City of Twinsburg, OH
10075 Ravenna Road, Twinsburg, OH 44087
(330) 963-6233
10075 Ravenna Road, Twinsburg, OH 44087
(330) 963-6233
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
RFQ - City of Twinsburg Downtown Streetscape
The City of Twinsburg is seeking letters from qualified consulting firms to assist the city with Downtown Streetscape Design Standards for the SR82 and SR91 corridors between I480/SR91; I480/SR82, Cannon/Ravenna and Richner/SR91 intersections. Streetscape elements would include landscaping plantings, sidewalk improvements, and decorative lighting/street posts to create a sense of place.
Additionally, the consultant will then prepare Phase 1 Improvement Plans for development along the SR82 corridor from Commons Blvd to SR91-Darrow Road using said standards. Scope of work is expected to include development of Design Standards, Conceptual plans and Alternatives study with cost estimates, determine need for easements or right of way, and Phase 1 (SR82) construction plans and specifications.
| 05/07/2025 08:00 PM UTC |
Number | Deadline |
---|---|
SUM/CUY - Ravenna/Shepard/Broadway/Richmond Intersection (PID 113165)
DBE GOAL 8%:
The work included in this project generally includes pavement widening for turn lanes, signal pole, storm improvements, waterline lowering, asphalt grinding involving re-profiling to obtaining minimum cross slope, resurfacing, asphalt base repairs, driveways and sidewalk, existing castings being adjusted or replaced and new pavement markings and signage at this intersection.
| 04/03/2025 02:00 PM UTC |
2025 Roadway Striping Project
This project consists of re-painting existing traffic lane lines, stop bars, cross walks, lane arrows, and other pavement markings throughout the City, with certain restrictions as denoted herein. The roadway restriping project will begin June 9th and be completed by July 28th. The City has the right to award this project to the lowest, competent and most responsible bidder.
| 02/13/2025 02:00 PM UTC |
2025 Road Improvements Program
The work for this project generally includes asphalt resurfacing, asphalt repairs, concrete curb removal & replacement, asphalt grinding, on minor/major asphalt repairs, curb and sidewalk repairs, catch basin repairs, concrete removal and replacement, and miscellaneous other repairs.
| 01/30/2025 03:00 PM UTC |
2025-2026 Wastewater and Parks & Recreation Chemical Bid
The following chemicals are included in this bid: Sodium Hypochlorite (multiple locations), Sodium Bisulfite, Aluminum Sulfate, Chlorine, Caustic Soda and Calcium Nitrate.
| 11/01/2024 01:00 PM UTC |
2025 Refuse and Recycling Collection and Disposal
Five year refuse and recycle collection and disposal for residential and municipal properties within the City of Twinsburg, Ohio.
| 08/29/2024 01:00 PM UTC |
2024 Fitness Center Dehumidification Units and Roof Replacement
The work included in this project generally consists of replacing the existing dehumidification units and built-up roof system (approximately 13,000 square feet).
The new roof is anticipated to be a single ply membrane roof assembly installed on the existing metal deck. The upper exterior wall assemblies shall be modified as required for the new roof, new roof drains provided, and heat tape installed at existing downspouts and gutters. Portions of the existing deck may need to be repaired after the existing built-up roof is removed; an allowance is included in the bid documents and the actual quantity and cost will be adjusted by change order.
New dehumidification units with separate condensing section installed on new curbs. New controls. Upgrades to the Natatorium HVAC system including new supply and return air ducts. New pumps for the pool water heat recovery system. The scope includes interior selective demolition of walls and ceilings, replacement of ceiling tiles as shown on the drawings, and miscellaneous interior finishes.
An optional pre-bid meeting will be held at the Fitness Center on Tuesday August 6th at 8:00 AM. The address for the Twinsburg Fitness Center is 10084 Ravenna Road, Twinsburg OH 44087.
| 08/15/2024 06:00 PM UTC |
Tinkers Creek Interceptor Sewer
The work for this project generally includes installation of approximately 1850 linear feet of 15” sanitary sewer parallel to an existing 15” sewer. After construction the two sewers will have connection at the manholes to allow the sewage to equalize and reduce the hydraulic grade line peak flows in the system. The project includes 4 new manholes, one dog house manhole, and one coring into existing manhole. Restoration of impacted turf, asphalt and storm sewers impacted during construction is required. Contractor shall visit the site to view existing conditions and base their bid accordingly. This project involves Wheeling and Lake Erie right of way at Glenwood Drive and impacts within these limits should be minimized.
| 08/14/2024 01:00 PM UTC |
2024 HVAC City-Wide Building Maintenance
Maintenance of HVAC equipment at all City owned buildings.
HVAC Preventative Maintenance includes:
1. HVAC Preventative Maintenance
2. Coil Cleaning
3. Filter Changes per schedule
4. Drive Belt Changes once per year
5. HVAC Equipment Test and Calibration
6. Yearly System/Component Review
7. Yearly System/Component Review Report
During the month of July each year the Contractor shall provide a report to the City showing all equipment replacements necessary in the following year, within 3 years, and within 5 years. This report shall include:
-Equipment Description
-Equipment Location
-Cost Estimate of Replacement
Duration of the Contract will be for three (3) years commencing on or about July 1, 2024 through June 30, 2027.
All HVAC equipment, appurtenant devices and systems that are related to the HVAC systems are the equipment to be maintained. The equipment not to be maintained under this contract are such items as foundations, structural supports, domestic water non-maintainable lines, drain plumbing, gas refrigerant lines, unit cabinets, cooling tower structure, etc.
| 04/17/2024 01:00 PM UTC |
Glen Chamberlin Restroom (Rebid)
Work on this project will commence on or before May 6, 2024 and be completed by July 3, 2024. The work included in this project includes all materials, equipment and manpower to complete the restroom facility described in this contract and indicated on plans prepared by Mayer Architectural Group, Inc. This contract is partially funded by ODNR grant C725E2.
| 04/11/2024 02:00 PM UTC |
2024 East Idlewood Pedestrian Bridge Replacment
This project includes the demolition and replacement of the existing single span steel truss trail bridge with a new, single span steel truss pedestrian bridge on concrete abutments, raising the bridge by 4.5’, ADA compliant sidewalk and ADA ramps and landings. Pre-bid requests for clarification of various contract specifications for this project should be submitted through E-Mail to pjeffers@twinsburg.oh.us no later than four business days prior to the bid opening to be reviewed and responded to.
| 03/07/2024 02:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.