Macomb County Department of Roads
117 South Groesbeck Highway, Mount Clemens, MI 48043
(586) 463-8671
117 South Groesbeck Highway, Mount Clemens, MI 48043
(586) 463-8671
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
MCDR 2025 Subdivision Reconstruction Program
Macomb County Department of Roads - 2025 SRP
WO No. 2135 (Vanker Avenue): This project includes complete removal of existing the pavement and driveways, station grading, culvert & storm sewer removal/replacement, HMA paving and turf restoration work in Shelby Township, Macomb County.
WO No. 2136 (Dartmoor Drive): This project includes complete removal of the existing pavement and driveways, station grading, culvert & storm sewer removal/replacement, HMA paving and turf restoration work in Shelby Township, Macomb County.
WO No. 2137 (Kingsway Drive): This project includes complete removal of the existing pavement and driveways, station grading, culvert & storm sewer removal/replacement, HMA paving and turf restoration work in Shelby Township, Macomb County.
WO No. 2138 (McKishnie Street): This project includes the complete removal of the existing pavement, removal of existing driveways, ditch grading, culvert & storm sewer replacement, driveway replacement, HMA paving and turf restoration work in Clinton Township, Macomb County.
WO No. 2139 (Copperwood Drive): This project includes the mill and overlay of the existing HMA pavement, curb and gutter removal/replacement, and turf restoration work in Washington Township, Macomb County.
| 04/29/2025 03:00 PM UTC |
MCDR_2025 SPMP
Install stop bars and cross walks and other special pavement marking
| 05/16/2025 03:00 PM UTC |
Number | Deadline |
---|---|
1902
This project includes approximately 26,000 square yards of 3” milling existing pavement, 3,500 square yards of concrete pavement removal/replacement, 1,200 square feet of Sidewalk and Sidewalk Ramp, ADA, Modified, 2,400 feet of curb and gutter removal/replacement and 4,600 tons of HMA placement including adjustments of all necessary storm and utility manholes.
| 04/26/2022 03:00 PM UTC |
030222
2022 Special Pavement Marking Project
| 04/15/2022 03:00 PM UTC |
012522
2022 Longitudinal Pavement Marking
| 04/08/2022 03:00 PM UTC |
030122
2022 Guardrail Safety Project #030122
| 03/18/2022 03:00 PM UTC |
1903
This project includes 59,000 square yards of 3” milling existing pavement, 17,000 square yards of concrete pavement removal/replacement, 1,900 square feet of Sidewalk Ramp, ADA, Modified, 19,100 feet of curb and gutter removal/replacement and 10,000 tons of HMA, Modified placement including adjustments of all necessary storm and utility manholes.
| 03/09/2022 03:00 PM UTC |
4029
This project includes 3137 cubic yards of excavation to achieve 1000 cubic yards of excavation (compensating cut) below the 100 year flood elevation and restoration work located in Ray Township, Macomb County
| 09/09/2021 03:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.