General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 1-1-2025
Street Lighting LED upgrade CRP AREA B: E/W Juneau Ave. to E/W Oklahoma Ave, Lake Michigan to West City Limit
04/25/2025 03:30 PM UTC
OFFICIAL NOTICE 53-1-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 53-2-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 18-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; ST211220209 – North 30th Street – West Atkinson Avenue to West Hampton Avenue ST211210219 – West Gertrude Drive – West Stark Street to West Grantosa Drive
04/29/2025 03:30 PM UTC
OFFICIAL NOTICE 25-1-2025
SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING N. 34th St. - W. Clybourn St. to 250’ S. of W. Clybourn St. N. 36th St. – W. Michigan St. to W. Wisconsin Ave. N. 59th St. – W. Vine St. to 460’+/- N. of W. Vine St. E. Brown St. – 140’+/- W. of N. Hubbard St. to N. Hubbard St. W. Michigan St. – N. 36th St. to 145’+/- E. of N. 39th St.
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 25-2-2025
2025 SANITARY SEWER MANHOLE INSPECTION
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 6-1-2022
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216220101 – High Impact Project Locations North 56th Street - West Hampton Avenue to West Villard Avenue North 66th Street - West Port Avenue to West Bradley Road North 70th Street - West Congress Street to West Hampton Avenue North 80th Street - West Center Street to West Burleigh Street North 82nd Street - West Center Street to West Burleigh Street North 95th Street - West Silver Spring Drive to West Carmen Avenue North 104th Street - West Grantosa Drive to West Congress Street West Appleton Lane - West Florist Avenue to North 115th Street West Port Avenue - North 60th Street to North 66th Street
02/25/2022 04:30 PM UTC
OFFICIAL NOTICE 5-1-2022
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF RAMPS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, SEWER WORK, APPURTENANCE UNDERGROUND WORK, ETC.; Located at: ST216210112 – ADA RAMPS FOR 2022 HIGH IMPACT PAVING @ VARIOUS LOCATIONS (SOUTH SIDE PROJECTS) The scope of this contract is to remove and replace all of the pedestrian ramps within the limits of each of the City of Milwaukee “High Impact” asphalt paving projects. The “High Impact” asphalt paving projects are as follows: Official Notice No. 8-1-2022 East Juneau Avenue – North Prospect Avenue to North Van Buren Street East Kane Plane – North Summit Street to North Cambridge Avenue East Knapp Street - North Prospect Avenue to North Van Buren Street West Pierce Street - West Reynolds Place to South Layton Boulevard East Royall Place - North Prospect Avenue to North Oakland Avenue West Vliet Street - North 27th Street to North 47th Street Official Notice No. 9-1-2022 South 71st Street - West Burdick Avenue to West Lakefield Drive South Avalon Street - West Granada Street to South 15th Court (including South 15th Court) West Burdick Avenue - South 70th Street to South 71st Street East Carol Street - South Iowa Avenue to South Burst Avenue West Euclid Avenue - South 68th Street to South 70th Street West Granada St. - South 13th Street to South Avalon Street West Green Avenue - West Ramsey Avenue to South Melinda Street West Lakefield Drive - South 70th Street to West Oklahoma Avenue West Lincoln Avenue - South 1st Street to South Chase Avenue East Rhode Island Avenue - South Superior Street to East Fernwood Avenue West Tripoli Avenue - South Massachusetts Avenue to South 75th Street West Upham Court - South 18th Street to A point west of South 18th Street
02/24/2022 04:30 PM UTC
OFFICIAL NOTICE 4-1-2022
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF RAMPS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, SEWER WORK, APPURTENANCE UNDERGROUND WORK, ETC.; Located at: ST216210111 – ADA RAMPS FOR 2022 HIGH IMPACT PAVING @ VARIOUS LOCATIONS (NORTH SIDE PROJECTS) The scope of this contract is to remove and replace all of the pedestrian ramps within the limits of each of the City of Milwaukee “High Impact” asphalt paving projects. The “High Impact” asphalt paving projects are as follows: O.N. # 6-1-2022 North 56th Street - West Hampton Avenue to West Villard Avenue North 66th Street - West Port Avenue to West Bradley Road North 70th Street - West Congress Street to West Hampton Avenue North 80th Street - West Center Street to West Burleigh Street North 82nd Street - West Center Street to West Burleigh Street North 95th Street - West Silver Spring Drive to West Carmen Avenue North 104th Street - West Grantosa Drive to West Congress Street West Appleton Lane - West Florist Avenue to North 115th Street West Port Avenue - North 60th Street to North 66th Street O.N. # 7-1-2022 North 7th Street - North Doctor Martin Luther King Junior Drive to West Capitol Drive North 13th Street - A point south of West Vine Street to West Brown Street North 32nd Street - West Atkinson Avenue to West Cameron Avenue North 47th Street - West Vliet Street to West Lloyd Street North 51st Street - West Lisbon Avenue to West Center Street North Hopkins Street - West Villard Avenue to North Sherman Boulevard West Locust Street - West Appleton Avenue to West Lisbon Avenue West Melvina Street - North 46th Street to West Leon Trail
02/23/2022 04:30 PM UTC
OFFICIAL NOTICE 31-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 2: AREA BOUNDED BY NORTH AVENUE, WEST CITY LIMIT, CAPITOL DRIVE, AND NORTH 27TH STREET.
02/18/2022 04:30 PM UTC
OFFICIAL NOTICE 32-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 4 - AREA BOUNDED BY NORTH AVENUE, NORTH 20TH ST, CAPITOL DRIVE, AND NORTH 13TH ST.
02/18/2022 04:30 PM UTC
OFFICIAL NOTICE 33-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 5 - AREA BOUNDED BY NORTH AVENUE, NORTH 13TH ST, CAPITOL DRIVE, AND INTERSTATE 43
02/18/2022 04:30 PM UTC
OFFICIAL NOTICE 34-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 10 - AREA BOUNDED BY INTERSTATE 94 AND SOUTH CITY LIMIT
02/18/2022 04:30 PM UTC
Official Notice 30-1-2022
100 Lead Service Line Replacements
02/16/2022 04:30 PM UTC
OFFICIAL NOTICE 28-1-2022
WORK ON THIS PROJECT SHALL INCLUDE, BUT NOT LIMITED TO: INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, INSTALLATION OF TEMPORARY STREET LIGHTING WOODEN POLES INSTALLATION OF TEMPORARY LIGHTING UNITS BOTH SINGLE AND DOUBLE, INSTALLATION OF CONDUIT AND CABLE, INSTALLATION OF 9” HIGH EARLY STRENGTH CONCRETE, ELECTRICAL APPURTENANCE REMOVALS, CONCRETE BASE REMOVALS, ETC.; Located at: RE5239118511 – West Good Hope Road – North Range Lind Road to 490’+/- east of North Teutonia Avenue (Rail Road Tracks) (Temporary Street Lighting)
02/14/2022 04:30 PM UTC
OFFICIAL NOTICE 27-1-2022
NEW SANITARY SEWER & SANITARY SEWER RELAY
02/10/2022 04:30 PM UTC
361 - 370 of 1443 Solicitations
1 2 33 34 35 37 39 40 41 144 145