Upcoming Solicitations

Number Deadline
RS-0123-B-2025
The asphalt resurfacing of section B of Nauvoo Road from Madison Road (SR528) to Hayes Road (TR-0121) in Middlefield Township. This is approximately one and fifty-two-hundredths (1.52) miles.
05/02/2025 04:00 AM UTC
TS-0606-EF-2025
The realignment of the Bainbridge Road intersection at Washington Street including drainage improvements and new signalization.
05/02/2025 02:00 PM UTC
BR-0380-A-00.310-2025
The replacement of structure #0380-00.310, a 24' steel beam superstructure on concrete spread footer abutments, and replacement with a 24' x 8.5' precast concrete box culvert with precast wingwall and aprons.
05/02/2025 02:00 PM UTC
BR-0191-C-03.210-2025
The removal of structure #0191-03.210, a dual cell 19' four-sided timber buried structure and wingwalls, and replacement with a 19' x 6' precast concrete box culvert with precast wingwall blocks and headwalls.
05/02/2025 02:00 PM UTC
RS-RUS-V-2025
The asphalt resurfacing of various roads including Beechwood Drive, Deerbrook Drive, Hunting Hills Drive, and Squire Lane. This is approximately one and eight-hundredths (1.08) miles.
05/09/2025 04:00 AM UTC
RC-CHE-V-2025
The Reconstruction of Pinewood Trail and Woodlands Trail in Chester Township. The project locations are generally shown on the Location Map. The work shall include improvement of approximately 1.0 mile of roadway. All work for this project shall be completed within the construction limits.
05/09/2025 02:00 PM UTC
RC-AUB-V-2025
This project shall include the reconstruction of Regal Place, Moreland Lane, Cooper Court, and Jensen Court. The work shall include improvement of approximately 1.02 miles of roadway.
05/09/2025 02:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
ES-GEA-V-2024
The Embankment Stabilization of the Gem Road Bridge & Bundysburg Road Bridge. The project shall include the installation of limestone armor stone along the embankment of both the Gem Road Bridge(TR-0264), Structure #0264-00.290 in Chester Township and the Bundysburg Road Bridge (CH-0038), Structure #0038-03.080 in Parkman Township. All work for this project shall be completed within the construction limits.
04/26/2024 02:00 PM UTC
RC-HUN-V-2024
The Reconstruction of Various Roads including Zrolka Drive and Alexander Court. The project locations are generally shown on the Location Map. The work shall include improvement of approximately 0.75 miles of roadway. All work for this project shall be completed within the construction limits.
04/26/2024 02:00 PM UTC
RW-0144-AB-2024
The Road Widening of Dines Road from County Line Road to SR 306. The project locations are generally shown on the Location Map. The work shall include improvement of approximately 2.2 miles of roadway. All work for this project shall be completed within the construction limits.
04/26/2024 02:00 PM UTC
BR-0027-B-02.660-2024
The replacement of the Thwing Road Bridge including the removal of structure #0027-02.660, a 25 ft prestressed concrete box beam structure on concrete abutments, and replacement with a 19 ft X 6 ft precast concrete box culvert with precast wingwall blocks and headwalls.
04/19/2024 02:00 PM UTC
RS-BAI-V-2024
The Asphalt Resurfacing of Treetower Drive, Trillium Drive, Traymore Drive, Wren Road, Timber Trail, Ridgeview Drive, Rambling Creek Trail, and Deepview Drive. The project locations are generally shown on the Location Map. The work shall include improvement of approximately 2.12 miles of roadway. All work for this project shall be completed within the construction limits.
04/12/2024 02:00 PM UTC
RS-CHE-V-2024
The Asphalt Resurfacing of Old Mill Road and County Line Road from the Russell Township Line to the Lake County Line. The project locations are generally shown on the Location Map. The work shall include improvement of approximately 5.06 miles of roadway. All work for this project shall be completed within the construction limits.
04/12/2024 02:00 PM UTC
RS-0016-FG-2024
The Asphalt Resurfacing of Fairmount Road from Sperry Road to Auburn Road. The project locations are generally shown on the Location Map. The work shall include improvement of approximately 2.63 miles of roadway. All work for this project shall be completed within the construction limits.
04/05/2024 02:00 PM UTC
RS-HAM-V-2024
The Asphalt Resurfacing of Crimson King Trail, Walking Stick Lane, and Knotty Pine Lane. The project locations are generally shown on the Location Map. The work shall include improvement of approximately 1.22 miles of roadway. All work for this project shall be completed within the construction limits.
03/29/2024 02:00 PM UTC
RS-AUB-V-2024
The Asphalt Resurfacing of Bartholomew Road, Quinn Road, Edward Lane, and Edinboro Lane. The project locations are generally shown on the Location Map. The work shall include improvement of approximately 2.54 miles of roadway. All work for this project shall be completed within the construction limits.
03/22/2024 02:00 PM UTC
RS-0008-DF-2024
The Asphalt Resurfacing of Wilson Mills Road from SR 306 to Heath Road at the Munson Township Line. The project locations are generally shown on the Location Map. The work shall include improvement of approximately 2.28 miles of roadway. All work for this project shall be completed within the construction limits.
03/22/2024 02:00 PM UTC
21 - 30 of 32 Solicitations