Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty
department members and their lab personnel. Suite 121 is currently
fit out with single occupant research rooms and supporting
mechanical, electrical, and technology infrastructure. The intent of
this renovation is to remove the small research rooms and create an
open environment to support new research teams. This renovation
requires hazardous materials abatement, demolition, ADA
compliance review, and interior finish upgrades. Mechanical and
electrical design will include HVAC, electric, IT coordination, and fire
alarm modifications
| 04/24/2025 06:00 PM UTC |
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/07/2025 06:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-240693 - PRB - Quantum Physics Lab Mechanical Upgrades
A 1,620 SF interior renovation of two research labs at the basement level of the Physics Research Building on the OSU Columbus Campus This project includes minor demolition, construction of new interior partitions, new finishes, and associated mechanical, electrical, plumbing, and fire protection work.
| 03/11/2025 06:00 PM UTC |
OSU-190066 HVAC Replacements FY 2019 BP 2
Davis Heart and Lung Institute:
Replacement of HVAC controls on Air Handling and HVAC Equipment with new DDC controls.
| 03/07/2025 06:00 PM UTC |
OSU-230420 Pressey Rms 042T and 044T ADA Upgrades
The renovation of existing toilet rooms into compliant ADA toilet rooms. Renovation will include modification to architectural finishes, electrical, fire alarm, and plumbing systems. Included is the installation of one adult changing station and associated structural reinforcement.
| 02/27/2025 07:00 PM UTC |
OSU-230107 BP 1 Electrical Renovation FY 23-24 REBID
Replace main electrical distribution equipment in The Ohio State University’s Caldwell Laboratory Building including switchboards and panelboards.
| 02/20/2025 06:00 PM UTC |
OSU-230106 Plumbing Renovations FY23-24 BioScience
This is a Rebid. New domestic water and fire backflow preventors in a new location. Backfeed existing systems. Replacement of existing galvanized steel cold water piping throughout the facility. Installation of new piping prior to demolition of active mains. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility.
| 02/10/2025 06:00 PM UTC |
OSU-250003 - Ohio Stadium - Concession Stand Heaters
This project is for the installation of heaters within concession
spaces that provide heat during winter events. The current scope of the project includes the installation of 34 electrically powered heaters.
| 12/30/2024 07:00 PM UTC |
OSU-230431 1 Evans Hall Chiller Replacement REBID
Removal of existing chiller, providing new automatic propylene glycol feeder, providing 40% propylene glycol solution to fill system, installation of University purchased packaged chiller and transformer, provide concrete equipment pads, louvered fencing, site restoration, 200 gallon buffer tank, extending chilled water piping through roof to new chiller location, providing electric and controls from second floor mechanical room to University purchased chiller and transformer location outside on grade.
| 12/12/2024 07:00 PM UTC |
OSU-230686 Veterinary Medical Center AHU-1 & AHU-2 Damper Replacement
Replacement of the existing OA, RA, and EA dampers and damper actuators serving AHU-1 and AHU-2. Addition of freeze protection pumps and associated piping, valves and accessories for the pre-heat coils in AHU-1 and AHU-2. Integration of the new freeze protection pumps into the existing BAS.
| 12/12/2024 06:00 PM UTC |
Project OSU-230111 Road/Bridge Renewal FY23/24 RB 4
The planned scope of work includes rehabilitation of two bridges on The Ohio State University’s Main Campus: Woody Hayes over Olentangy River Road, Woody Hayes over Olentangy River. Maintenance level repairs generally include concrete patching/repairs, concrete walk repairs/replacement, joint and crack sealing, and deck sealing and repairs.
| 12/11/2024 07:00 PM UTC |
OSU-230499 Tunnel Rehabilitation Phase I BP 2
The project consists of the removal and replacement of the North McCracken tunnel roof, the complete removal of the North McCracken tunnel bypass, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct a new steam line within the North McCracken Tunnel. Under the Alternate 1 scope of work, a new water main will be constructed from the east end of the Oval to the west end and then up to the Cockins/Dulles loading dock area. The Alternate 2 scope of work provides alternate restoration methods to the North Oval Mall.
| 12/06/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.