General Info

Business Logo

Clinton County Engineer's Office

1326 Fife Ave, Wilmington, OH 45177
(937) 382-2078


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
2024 Clinton County Pavement Marking
Centerline and edgeline striping of various County and Township roads in Clinton County, Ohio with ODOT Item 642 striping. Approx. 46.826 miles of centerline and 81.452 miles of edgeline on County roads with additional mileage on Township roads possible.
09/18/2024 02:00 PM UTC
CLI-CR-15-5.78 GURNEYVILLE RD BRIDGE REHABILIATION (OPWC CJ28AA)
Remove, replace, and widen existing superstructure of bridge CLI-CR-15-5.78 SFN 1432125. Project includes new bridge railings and minimal approach and site work.
09/18/2024 02:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
PID 115632 CLI-CR-VAR-GR-FY25
This project consists of the removal of obsolete guardrail and the installation of new Type MGS guardrail at various locations throughout Clinton County, Ohio.
08/14/2024 01:30 PM UTC
PID 109958 CLI-CR-12-4.43 Antioch
This project consists of widening, vertical profile adjustments, and resurfacing of approximately 0.53 miles of C.R. 12 (Antioch Road). Improvements include driveway profile adjustments and traffic control.
07/31/2024 03:15 PM UTC
PID 115214 CLI-TR-256-0.01 Pratt Rd. Bridge Replacement
Design-build contract for the complete replacement of structure 1447165 (CLI-TR-256-0.01), Pratt Rd. over the East Fork of Todd Fork. Project included associated approach roadway work (pavements, signing, guardrail, etc.) including some horizontal and vertical realignments.
04/17/2024 02:00 PM UTC
Clinton County 2024 Roadway Sealing
Furnishing materials and labor to chip and seal various County and Township roads in Clinton County. Fog seal is included on several roads.
03/27/2024 02:00 PM UTC
CLI CR VAR Resurfacing 2024
THIS PROJECT CONSISTS OF OVERLAYING THE EXISITNG PAVEMENTS ON CR-09, CR-16, CR-23, CR-30, AND CR-61 WITH PAVEMENT PLANING, PAVEMENT REPAIR, NEW ASPHALT SURFACE AND INSTALLING NEW PAVEMENT MARKINGS.
03/27/2024 02:00 PM UTC
CLI-CR-12-1.419 Antioch / Bernard Intersection Improvements (OPWC CJ25Z)
[insert suggested formatting of generally used description]
09/13/2023 01:30 PM UTC
2023 Clinton County Pavement Markings
Centerline and edgeline striping of various County and Township roads in Clinton County, Ohio with ODOT Item 642 striping. Approx. 43.157 miles of centerline and 76.212 miles of edgeline on County roads with additional mileage on Township roads possible.
09/06/2023 02:00 PM UTC
PID 109961 CLI-CR-VAR-PM-FY24
Improvement of 67.316 miles of various County roads in Clinton County, Ohio by placement of polyester pavement marking on the centerline of roadways. Also improvement of 106.924 miles of various County roads by placement of 6" polyester pavement marking on the edge line of roadways.
07/19/2023 02:15 PM UTC
PID 109959 CLI-CR-VAR-GR-FY24
This project consists of the removal of obsolete guardrail and installation of new Type MGS guardrail at various locations throughout Clinton County, Ohio.
07/19/2023 02:00 PM UTC
CLI-CR-VAR Resurfacing 2023
[insert suggested formatting of generally used description]
05/03/2023 02:00 PM UTC
1 - 10 of 37 Solicitations
← Previous 1 3 4