project, Penn Hills, Municipality of Penn Hills, Allegheny County.
Estimated Amount: $300,000 to $500,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Trench Excavation, 1,165 C.Y.; Smooth Interior Corrugated Polyethylene Pipe, 300 L.F.; Smooth Interior Corrugated Polyethylene Pipe Junction, 12 Each; Rock Lining with Geotextile, 415 Ton; Precast Concrete Inlet Box, 1 Each; PA DOT 2A Stone, 100 C.Y.; Boring - Twenty-four-inch (24”) Steel Casing, 275 L.F.; Subsurface Drain - Twelve-inch (12”) Polyvinyl Chloride (PVC) Pipe, 310 L.F.; Subsurface Drain - Eight-inch (8”) Polyvinyl Chloride (PVC) Pipe, 975 L.F.; Subsurface Drain - AASHTO No. 1 Coarse Aggregate, 860 C.Y.
*There are no goal requirements for this project.
| 07/08/2021 06:00 PM UTC |
OSM 32(3246)101.1
Abandoned Mine Reclamation Project
Upper Two Lick West
White Township, Indiana County
Estimated Amount: $500,000 to $1,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Eight-Inch (8”) PVC Pipe Including Fittings – 1,250 LF
Eight-Inch (8”) Ductile Iron Pipe Including Fittings – 2,900 LF
Six-Inch (6”) Ductile Iron Pipe Including Fittings – 2,075 LF
Service Lateral Connections - Three-Quarter Inch (3/4") Service – 22 Each
Gas Line Crossing – 150 LF
Stream Crossing – 120 LF
Two-Inch (2”) Automatic Air Release Valve – 3 Each
Typical Above Ground Blow-Off Assembly – 3 Each
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
*Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%.
If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1.
If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5).
If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5).
Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule.
Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 06/03/2021 06:00 PM UTC |
OSM 17(0846)101.1
Abandoned Mine Reclamation Project
Waltzvale West
Gulich and Bigler Townships, Clearfield County
Estimated Amount: $500,000 to $1,000,000
Term: 360 calendar days
Bid Bond Required
NO GOALS WERE DETERMINED FOR THIS PROJECT. ATTACHMENT A HAS BEEN OMITTED.
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Implementation of the Erosion and Sediment Pollution Control Plan –
Compost Filter Sock (32” Diameter), 5,000 L.F.
Subsurface Drains with Cleanouts, 350 L.F.
Grading, 220,000 C.Y.
Channel Excavation, 1,400 C.Y.
Rock Lining with Filter Blanket, 650 S.Y.
Seeding – Seed Bed Preparation, 29 Acres
Seeding - Tree Seedlings (25 acres), 17,010 Each
| 05/27/2021 06:00 PM UTC |
OOGM 20-3
Cleaning Out and Plugging Six Abandoned Wells
Sugarcreek Borough, Venango County
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 180 calendar days
Bid Bond NOT Required
Principal Items of Work and Approximate Quantities:
Clean out and plug six (6) abandoned wells, estimated to be up to 1,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY PRE-BID CONFERENCE:
May 13, 2021 at 9am
Sugar Valley Lodge
323 Causeway Drive
Franklin, PA 16323
FAILURE TO ATTEND THE PRE-BID CONFERENCE WILL BE CAUSE FOR REJECTION OF THE BID.
| 05/27/2021 06:00 PM UTC |
OOGM 20-2
Cleaning Out and Plugging One Abandoned Well in Ross Township, Allegheny County.
MANDATORY PRE-BID MEETING SCHEDULED FOR MARCH 25, 2021 AT 10:00 AM. MEET DEP REP AT 129 MAYER DRIVE IN PITTSBURGH, PA 15237.
Estimated Amount of Project: $200,000 to $299,999 (Small Business Only); Term: 120 calendar days; Bid Bond NOT Required.
Principal Items of Work: Clean out and plug one (1) abandoned well, estimated to be up to 3,000 feet in depth, to Department specifications; prepare and restore well site; mobilize and demobilize plugging equipment.
| 04/15/2021 06:00 PM UTC |
OSM 32(4806)102.1
Abandoned Mine Reclamation Project, Canoe Ridge South, Canoe Township, Indiana County. Estimated Amount: $100,000 to $200,000 (Small Business Only). Term 360 calendar days. Bid Bond Required.
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.; Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (Eighteen-Inch [18"] Diameter), 2,000 L.F.; Grading, 48,000 C.Y.; Seeding, 9 Acres.
| 03/25/2021 06:00 PM UTC |
OSM 18(1123,6679)101.1
Abandoned Mine Reclamation Project, Huling Branch East
Noyes and Leidy Townships, Clinton County
Estimated Amount: Greater than $5,000,000
Term: 455 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Perforated Twelve-Inch (12") PE pipe, 3,265 L.F.
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Solid Twelve-Inch (12") PE pipe, 130 L.F.
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
AASHTO No. 1 Calcareous Coarse Aggregate, 13,112 Ton
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Calcareous Modified 2A Aggregate, 500 Ton
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Non-Calcareous AASHTO No. 1 Coarse Aggregate, 7,155 Ton
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Ethylene-Propylene-Diene Terpolmer (EPDM) Impervious Lining, 9,496 S.Y.
Revamped Treatment Pond
Coal Refuse Removal, 12,500 C.Y.
Revamped Treatment Pond
Ethylene-Propylene-Diene Terpolymer (EPDM) Impervious Lining, 5,393 S.Y.
Fence, 1,300 L.F.
Alkaline Addition (Limestone Screenings), 50,800 Ton
Grading, 450,481 C.Y.
Reconstruct Recreational Trails, 5,610 L.F.
Forestland Preparation for the Forest Reclamation Approach Backfill, 18.8 Acre
Tree Planting, 16,750 Tree
Seeding - Wildlife Habitat – Mulching, 22.9 Acre
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
*Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 7%, VBE - 3%.
If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1.
If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5).
If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5).
Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule.
Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 02/18/2021 07:00 PM UTC |
OSM 17(0111)101.1
Abandoned Mine Reclamation Project
Madera North Side, Bigler Township, Clearfield County
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Diversion and Care of Water, 1 L.S.
Trench Excavation, 600 C.Y.
Subsurface Drain – Pipe, 500 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 500 C.Y.
Repaving – Base Course, 77 TON
Repaving – Binder Course, 40 TON
Traffic Control, 1 L.S.
Office Facility, 1 L.S.
| 02/04/2021 07:00 PM UTC |
OSM 11(2464)103.1
Abandoned Mine Reclamation Project
Vintondale Refuse Pile Reclamation
Vintondale Borough, Cambria County
Estimated Amount: $1,000,000 to $5,000,000
Term: 910 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan and Highway Occupancy Permit, 1 L.S.
Coal Refuse Removal and Grading - Coal Refuse Removal, 215,000 C.Y.
Coal Refuse Removal and Grading - Coal Refuse Grading, 10 ACRE
Equipment Storage Area, 278 S.Y.
Seeding - Mulching, 10 ACRE
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
*Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%.
If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1.
If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5).
If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5).
Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule.
Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 02/04/2021 07:00 PM UTC |