General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 75-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SPEED HUMPS, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST211220262 – In N. 39th St./N. Sercombe Rd. – W. Hope Ave. to W. Marion St.
01/06/2026 04:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 34-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST211140165) Asphalt Overlay by Contract; N. 54th St. – W. Capitol Dr. to W. Fond Du Lac Ave.; N. 53rd St. – W. Capitol Dr. to W. Fond Du Lac Ave.; N. 52nd St. – W. Capitol Dr. to W. Fond Du Lac Ave.; W. Keefe Ave. – N. 20th St. to N. Hopkins St.; N. 68th St. – W. Capitol Dr. to W. Hampton Ave.
05/27/2014 03:30 PM UTC
OFFICIAL NOTICE 64-1-2014
SAFETY ACADEMY DOMESTIC HOT WATER SYSTEM-SYSTEM UPGRADE 6680 NORTH TEUTONIA AVENUE MILWAUKEE, WI
05/27/2014 03:30 PM UTC
OFFICIAL NOTICE 31-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216140103) High Impact Asphalt Overlay #3; N. Holton St. – E. Reservoir to E. North; N. Humboldt Blvd. – E. Meinecke to E. Keefe; E. Brady St. – N. Farwell to N. Water
05/22/2014 03:30 PM UTC
OFFICIAL NOTICE 56-1-2014
2014 GREEN STREET MEDIAN PROJECT - BIORETENTION FACILITY
05/22/2014 03:30 PM UTC
OFFICIAL NOTICE 35-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST211140166) Asphalt Overlay: W. Grange Ave. – S. 6th St. to S. 13th St.; S. 10th St. – W. Carpenter Ave. to W. Layton Ave.; W. Carpenter Ave. – S. 6th St. to S. 10th St.
05/21/2014 03:30 PM UTC
OFFICIAL NOTICE 32-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216140104) S. Kinnickinnic Ave. – I-794 to E. Lincoln Ave.; S. Muskego Ave. – W. Becher St. to W. Forest Home Ave.; S. 2nd St. – W. Mineral St. to W. National Ave.
05/19/2014 03:30 PM UTC
OFFICIAL NOTICE 57-1-2014
WP-318 SOUTH FILTERED WATER RESERVOIR ROOF REPLACEMENT. PROJECT LOCATED AT 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
05/14/2014 03:30 PM UTC
OFFICIAL NOTICE 59-1-2014
2014 Sidewalk - Scattered Sites
05/12/2014 03:30 PM UTC
OFFICIAL NOTICE 44-1-2014
CONSTRUCTION OF CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, STORM SEWER WORK, SODDING, ETC, located at (ST211130115) W. Melvina St. - N. 27th St. to N. 30th St.; (ST211130185) N. Richards St. @ E. Clarke St.
05/02/2014 03:30 PM UTC
OFFICIAL NOTICE 51-1-2014
SANITARY AND STORM SEWER MAINS RELAY & LINING, COMBINED SEWER MAIN LINING, WATER MAIN RELAY AND MANHOLE REPAIR & LINING IN N 3RD ST - W CONCORDIA AVE TO W KEEFE AVE, N 10TH ST - W NASH ST TO W CAPITOL DR, N 12TH ST - W ABERT PL TO W CAPITOL DR, AND N 39TH ST - W FOND DU LAC AVE/W CONCORDIA AVE TO W TOWNSEND AVE
04/30/2014 03:30 PM UTC
1371 - 1380 of 1523 Solicitations
1 2 134 135 136 138 140 141 142 152 153