| 8733PlanHolders12152025.pdf (91.1 KB) |
Contract 8733 - Hawthorne, Lake, W Dayton
| |
| Number | Deadline |
|---|---|
|
8733 - Hawthorne Court Reconstruction Assessment District - 2023, Lake Street Sanitary Sewer Replacement Assessment District - 2025, West Dayton Street Sanitary Replacement Assessment District - 2025
This contract will include reconstruction of Hawthorne Ct between University Ave and State St. This contract will also include replacement and upsizing of the sanitary sewer along W. Dayton St (between N. Lake St & N. Frances St) and N. Lake St (between a tie-in point 370’ north of University Ave & State St).
| 12/18/2025 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
9666 - Breese Stevens Field - Athletic Field Replacement
The Work includes the replacement of the synthetic turf and infill at Breese Stevens Field, 917 E. Mifflin Street, Madison, WI 53703.
| 11/20/2025 08:00 PM UTC |
|
9691 - 2026 Playgrounds - Set 1
This project consists of installation of new playground equipment and/or nature play features, benches, playground safety surfacing, underdrain, asphalt paths and associated sitework at four (4) City of Madison park locations including Kennedy Park, Ontario Park, Sandburg Park, and Skyview Park.
| 11/20/2025 08:00 PM UTC |
|
8841 - 114 E Wilson Site Restoration
This project includes site restoration of the City of Madison-owned gravel lot at 114 E. Wilson St. The site was formerly part of the Government East Parking Ramp, and since the ramp was demolished, the site has been used for construction staging by various local Contractors working in the area. The last Contractor to occupy the space is anticipated to be offsite in November 2025.
| 11/20/2025 08:00 PM UTC |
|
9697 - Monona Terrace Tunnel Lighting
This work generally consists of the replacement and upgrades to the existing lighting and electrical systems under the Monona Terrace parking structure.
| 10/30/2025 07:00 PM UTC |
|
9681-Dairy Drive Campground Demo and Site Restoration
This contract is for the demolition of structures, site features and asphalt and/or concrete paving located
3202 Dairy Dr.
| 09/25/2025 07:00 PM UTC |
|
9674 - 346 E. Lakeside Demolition
This project includes the demolition of the house at 346 E. Lakeside Street and the restoration of the site to turf and a gravel path. The house is located on Lake Monona between another residential property and existing park property. Major features to be removed include: the house, garage, deck, fence lines, concrete path, asphalt drive, and existing vegetation.
| 09/18/2025 07:00 PM UTC |
|
9687 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 09/18/2025 07:00 PM UTC |
|
9679 - Olin Park Pedestrian Bridge Replacement
This project consists of the replacement of a pedestrian bridge at Olin Park in Madison, WI including but not limited to the following:
• Removal of existing bridge
• Bridge fabrication, delivery and installation of new bridge on existing abutments
| 09/18/2025 07:00 PM UTC |
|
8801 - Troy Drive Green Avenue Sanitary Sewer with Resurfacing Knutson Drive and Green Avenue Assessment District - 2024
The work under this contract shall include, but is not limited to, installation sanitary sewer main and laterals, adjustment of water valves, and storm inlets, pulverize and shape the existing asphalt pavement, full width grinding of the existing pavement, bus pad installation, and spot replacement of curb and gutter and sidewalks, and new pavement marking.
| 09/18/2025 07:00 PM UTC |
|
9659 - Engineering Operations Facility (EOF) Locker Room Renovation
This contract is for improvements to the Engineering Services Building (ESB) Locker Room located at 1600 Emil Street, Madison, WI. The work includes, but is not limited to, removal and replacement of mechanical, electrical, and plumbing systems, removal and construction of interior walls, removal and replacement of slabs on grade, and interior renovations to create 12 individual use restrooms (4 of these rooms also have showers), and a general locker room area within the footprint of the existing building.
| 09/04/2025 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.