General Info

Business Logo

Nathan L. Jacobson & Associates, Inc.

86 Main Street, Chester, CT 06412
(860) 526-9591


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Beaver Meadow Road Culvert Replacement, Haddam, CT
The Project generally consists of a culvert replacement with associated road work, drainage and site restoration.
12/08/2021 03:00 PM UTC
Bridge Road Sidewalks, Haddam, Connecticut
The project primarily consists of sidewalk, sight lighting, a retaining wall, and storm drainage construction.
12/01/2021 02:00 PM UTC
Maintenance Dredging of Chester Creek, Chester, CT
The Project primarily consists of dredging material to -6 MLW plus 1 foot allowable over dredge depth over a 500 (+/-)-foot-long by 50-foot-wide project area at the mouth of Chester Creek and disposing of material to a disposal area north of and adjacent to the dredging area.
11/12/2021 03:00 PM UTC
Haddam Center Sidewalks, Haddam, Connecticut
The Project includes concrete sidewalk installation, paving, installation of rectangular rapid flashing beacons, and site restoration.
10/27/2021 02:00 PM UTC
Bridge Road Sidewalks, Haddam, Connecticut
The project primarily consists of sidewalk, sight lighting, a retaining wall, and storm drainage construction.
10/27/2021 01:00 PM UTC
Haddam Center Sidewalks, Haddam, Connecticut
The Project includes concrete sidewalk installation, paving, installation of rectangular rapid flashing beacons, historic markers and site restoration.
05/24/2021 02:00 PM UTC
Sidewalk Improvements, Portland, CT
Project primarily consists of the replacement of concrete sidewalks, curbing and driveway aprons along with pavement repair and site restoration.
04/28/2021 03:00 PM UTC
North Parker Road Culvert Replacement, Marlborough, CT
The Project primarily consists of installing a precast concrete box culvert and wingwalls (furnished by the Town) and roadway construction.
04/01/2021 02:00 PM UTC
Ingham Hill Road Trail Head Parking, Old Saybrook, CT
The Project primarily consists of construction of a 13-vehicle parking area, including erosion control, grading, minor paving, timber guide rail and restoration.
03/26/2021 06:00 PM UTC
South Main Street Guiderail Replacement, Marlborough, CT
Project primarily consists of installation of approximately 600 feet of guiderail.
03/24/2021 02:00 PM UTC
41 - 50 of 64 Solicitations
1 2 3 5 7