Macomb County Department of Roads
117 South Groesbeck Highway, Mount Clemens, MI 48043
(586) 463-8671
117 South Groesbeck Highway, Mount Clemens, MI 48043
(586) 463-8671
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
MCDR 2025 Subdivision Reconstruction Program
Macomb County Department of Roads - 2025 SRP
WO No. 2135 (Vanker Avenue): This project includes complete removal of existing the pavement and driveways, station grading, culvert & storm sewer removal/replacement, HMA paving and turf restoration work in Shelby Township, Macomb County.
WO No. 2136 (Dartmoor Drive): This project includes complete removal of the existing pavement and driveways, station grading, culvert & storm sewer removal/replacement, HMA paving and turf restoration work in Shelby Township, Macomb County.
WO No. 2137 (Kingsway Drive): This project includes complete removal of the existing pavement and driveways, station grading, culvert & storm sewer removal/replacement, HMA paving and turf restoration work in Shelby Township, Macomb County.
WO No. 2138 (McKishnie Street): This project includes the complete removal of the existing pavement, removal of existing driveways, ditch grading, culvert & storm sewer replacement, driveway replacement, HMA paving and turf restoration work in Clinton Township, Macomb County.
WO No. 2139 (Copperwood Drive): This project includes the mill and overlay of the existing HMA pavement, curb and gutter removal/replacement, and turf restoration work in Washington Township, Macomb County.
| 04/29/2025 03:00 PM UTC |
MCDR_2025 SPMP
Install stop bars and cross walks and other special pavement marking
| 05/16/2025 03:00 PM UTC |
Number | Deadline |
---|---|
1965
Schoenherr Road : 500' S. Canal Road to M-59 (Hall Road) and NB Schoenherr Road : From 1000' N. Clinton River to 500' S. Canal .
This project includes : Pavement Surface Approximately 0.92 Miles. Cold milling of existing pavement, Concrete pavement Removal/Replacement, Curb and Gutter Removal/Replacement , Installation of sidewalk and ADA Ramp ,Joint and Crack Repair , Pavement marking , 3" HMA Overlay, including and adjustments of all necessary storm
and utility manholes in Sterling Heights, Macomb County. Sawing and Sealing Pavement Joints (NB
Schoenherr Rd. - 1000' N. Clinton River to 500' S. Canal)
| 03/31/2023 03:00 PM UTC |
03032023
Traffic Operations Center – Operations
| 03/03/2023 04:00 PM UTC |
12212022
Transportation Data Management and Analytics Dashboard
| 02/01/2023 04:00 PM UTC |
1968
Garfield Road - 22 Mile Road to 23 Mile Road
Construct 1.0 mile of HMA road. Construct right turn lane on 23 Mile Road to southbound Garfield Road. Project includes station grading, aggregate base, aggregate shoulders, subgrade undercutting, drainage improvements, HMA pavement, concrete curb and gutter, traffic signal installation and modernization and associated work.
| 11/01/2022 03:00 PM UTC |
4028
Wolcott Road over Tupper Brook Drain Box Culvert Replacement: This project includes the removal of a concrete structure and replacement with a precast concrete box culvert 11’ x 8’, full depth road construction, 3 inches of milling with HMA overlay, clearing brush and trees, culvert, aggregate shoulders, station grading, guardrail and slope restoration work in Armada Township, Macomb County.
| 08/05/2022 03:00 PM UTC |
1914 - Harper Avenue
Full depth concrete pavement removal/replacement, curb & gutter removal/replacement, turf restoration, and adjustments of all storm and utility manholes as necessary. Work in City of Saint Clair Shores, Macomb County.
| 06/28/2022 03:00 PM UTC |
1268-2022C
2022 CONCRETE PAVEMENT PRESERVATION PROJECT
This project includes a total of approximately 50,350 syds of concrete pavement repair with related joint repair, drainage, and restoration work on a number of locations throughout Macomb County
| 05/25/2022 03:00 PM UTC |
1897
West Road (Mound Road - Van Dyke Avenue)
APPROXIMATELY 1.0 MILES OF PAVEMENT MILLING, HMA OVERLAY, JOINT AND CRACK REPAIR, LANDSCAPE RESTORATION, AND PAVEMENT MARKINGS.
| 05/13/2022 03:00 PM UTC |
1905
2022 Subdivision Reconstruction Program in Macomb County. Roadway reconstruction, crush and shape existing roadway, storm sewer remove and replace, large and small culvert replacement, ditching, side walks and ADA ramps. Work in Clinton, Harrison, Macomb, Shelby, and Washington Township(s).
| 05/04/2022 03:00 PM UTC |
1268-2022A
2022 PAVEMENT PRESERVATION PROJECT
This project includes a total of approximately 25,000 tons of Hot Mix Asphalt (HMA) paving, 10,000 syd. of Cold Milling of Existing Pavement, 32,000 ft. of Joint and Crack Repair, drainage, and restoration work on a number of locations throughout Macomb County.
| 04/28/2022 02:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.