General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 96-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
09/17/2025 03:30 PM UTC
OFFICIAL NOTICE 89-1-2025
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE INSTALLATION, REPAIR OF EXISTING SPEED HUMPS, REPAINTING AND REFURBISHING OF EXSITING PAVEMENT MARKINGS, ETC.; Construction of Asphalt Speed Humps at these locations: ST211250103 2025 Existing Speed Hump Maintenance TBD ST211250155 Cherokee Point Neighborhood (4 Speed Humps) ST211250148 E. Potter Ave. - A pt. 375' e/o E. Russell Ave. to E. Russell Ave. (1 Speed Hump) ST211250149 E. Russell Ave. - S. Quincy Ave. to S. Adams Ave. (1 Speed Hump) ST211250126 E. Van Beck Ave. - S. Whitnall Ave. to S. Howell Ave. (2 Speed Humps) ST211250129 N. 33rd St. - W. Meinecke Ave. to W. Wright St. (1 Speed Hump) ST211250144 N. 39th St. - W. Glendale Ave. to W. Courtland Ave. (1 Speed Hump) ST211250118 N. 41st St. - W. Congress St. to W. Ruby Ave. (1 Speed Hump) ST211250119 N. 45th St. - W. Center St. to W. Hadley St. (1 Speed Hump) ST211250146 N. 51st St. - W. Washington Blvd. to W. Vine St. (1 Speed Hump) ST211250120 N. 58th St. - W. Hadley St. to W. Locust St. (1 Speed Hump) ST211250109 N. 61st St. - W. Melvina St. to W. Capitol Dr. (1 Speed Hump) ST211250140 N. 62nd St. - W. Congress St. to W. Medford Ave. (1 Speed Hump) ST211250141 N. 66th St. - W. Stark St. to W. Lancaster Ave. (2 Speed Humps) ST211250110 N. 70th St. - W. Marion St. to W. Congress St. (1 Speed Hump) ST211250116 N. 88th St. - W. Concordia Ave. to W. Townsend St. (1 Speed Hump) ST211250114 N. Arlington Pl. - E. Hamilton St. to E. Kane Pl. (1 Speed Hump) ST211250111 N. Hackett Ave. - E. Park Pl. to E. Newberry Blvd. (1 Speed Hump) ST211250142 N. Jackson St. - E. Pleasant St. to N. Water St. (2 Speed Humps) ST211250112 N. Prospect Ave. - E. Park Pl. to E. Newberry Blvd. (1 Speed Hump) ST211170121 N. Stowell Ave. - E. Newberry Blvd. to E. Locust St. (1 Speed Hump) ST211250113 N. Warren Ave. - E. Hamilton St. to E. Boylston St. (2 Speed Humps) ST211250132 S. 10th St. - W. Lapham Blvd. to W. Orchard St. (1 Speed Hump) ST211250125 S. 12th St. - W. Lapham Blvd. to W. Greenfield Ave. (2 Speed Humps) ST211250147 S. 23rd St. - W. Parnell Ave. to W. Denis Ave. (2 Speed Humps) ST211250123 S. 37th St. - W. Morgan Ave. to W. Ohio Ave. (3 Speed Humps) ST211250128 S. 9th Pl. - W. Euclid Ave. to W. Oklahoma Ave. (1 Speed Hump) ST211250130 W. Clarke St. - N. 19th St. to N. 20th St. (1 Speed Hump) ST211250122 W. Holt Ave. - S. 91st St. to S. 92nd St. (1 Speed Hump) ST211250117 W. Hope Ave. - N. 81st St. to N. 84th St. (3 Speed Humps) ST211250139 W. Lawn Ave. - N. 87th St. to N. 90th St. (1 Speed Hump) ST211220144 W. Thurston Ave. - N. 89th St. to N. 91st St. (2 Speed Humps) ST211250145 N. 73rd St. - W. Brentwood Ave. To N. Yuba St. (3 Speed Humps)
09/25/2025 03:30 PM UTC
OFFICIAL NOTICE 86-1-2025
PROJECT 1: SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & STORM AND COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING. N. 24th Pl.- W. Melvina St. to W. Capitol Dr. N. 38th St – W. Michigan St. to 300' +/- N of W. Michigan St. W. Capitol Dr. –N. 25th St. to N. 26th St. W. Everett St.– 175' +/- W. of N. Vel R. Phillips Ave. to N. Vel R. Phillips Ave. W. Lisbon Ave.– N. 46th St. to N. 52nd St. N. Pierce St.– 300' +/- S. of E. Wright St. to E. Wright St.
