General Info

Business Logo

Geauga County Engineer's Office

12665 Merritt Rd, Chardon, OH 44024-8000
(440) 279-1800


Upcoming Solicitations

Number Deadline
RS-0123-B-2025
The asphalt resurfacing of section B of Nauvoo Road from Madison Road (SR528) to Hayes Road (TR-0121) in Middlefield Township. This is approximately one and fifty-two-hundredths (1.52) miles.
05/02/2025 04:00 AM UTC
TS-0606-EF-2025
The realignment of the Bainbridge Road intersection at Washington Street including drainage improvements and new signalization.
05/02/2025 02:00 PM UTC
BR-0380-A-00.310-2025
The replacement of structure #0380-00.310, a 24' steel beam superstructure on concrete spread footer abutments, and replacement with a 24' x 8.5' precast concrete box culvert with precast wingwall and aprons.
05/02/2025 02:00 PM UTC
BR-0191-C-03.210-2025
The removal of structure #0191-03.210, a dual cell 19' four-sided timber buried structure and wingwalls, and replacement with a 19' x 6' precast concrete box culvert with precast wingwall blocks and headwalls.
05/02/2025 02:00 PM UTC
RS-RUS-V-2025
The asphalt resurfacing of various roads including Beechwood Drive, Deerbrook Drive, Hunting Hills Drive, and Squire Lane. This is approximately one and eight-hundredths (1.08) miles.
05/09/2025 04:00 AM UTC
RC-CHE-V-2025
The Reconstruction of Pinewood Trail and Woodlands Trail in Chester Township. The project locations are generally shown on the Location Map. The work shall include improvement of approximately 1.0 mile of roadway. All work for this project shall be completed within the construction limits.
05/09/2025 02:00 PM UTC
RC-AUB-V-2025
This project shall include the reconstruction of Regal Place, Moreland Lane, Cooper Court, and Jensen Court. The work shall include improvement of approximately 1.02 miles of roadway.
05/09/2025 02:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
RS-0311-HI-2025
The asphalt resurfacing of sections HI of Bundysburg Road from the Middlefield Township Line and continues North for approximately one and seventeen-hundredths (1.17) miles.
04/25/2025 02:00 PM UTC
RS-HAM-V-2025
The project includes the asphalt resurfacing of Sission Road, and the first 850' of Sawmill Drive. The work shall include improvement of approximately 1.78 miles of roadway.
04/11/2025 02:00 PM UTC
RS-NEW-V-2025
The Asphalt Resurfacing of Stone Road, Shadowood Drive, and Cory Lane. The project locations are generally shown on the Location Map. The work shall include improvement of approximately 1.2 miles of roadway. All work for this project shall be completed within the construction limits.
04/11/2025 02:00 PM UTC
RS-BUR-V-2025
The asphalt resurfacing of Osmond Road and Forest Road in Burton Township. The work shall include improvement of approximately 0.87 miles of roadway.
04/04/2025 02:00 PM UTC
RS-0972-A-2025
The asphalt resurfacing of section A of Tewksbury Lane from Aquilla Road to the cul-de-sac. The work shall include improvement of approximately 0.53 miles of roadway.
04/04/2025 02:00 PM UTC
RC-0021-AC-2025
The Reconstruction of a Portion of Sections A-B of Butternut Road (CH-0021), Including the Replacement of Structure #0021-00.320, a 39' Prestressed Concrete Box Beam Structure on Stone Abutments with a Two Cell 18' x 8.5' Four Sided Precast Concrete Box Structure with Precast Apron and Wingwall Sections. This Project also Includes the Resurfacing of Butternut Road, Sections A-C, from Mayfield Road (US 322) to Auburn Road (CH-0004).
04/04/2025 02:00 PM UTC
RC-BAI-V-2025
The Reconstruction of Plum Creek Trail and Southbrook Trail, 0.5 miles of roadway improvement including cement stabilized subgrade, full depth asphalt resurfacing, curb and underdrain replacement, driveway aprons, and drainage improvements.
03/28/2025 02:15 PM UTC
CU-GEA-V-2025
The project shall include the replacement of eight (8) culverts on Wilson Mills Road and the connecting side roads, including Stonegate Drive, Riverwood Drive, Basswood Road, Woodiebrook Road, and Winchester Drive in Munson township. Ranging from fifteen inches (15") to eighteen inches (18") in diameter, with ditch pipe and end structure installation.
03/14/2025 02:00 PM UTC
RS-0004-RU-2024
The project shall include the asphalt resurfacing of Auburn Road from Chardon Road, US 6, to Colburn Road. The work shall include improvement of approximately 4.17 miles of roadway.
12/20/2024 03:00 PM UTC
BG-GEA-V-2024
The construction of a salt storage building with a capacity of 6,600 tons of salt on an approximate footprint of 112' x 96' with concrete foundations.
11/01/2024 02:00 PM UTC
1 - 10 of 32 Solicitations
← Previous 1 3 4