Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9651PlanHolders04242025.pdf (103 KB)
Contract 9651 - Madison Public Market - Exterior Signage
2 Documents

Upcoming Solicitations

Number Deadline
8792 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2025
This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work.
05/08/2025 07:00 PM UTC
9651 - Madison Public Market - Exterior Signage
This contract is for the fabrication, delivery, and installation of exterior signage for the future Madison Public Market located at 202 N First St., Madison, WI 53704. The work includes, but is not limited to, electrical hookup and testing of signage elements, with electrical rough-in already provided near each sign location. This contract includes a potential for (1) Additive Alternate labeled as ITEM 90001.
05/22/2025 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
9357 - IT Fiber Install - 2023 N. Charter to W. Washington Connection
Install new fiber optic through the combination of new and existing conduit between the existing splice points at the intersection of North Charter Street & Spring Street and an existing splice point outside 625 West Washington Ave. The project is approximately 3,500 feet in length.
09/07/2023 07:00 PM UTC
9322 - Fire Station 2 Lighting Retrofit
Replacement of all lighting fixtures and controls at Fire Station 2, located at 421 Grand Canyon Dr. in Madison, WI.
08/24/2023 07:00 PM UTC
9346 - 2023 Parking Garage Maintenance
Work covers repairs at seven City of Madison Parking Garages. Work includes, but is not limited to, concrete repair of slabs, columns, beams and stairs, joint repairs. See contract specifications for scope of work.
08/10/2023 07:00 PM UTC
9335 - CIPP UV Lining Rehabilitation of Sanitary Sewers Phase 2 - 2023
Work shall include the trenchless rehabilitation of approximately 15,649 linear feet of sanitary sewer pipelines ranging in size from 8” to 12” and approximately 345 linear feet of 24”storm sewer pipelines diameter using an Ultraviolet light cure CIPP system.
08/10/2023 07:00 PM UTC
8587 - Tenney Park Beach Shelter
8587 - Tenney Park Beach Shelter
07/13/2023 07:00 PM UTC
8876 - Wexford Pond Dredging
This project is located on the parcel at 1005 N. High Point Rd., Madison, WI.
07/13/2023 07:00 PM UTC
8659 - Hudson Ave., Miller Ave., Willard Ave., Center Ave., and Sommers Ave. Assessment District - 2023
Work shall include, but is not limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, and replacement of storm sewer main and storm sewer structures, excavation, base preparation. curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
07/13/2023 07:00 PM UTC
9333 - Robin Greenway Storm and Grading
9333 - Robin Greenway Storm and Grading
07/13/2023 07:00 PM UTC
9297 - Goodman Library Lighting Upgrade
Complete installation of all building components; the accepted testing, and commissioning of all systems; and the completion, and turn-in of all deliverables as outlined in the plans and specifications.
07/06/2023 07:00 PM UTC
9326 - Door Creek Park Shelter
Door Creek Park Shelter
06/22/2023 07:00 PM UTC