General Info

Business Logo

Solicitations and notifications are free for this business.

The City of Klamath Falls, OR

500 Klamath Ave, Klamath Falls, OR 97601-6129
(541) 883-5363


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
326124
ORANG REPAIR AIRCRAFT SHELTER B325 Work shall include, but not necessarily be limited to: Installation of a water sprinkler fire suppression system; Repairs & upgrades to building, electrical, HVAC, & lighting systems; Installation of a certified lightning protection system; Installation of an intrusion detection system; Seismic upgrades; Refurbishment of hangar bay doors; Installation of adjacent fire utility building & associated components. Engineer's Estimate: $7,000,000 to $8,500,000 Pre-bid meeting 4/15/25 @ 10 a.m. at Kingsley Field ANG Base, Building 221, Klamath Falls, OR 97603 Due to security conditions, all Pre-Bid Meeting attendees must register to attend the conference and site visit. Interested groups must email agonzalez@klamathfalls.city company name, and telephone number.
05/01/2025 09:00 PM UTC
316522
39 MAIN STREET, BALDWIN PARK Work shall include, but not necessarily be limited to: Temporary Work Zone Traffic Control, Erosion Control, General excavation, Aggregate Base, Concrete Removal, Concrete Curbs, Concrete Sidewalks, Earthwork, Clearing and Grubbing, Electrical Conduit, Reinforced Concrete, Illumination, Seeding, Planting, Site Furnishings, and Irrigation Systems. Engineer's Estimate: $160,000 to $180,000 Pre-bid meeting: 4/17/25 at 2:00 p.m., 226 S 5th Street, Klamath Falls, OR
05/01/2025 09:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
309821
Work shall include, but not necessarily be limited to: Construction of approximately 2,400 LF of 12-inch C900 PVC water transmission main within Eberlein Avenue, installation of fire hydrant assemblies, connections to existing water main and water booster station building, cold plane pavement removal and asphaltic concrete paving. 10/13/23 - Should be noted the paint on the stand pipes that are to be demo'd are coated with paint containing lead. Additionally completion dates are clarified as follows: System must be back online by April 15, 2024. The remainder of the work must be completed no later than June 30, 2024. Engineer's Estimate: $900,000 to $1,000,000
10/19/2023 09:00 PM UTC
21 - 21 of 21 Solicitations
1 3 Next →