09/26/2025 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 24-1-2014
WATER HYDRANT ALTERATIONS – S. WATER ST., E. WASHINGTON ST. TO E NATIONAL AV.; S. HOWELL AV., W. GRANGE AV. TO W. COLLEGE AV.; S. 27TH ST. 930FT N/O W. OKLAHOMA AV. TO W. HOWARD AV.; S. 60TH ST., W. ALLERTON AV. TO 1236FT S/O W. LAYTON AV.; N. LOVERS LANE RD. AT W HAMPTON AV.; N. 9TH ST. AT W. STATE ST.
03/04/2014 04:30 PM UTC
OFFICIAL NOTICE 19-1-2014
WATER MAIN RELAYS - W. FERNWOOD CIR., W. HONEY CREEK DR. TO W. HONEY CREEK DR.; S. HONEY CREEK DR., W. RIVER BEND DR. TO W. MORGAN AVE.; W. OHIO AVE., W. RIVER BEND DR. TO S. 76TH ST.; W. LAKEFIELD DR., S. 72ND ST. TO W. OKLAHOMA AVE.; S. 71ST ST., W. LAKEFIELD DR. TO W. BURDICK AVE.; S. 69TH ST., W. EUCLID AVE. TO W. OHIO AVE.
02/28/2014 04:30 PM UTC
OFFICIAL NOTICE 13-1-2014
Rehabilitation of South 1st Street Bridge over the Kinnickinnic River (P-40-829), including but not limited to replacing the concrete deck; sandblasting and painting steel members; replacing expansion bearings at the abutments; concrete repairs to the abutments; encasing existing steel piles; and approach roadway work.
02/27/2014 04:30 PM UTC
OFFICIAL NOTICE 23-1-2014
COMBINED SEWERS MAIN RELAYS AND COMBINED SEWERS LINING AND MANHOLE REPAIR &LINING IN: E. Hartford Ave. from N. Cramer St. to 300’ +/- West of N. Maryland Ave. E. Kenwood Blvd. from N. Maryland Ave. to N. Downer Ave. N. Maryland Ave. from E. Kenwood Blvd. to E. Hartford Ave. N. Stowell Ave. from E. Linwood Ave. to E. Kenwood Blvd.
02/26/2014 04:30 PM UTC
OFFICIAL NOTICE 16-1-2014
CONSTRUCTION OF 8” CONCRETE PAVEMENT, PAVEMENT REMOVAL, TRACK ZONE REMOVAL, CONCRETE CURB AND GUTTER, CONCRETE WALK, STORM SEWERS, SODDING, ETC, located at (ST211130121) – N. 35th St. – W. Cameron Ave. to W. Villard Ave.
02/21/2014 04:30 PM UTC
OFFICIAL NOTICE 22-1-2014
COMBINED, SANITARY AND STORM SEWERS MAIN RELAYS IN: N. 38th St. from W. Burleigh St. to W. Fond Du Lac Ave. N. 45th St. from W. Lloyd St. to W. Lisbon Ave. N. 47th St. from W. Clarke St. to W. Center St. N. 48th St. from W. Washington Blvd to W. Garfield Ave. N. 56th St. from 225’ +/- South of W. Wright St. to W. Lisbon Ave. N. 57th St. from W. North Ave. to W. Clarke St. N. 58th St. from 280’+/- South of W. Wright St. to W. Lisbon Ave.
02/19/2014 04:30 PM UTC
OFFICIAL NOTICE 7-1-2014
CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, PULVERIZING PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211130110) – N. 70th St. – W. Brown Deer Rd. to a point 1800’ +/- south of W. Glenbrook Rd
02/17/2014 04:30 PM UTC
OFFICIAL NOTICE 2-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211120121) – N. 19th St. – W. Capitol Dr. to W. Olive St., (ST21110116) N. 3rd St. – W. Auer Ave. to W. Keefe Ave. (Including replacement of speed humps (4))
02/14/2014 04:30 PM UTC
OFFICIAL NOTICE 3-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211120119) – S. Winona Ln. – W. Forest Home Ave. to W. Burnham St., (ST211130138) S. 14th St. – W. Harrison Ave. to W. Lincoln Ave., (ST211130111) E. Bennett Ave. – S. Kinnickinnic Ave. to S. Ellen St.
02/12/2014 04:30 PM UTC
OFFICIAL NOTICE 156-1-2013
WP-308: LINNWOOD BACKUP POWER GENERATION PROJECT LOCATED AT LINNWOOD PURIFICATION PLANT, 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
02/11/2014 04:30 PM UTC
1391 - 1400 of 1500 Solicitations
1 2 136 137 138 140 142 143 144 149 150