General Info

Business Logo

City of Worthington, OH - Service and Engineering Department

6550 N High St, Worthington, OH 43085-4016
(614) 431-2425

Worthington was one of the Midwest’s first planned communities, blending commerce, residential life, education and faith. Founded in 1803, Worthington reflects its dignified New England heritage with authentic brick sidewalks leading to the central village green, where many of the City’s original commercial buildings and churches still stand proudly. Just north of Columbus on US Route 23, Worthington's small town charm is just minutes from all Central Ohio has to offer.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
2021 Street Improvements Program Project No. 717-21
Construction of ADA compliant curb ramps & sidewalks, asphalt pavement, planing and overlay, spot curb & gutter replacement, asphalt pavement repair, asphalt rejuvenation, inlet repair, drainage and other improvements. Engineer's Estimate is $910,964.40
06/02/2021 04:00 PM UTC
McCord Park Renovations Project No. 716-21
The City of Worthington completed its McCord Park Master Plan in 2020 and has designed the first phase of improvements. This will be a large capital improvements project including the relocation and construction of ball diamonds, a soccer field, parking areas, shelter house and a railroad observation area with a restored caboose.
05/12/2021 04:00 PM UTC
City of Worthington Police Building Modifications Project No. 695-19
The City of Worthington has made extensive upgrades to its Police Building at 6555 Worthington Galena Rd. These upgrades include a new secured entryway, a new HVAC system with filtration engineered to help mitigate mold formation, and a new roof. All this was done to seal the building envelope and mitigate the presence of mold. The final step in the modifications project is to mitigate the mold, paint, replace flooring (105 SY carpet tile, 9000 SF LVT), label and extend electrical systems and minimal plumbing. Mold mitigation will be the largest portion of the project. Estimated square measurement to be mitigated: 51,500 Square feet of wall 19,850 Square feet of ceiling 20,100 Square feet of floor A certified and licensed mold mitigation contractor MUST perform the selective demolition and removal of mold affected surfaces, finishes and furnishings, as well as the mitigation and prevention of mold prior to the general or sub contractors performing the replacement of drywall, flooring and other finishes as well as the electrical and plumbing work. As such, the project will occur in several phases outlined in the supplemental specifications. ALL BIDDERS WILL BE REQUIRED TO ATTEND AN ONLINE PRE-BID MEETING THURSDAY APRIL 29th at 10:00AM via the link. Topic: City of Worthington Police Building Improvements Pre Bid Time: Apr 29, 2021 10:00 AM Eastern Time (US and Canada) Join Zoom Meeting https://us02web.zoom.us/j/87330385128 Meeting ID: 873 3038 5128 One tap mobile +13017158592,,87330385128# US (Washington DC) +13126266799,,87330385128# US (Chicago) Dial by your location +1 301 715 8592 US (Washington DC) +1 312 626 6799 US (Chicago) +1 929 205 6099 US (New York) +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) +1 669 900 6833 US (San Jose) Meeting ID: 873 3038 5128 Find your local number: https://us02web.zoom.us/u/kbhYD7R4zN Alternatively you may contact Rob Chandler at robert.chandler@worthington.org or Scott Treadway at scott.treadway@worthington.org to register for the pre-bid meeting.
05/12/2021 04:00 PM UTC
Rush Run Stream Bank Stabilization Project No. 688-19
City of Worthington Rush Run Stream Bank Stabilization. The project involves some stream redirection, movement of existing deposition, and the stabilization of a severely eroded stream bank. Engineer's Estimate for the project is $76,000.00
02/24/2021 05:00 PM UTC
Worthington Community Center Pools Resurfacing 706-20
City of Worthington Community Center Pools Resurfacing: Resurfacing of the Diamond Brite Finish in the Leisure and Lap pools of the Worthington Community Center, 345 E. Wilson Bridge Rd. Worthington, Ohio 43085
01/27/2021 05:00 PM UTC
Window & Door Replacements Municipal Building & City Hall Project No. 713-21
Window and Door replacements at the City of Worthington Municipal Building, 6550 N. High St. Worthington, OH 43085 and the Griswold Center 777 N. High St. Worthington, OH 43085.
01/27/2021 05:00 PM UTC
City of Worthington Reflective Rapid Flashing Beacon Project No. 693-19
City of Worthington RRFB-Installation of a Rectangular Rapid Flashing Beacon, pedestrian crossing with Refuge Island and associated curb ramps at E. Dublin Granville Rd and Pingree Dr. in Worthington, Ohio
01/27/2021 05:00 PM UTC
Huntley Bowl Park Detention Basin Retrofit Project No. 708-20
The construction of stormwater detention basin retrofits at the existing Huntley Bowl Park in Worthington, OH 43085
01/27/2021 05:00 PM UTC
2020 Sewer Lining & Rehabilitation, Project No. 711-20
Lining of 6", 8", 10" 12" sanitary and 12", 15", 24", 42" storm sewers. Engineers Estimate $733,096.35. Contract period 90 days. Contract execution expected the week of November 23rd.
10/16/2020 04:00 PM UTC
695-19 Police Department New Security Door and Vestibule Improvements
City of Worthington Police Station Vestibule Improvements 6555 Worthington Galena Rd., Worthington, OH 43085
06/24/2020 04:00 PM UTC
21 - 30 of 51 Solicitations
1 3 5 6