State of Oklahoma, Division of Capital Assets Management, Construction & Properties
1915 N Stiles Ave, Oklahoma City, OK 73105-4919
(405) 521-2112
See attachments for important information regarding submitting bids.
1915 N Stiles Ave, Oklahoma City, OK 73105-4919
(405) 521-2112
See attachments for important information regarding submitting bids.
Name * | Description | |
---|---|---|
BidExpressAccountRegistration.pdf (193 KB) | ||
BidExpressElectronicSignatures.pdf (124 KB) | ||
BidExpressHowToBid.pdf (201 KB) | ||
Bid Submittal Eff 3.16.2020.pdf (66 KB) | ||
Number | Deadline |
---|---|
CAP25-0131
Update old pneumatic controls to new digital climate controls throughout the main complex and connected to the existing I Vu Pro climate control system.
| 01/30/2025 08:00 PM UTC |
CAP25-0147
Denver Davison Electrical Upgrade. Replacement of existing electrical distribution equipment, including but not limited to panelboards, load centers, transformers in violation with the National Electric Code.
| 01/30/2025 08:00 PM UTC |
CAP25-0150
The Project consists of the upgrade of the existing two (2) passenger elevators, including equipment
replacement, cab finish replacement, and miscellaneous code upgrades.
| 02/13/2025 08:00 PM UTC |
CAP25-0151
The Project consists of the upgrade of the existing four (4) passenger elevators and one (1) freight elevator,
including equipment replacement, cab finish replacement and miscellaneous code upgrades.
| 02/13/2025 08:00 PM UTC |
CAP25-0148
The Project consists of the replacement of existing curtainwall at the east entrance to the Denver Davison
Building with new curtainwall. Project includes the replacement of interior floor tile at the vestibule and a portion of the exterior to allow for waterproofing of the slab edge and improved drainage at the entrance.
| 02/13/2025 08:00 PM UTC |
CAP24-0120
CAP24-0120 - Spiro Mounds Museum Restroom Renovation - Spiro, OK - OHS
| 02/18/2025 08:00 PM UTC |
CAP24-0087
The Project consists of the base bid construction of an addition to the existing Career Center building, renovation of the existing building, associated site and utility work, and new perimeter fencing.
| 02/27/2025 08:00 PM UTC |