Replacement of Bridge No. 078003, South Buckboard Lane over Foot Sawmill Brook
The Project primarily consists of removal of an existing metal pipe culvert and replacement with a precast concrete rigid frame.
| 02/11/2025 03:00 PM UTC |
Number | Deadline |
---|---|
NRCS Emergency Watershed Protection Program Disaster Recovery, Town of Chester, Connecticut
The Project primarily consists of removing aggraded material, regrading channel,
reestablishing bank protection and providing fisheries habitat elements in Great Brook and
Pattaconk Brook.
| 03/13/2023 06:00 PM UTC |
North Main Street Sidewalks - Phase 3
The Project primarily consists of construction of sidewalks, driveway aprons, and minor storm drainage.
| 02/21/2023 03:00 PM UTC |
Old Saybrook Route 1 and Elm Street Sidewalks
Project consists of concrete sidewalk, curbing, bituminous concrete driveway construction, and minor storm drainage construction.
| 02/14/2023 03:00 PM UTC |
Replacement of Bridge No. 074007, Birch Mill Road over Falls Brook, Lyme, CT
The Project primarily consists of replacing a short span bridge with a single cell precast concrete box culvert.
| 12/22/2022 07:00 PM UTC |
Lake Shore Drive Culvert Replacement
The Project primarily consists of installing precast concrete culvert and channel components, storm drainage, minor water distribution system, and full depth roadway improvements.
| 11/16/2022 04:00 PM UTC |
Town of Marlborough, Connecticut, Stony Brook Drive Storm Drainage Improvements System No. 1 & System No. 4
The Project primarily consists of the installation of approximately 310 linear feet of storm drainage pipe and storm drainage structures for System No. 1 and approximately 560 linear feet of storm drainage pipe and storm drainage structures for System No. 4 and trench pavement and curb placement.
| 08/31/2022 02:00 PM UTC |
Drainage Improvements Park Road and North Main Street Intersection, Marlborough, Connecticut
Project primarily consists of the installation of approximately 100 to 250 linear feet of storm drainage.
| 07/13/2022 06:00 PM UTC |
Main Street Sidewalks (South), Durham, CT
The Project primarily consists of sidewalk construction with minor storm sewer drainage installation.
| 05/03/2022 02:00 PM UTC |
Pickett Lane over Herzig Brook
The Project primarily consists of replacing a single corrugated metal pipe culvert with a single precast concrete rigid frame.
| 12/21/2021 07:00 PM UTC |
Beaver Meadow Road Culvert Replacement, Haddam, CT
The Project generally consists of a culvert replacement with associated road work, drainage and site restoration.