The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 29-1-2026
SOUTH 16TH STREET BRIDGE OVER KINNICKINNIC RIVER REPAIRS.
02/24/2026 04:30 PM UTC
OFFICIAL NOTICE 30-1-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 4. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: NORTH AVENUE, NORTH 20TH ST, CAPITOL DRIVE, AND NORTH 13TH ST.
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 30-2-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 10. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: INTERSTATE 94 AND SOUTH CITY LIMIT
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 2-1-2026
PROJECT NO. 1: SANITARY, STORM, AND COMBINED SEWER MAIN RELAY N. 6th St. – 250’ ± S. of W. Vienna Ave. to W. Vienna Ave. N. 23rd St. – 140’ N. of W. McKinley Ave. to 240’ N. of W. McKinley Ave. N. 39th St. – W. Fairmount Ave. to W. Lancaster Ave. N. 53rd St. – W. Center St. to W. Hadley St. W. McKinley Ave. – N. 23rd St. to N. 24th St.
02/26/2026 04:30 PM UTC
OFFICIAL NOTICE 26-1-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 26-2-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 33-6-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 6: North Forestry District: Area approximately bounded by W Hampton Av. to North City limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-5-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 5: North Forestry District: Area approximately bounded by W Center St. to W Hampton Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-4-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 4: Central Forestry District: Area approximately bounded by W Congress St. to W Center St. & N Sherman Blvd. to Lake Michigan
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-3-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Central Forestry District: Area approximately bounded by W Center St. to W I-94
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-2-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: South Forestry District: Area approximately bounded by W I-94 to W Oklahoma Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-1-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: South Forestry District: Area approximately bounded by W Oklahoma Av. to South City Limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 25-3-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Area 3 - West City limits to east city limits, and approximately Villard Ave south to Capitol Dr.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-2-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Area 2 - Approximately west City Limits to the east City limits, and Mill Rd south to Villard Ave.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-1-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 1: Approximately west City Limits to the east City limits, and County Line Rd south to Mill Rd.
03/06/2026 04:30 PM UTC
15 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 35-1-2015
WATER MAIN RELAYS, located at the following locations : N. Strathmore Ave. (WT410150663), W. Herbert Ave. to W. Sheridan Ave. (26 Working Days); W. Herbert Ave. (WT410150664), N. Strathmore Ave. to W. Tallmadge Pl. (29 Working Days); W. Kathryn Ave. (WT410150665), N. Strathmore Ave. to N. 72nd St. (23 Working Days).
02/20/2015 04:30 PM UTC
OFFICIAL NOTICE 22-1-2015
NORTHWEST GARAGE - COMPRESSED NATURAL GAS FUELING PROGRAM 3025 W. RUBY AVENUE MILWAUKEE, WI
02/19/2015 04:30 PM UTC
OFFICIAL NOTICE 28-1-2015
WATER MAIN RELAYS, located at the following locations: Water Main Relays - N. 105th St.(WT410150677), W. Stark St. to W. Lancaster Av. (38 Working Days); W. Cameron Av.(WT410150678), N. 103rd St. to N. 105th St. (34 Working Days); W. Lancaster Av.(WT410150679), N. 103rd St. to N. 105th St. (17 Working Days); W. Fairmount Av.(WT410150680), N. 104th St. to N. 105th St. (5 Working Days); N. 104th St.(WT410150681), W. Harvest Ln. to W. Fairmount Av. (5 Working Days); W. Harvest Ln.(WT410150682), N. 104th St. to N. 105th St. (14 Working Days)
02/18/2015 04:30 PM UTC
OFFICIAL NOTICE 9-1-2015
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at (ST216150108) - S. Muskego Ave. - W. Becher St. to S. Cesar E. Chavez Dr.; S. 13th St. - W. Oklahoma Ave. to W. Montana St.; S. Kinnickinnic Ave. - W. Oklahoma Ave. to I-794 PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at (ST216151108) - S. Muskego Ave. - W. Becher St. to S. Cesar E. Chavez Dr.; S. 13th St. - W. Oklahoma Ave. to W. Montana St.; S. Kinnickinnic Ave. - W. Oklahoma Ave. to I-794 Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 29, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/12/2015 04:30 PM UTC
OFFICIAL NOTICE 7-1-2015
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at (ST216150106) - N. Holton St. - E. North Ave. to E. Locust St.; S. 6th St. - W. Greenfield Ave. to W. Virginia St.; S. 2nd St. - W. Maple St. to W. Scott St. PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at (ST216151106) - N. Holton St. - E. North Ave. to E. Locust St.; S. 6th St. - W. Greenfield Ave. to W. Virginia St.; S. 2nd St. - W. Maple St. to W. Scott St. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 7, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/11/2015 04:30 PM UTC
OFFICIAL NOTICE 8-1-2015
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at (ST216150107) - W. Morgan Ave. - S. 9th St. to S. 20th St.; W. Morgan Ave. - Pt. E. of W. Lakefield Dr. to S. 35th St.; W. Morgan Ave. - S. 35th St. to S. 43rd St.; S. 20th St. - W. College Ave. to W. Ramsey Ave. PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at (ST216151107) - W. Morgan Ave. - S. 9th St. to S. 20th St.; W. Morgan Ave. - Pt. E. of W. Lakefield Dr. to S. 35th St.; W. Morgan Ave. - S. 35th St. to S. 43rd St.; S. 20th St. - W. College Ave. to W. Ramsey Ave. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 29, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/11/2015 04:30 PM UTC
OFFICIAL NOTICE 6-1-2015
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at (ST216150105) W. Roosevelt Dr. - N. Fond du Lac Ave. to N. 51st St.; W. Roosevelt Dr. - N. 51st St. to N. 60th St.; W. North Ave. - W. Lisbon Ave. to West City Limits PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at (ST216151105) W. Roosevelt Dr. - N. Fond du Lac Ave. to N. 51st St.; W. Roosevelt Dr. - N. 51st St. to N. 60th St.; W. North Ave. - W. Lisbon Ave. to West City Limits The contractor has the option of submitting two (2) proposals for the paving on all the locations listed. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/10/2015 04:30 PM UTC
OFFICIAL NOTICE 5-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150104) Asphalt Overlays: N. Van Buren St. - E. Kilbourn Ave. to E. Brady St.; E/W Pleasant St. - N. Palmer St. to N. Dr. Martin Luther King Jr. Dr.; E. Newberry Blvd. - N. Lake Dr. to N. Downer Ave.; E. Newberry Blvd. - N. Downer Ave. to N. Oakland Ave. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 14, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/09/2015 04:30 PM UTC
OFFICIAL NOTICE 4-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150103) Asphalt Overlays: W. Locust St. - N. Fond du Lac Ave. to N. 35th St.; W. Center St. - N. 12th St. to N. 20th St.; W. Center St. - N. 35th St. to N. Sherman Blvd.; N. 27th St. - W. Townsend St. to W. Capitol Dr. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 14, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/06/2015 04:30 PM UTC
OFFICIAL NOTICE 2-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150101) Asphalt Overlays: W. Villard Ave. – N. 51st St. to N. 60th St.; W. Villard Ave. - N. 60th St. to N. 68th St.; W. Florist Ave. – N. Teutonia to N. Sherman Blvd. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 14, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/05/2015 04:30 PM UTC