General Info

Business Logo

City of Ravenna - Engineering

530 N Freedom St., Ravenna, OH 44266
(330) 296-5666


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
New Water Tank, 2024-F
The proposed work under this Contract consists of the removal of an existing 3 million gallon standpipe which was installed in 1983, and replacement with a 750,000 gallon composite water storage tank. The estimated cost for this project is $4,324,000.00.
06/13/2024 03:00 PM UTC
Spruce and Jefferson Water and Sidewalks, Contract #CG50AB/CG51AB
Project Description: The proposed work under this Contract consists of approximately 1454 lineal feet of 8" and 6" water line replacement with new valves, hydrants, and services, transferring 8 services from an existing 4" cast iron line to an existing 8" asbestos cement line, and 8638 square feet of sidewalk replacement. The estimated cost for this project is $601,454.00.
05/23/2024 03:00 PM UTC
FOXWOOD ESTATES SANITARY EXTENSION
The proposed work under this Contract consists of extending City sewer to service ten lots within Ravenna Township per Ohio Environmental Protection Agency orders. Work includes providing and placing 1,175 lineal feet of 8” SDR35 pipe and appurtenances, installing new precast manholes, installing wyes and running 6” SDR35 sanitary laterals to existing septic tank laterals, decommissioning existing septic systems, installing provided water meters on well lines, abandoning common septic system manholes and plugging two discharge points, asphalt trench paving, replacing concrete and asphalt drive aprons, and replacing sidewalks and curb ramps disturbed during construction. The estimated cost for this project is $389,270.00.
04/11/2024 03:00 PM UTC
Painting of Pavement Markings and Striping - Contract 2024-B
The proposed work under this Contract consists of 24.35 pass miles of pavement striping, removal of various pavement markings and striping, and various painted pavement markings throughout the City. This project includes downtown striping but excludes striping on SR59 due to ODOT resurfacing. The estimated cost for this project is $81,437.00.
02/29/2024 04:00 PM UTC
Annual Paving Program, 2024-A
The proposed work under this Contract consists of asphalt milling, base repairs and paving, Brick road reconstruction and associated work items, concrete roadway repairs and concrete intersection replacement, placement of new curb and gutter, sidewalk & curb ramp replacements and associated work items. The estimated cost for this project is $1,109,230.00 without alternates and $1,312,340.00 with all alternate items.
02/29/2024 04:00 PM UTC
POR Chestnut/Propsect (Ravenna) PID# 115360 - Chestnut & Prospect Resurfacing
Project Description: Improvements to 2.16 miles of North Chestnut Street and South Prospect Street located in the City of Ravenna, Ohio. Work includes asphalt milling and paving, chip seal interlayer, sidewalk replacement, ADA curb ramp improvements, and associated work items. DBE Goal: 7%
06/27/2023 03:00 PM UTC
Police Parking Lot Resurfacing
The proposed work under this Contract consists of asphalt milling, intermediate and surface course paving, full depth asphalt removal, concrete removal, and associated work items. This Contract contains four alternate items, three pertaining to the parking lot but the fourth proposes patching and resurfacing at Maple Grove Cemetery. The base estimated cost for this project is $74,000.00 and $116,700.00 total with all four alternates.
06/06/2023 03:00 PM UTC
Meridian and Murray Improvements - Contract 2023-CG
Project Description: The proposed work under this Contract consists of approximately 1,852 lineal feet of 8" and 6" water line replacement with new valves, hydrants, and service. The estimated cost for this project is $632,824.00. Please see the attachments for Addendum #1 dated May 10th, 2023.
05/25/2023 03:00 PM UTC
Annual Paving Program - Contract 2023-A Rebid
The proposed work under this contract consists of asphalt milling and paving, brick paving and associated work items, asphalt and concrete base repairs, concrete roadway repairs, sidewalk replacement and associated work items. The updated estimated cost for this project is $1,023,000.00
04/06/2023 03:00 PM UTC
Painting of Pavement Markings and Striping - Contract 2023-C
The proposed work under this Contract consists of approximately 25 pass miles of pavement striping and various painted pavement markings throughout the City, including downtown striping. The estimated cost for this project is $75,230.00.
03/09/2023 04:00 PM UTC
1 - 10 of 16 Solicitations
← Previous 1