Nathan L. Jacobson & Associates, Inc.
86 Main Street, Chester, CT 06412
(860) 526-9591
86 Main Street, Chester, CT 06412
(860) 526-9591
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Replacement of Bridge No. 078003, South Buckboard Lane over Foot Sawmill Brook
The Project primarily consists of removal of an existing metal pipe culvert and replacement with a precast concrete rigid frame.
| 02/11/2025 03:00 PM UTC |
Number | Deadline |
---|---|
Protective Screen for Bridge 04749, Nehantic Trail #2 Over Mud Creek, Old Saybrook, CT
The Project primarily consists of installation of approximately 190 total linear feet of 9 ft. tall white MADOT Type 1 Protective Screen with curved top, on the existing bridge rail system.
| 12/30/2020 03:00 PM UTC |
Marlborough Pump Station, Marlborough, CT
The Project primarily consists of disconnecting the existing pump station from Elmer Thienes-Mary Hall Elementary School’s electrical service. A new electrical service will be provided to the municipal domestic water pump station and maintained by the local water authority, inclusive of re-using existing conduits, new feeders as well as new distribution systems.
| 10/21/2020 02:00 PM UTC |
Town Center Sidewalks - Jones Hollow Road, Cheney Road & North Main Street, Marlborough, CT
The Project includes two separate contracts, each primarily consisting of concrete sidewalk installation, curbing, paving and site restoration.
| 09/10/2020 02:00 PM UTC |
Route 1 Sidewalks from Pond Road to Lynde Street, Old Saybrook, CT
Project consists of sidewalk installation, curbing, paving site, restoration and design and installation of a modular prefabricated retaining wall.
| 07/27/2020 02:00 PM UTC |
Repairs to South Main Street Phase 2, Marlborough, CT
The Project primarily consists of milling and overlaying, full-depth pavement repairs, and storm drainage installation.
| 07/23/2020 02:00 PM UTC |
Blackledge Soccer Field Irrigation System, Marlborough, CT
The Project primarily consists of new irrigation system control panel, irrigation system electronic and manual valves and valve boxes, new well pump and appurtenances, water piping, valves and appurtenances, sump pump, drainage piping, concrete base and electrical enclosure, electrical equipment and conductors.
| 07/22/2020 06:00 PM UTC |
Replacement of Culvert Carrying Bethke Road over Powder Meadow Brook, Killingworth, CT
Project primarily consists of replacing a corrugated metal pipe culvert with reinforced concrete box culvert.
| 06/22/2020 06:00 PM UTC |
Salt Storage Facility Improvements, Portland, CT
Project generally consists of installation of a geomembrane liner and geocomposite drain, storm drainage, grading, paving, and site restoration.
| 06/02/2020 03:00 PM UTC |
Blish Memorial Park Walkway Construction, Town of Marlborough, CT
Project primarily consists of installation of approximately 4,700 square feet of concrete sidewalk.
| 04/13/2020 02:00 PM UTC |
Main Street Improvements Phase 3, Chester, CT
Streetscape reconstruction including roadway, sidewalk, storm drainage, street lights, and retaining walls.
| 03/02/2020 03:00 PM UTC |