General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-170391 Transportation Implementation Plan BP4 - Corrections Lot
This project installs new asphalt parking lot, screening fence, plantings, and completes other improvements to the area south of the Biological Sciences Building and north of 12th Avenue.
06/07/2017 05:00 PM UTC
OSU-170240 Tuttle Garage - Oxley 2 Upgrades
This project is an interior renovation of a portion of the interior tenant space on the east side of the first floor of the Tuttle Parking Garage. Renovation includes rework of current layout, including alarm system, and new finishes. The new space is designed to be a grab-and-go dining facility for guests.
05/26/2017 02:00 PM UTC
OSU-150679, 300 W. 10th-Rooms 440 and 442 REBID
Renovation of three operating room suites. Upgrades include wall finishes, replacing existing ceramic tile with full height wall protection, and electrical work. New ceiling hung medical booms are planned to replace the existing including medical gases, electrical and structural work. New AV pathways will be provided for new equipment. Sprinkler and fire alarm work will be required for renovation work. Provide CO2 in ORs and tie into existing manifold in Rhodes/Doan Hall.
05/25/2017 05:00 PM UTC
OSU-160981 Road and Bridge Improvements Phase 2
This project will rehabilitate deteriorated drainage, driving surface and curbs
05/22/2017 06:00 PM UTC
OSU-160774 Drackett - Corridor Ceilings
Installation of lay-in ceiling system and lights.
05/18/2017 06:00 PM UTC
OSU-160559 Schottenstein - Suite Improvements
Interior finishes improvements to fifty (50) suites at The Ohio State University Schottenstein Arena.
05/09/2017 06:00 PM UTC
OSU-160380 BP2 Wexner Medical Center 72 Bed Build Out
The Work includes the completion of shelled spaces on the 10th and 12th floors of the James Cancer Hospital and Solove Research Institute. The total area of the project includes approximately 24,500 square feet on the 10th Floor, and 54,000 square feet on the 12th Floor. This project will be registered with USGBC for a minimum Silver LEED certification. The Work includes, but is not limited to interior architecture, plumbing, mechanical, electrical and fire protection systems.
05/02/2017 05:00 PM UTC
OSU-170391, Transportation Plan Implementation - Bid Package #2
OSU Main Campus: Parking lot and transportation system improvements. This work includes roadway, sidewalks, curbs, and parking lots.
04/26/2017 06:00 PM UTC
OSU-170391, Transportation Plan Implementation - Bid Package #3
OSU Columbus Campus: Bid Package #3 includes a transit hub and pedestrian corridor improvements. This package includes roadways, sidewalks and curbs.
04/26/2017 06:00 PM UTC
OSU-150009 Roof Repairs and Replacements (Phase 2) (BP1) REBID
Caldwell Lab and Dreese Lab Roof Replacements (REBID)
04/20/2017 06:30 PM UTC
491 - 500 of 594 Solicitations
1 2 46 47 48 50 52 53 54 59 60