General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 1-1-2025
Street Lighting LED upgrade CRP AREA B: E/W Juneau Ave. to E/W Oklahoma Ave, Lake Michigan to West City Limit
04/25/2025 03:30 PM UTC
OFFICIAL NOTICE 53-1-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 53-2-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 18-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; ST211220209 – North 30th Street – West Atkinson Avenue to West Hampton Avenue ST211210219 – West Gertrude Drive – West Stark Street to West Grantosa Drive
04/29/2025 03:30 PM UTC
OFFICIAL NOTICE 25-1-2025
SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING N. 34th St. - W. Clybourn St. to 250’ S. of W. Clybourn St. N. 36th St. – W. Michigan St. to W. Wisconsin Ave. N. 59th St. – W. Vine St. to 460’+/- N. of W. Vine St. E. Brown St. – 140’+/- W. of N. Hubbard St. to N. Hubbard St. W. Michigan St. – N. 36th St. to 145’+/- E. of N. 39th St.
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 25-2-2025
2025 SANITARY SEWER MANHOLE INSPECTION
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 36-1-2022
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: Central Forestry District: Area approximately bounded by W. Capitol Dr. and W I-94.
03/08/2022 04:30 PM UTC
OFFICIAL NOTICE 36-2-2022
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: South Forestry District: Area approximately bounded by W I-94 and South City Limits
03/08/2022 04:30 PM UTC
OFFICIAL NOTICE 36-3-2022
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: North Forestry District: Area approximately bounded by W Capitol Dr. and W County Line Rd
03/08/2022 04:30 PM UTC
OFFICIAL NOTICE 35-1-2022
CITY-WIDE REMOVAL OF WEEDS AND TALL GRASSES, SIDEWALK SNOW AND ICE, AND RIGHT-OF-WAY ENCROACHMENTS FROM PRIVATE PROPERTY IN VIOLATION OF CITY ORDINANCE 80-17, 116-8, AND 116-55.
03/07/2022 04:30 PM UTC
OFFICIAL NOTICE 9-1-2022
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216220104 – High Impact Project Locations South 71st Street – West Burdick Avenue to West Lakefield Drive South Avalon Street – West Granada Street to South 15th Court (include South 15th Court) West Burdick Avenue – South 70th Street to South 71st Street East Carol Street – South Iowa Avenue to South Brust Avenue East Euclid Avenue – South 68th Street to South 70th Street West Granada Street – South 13th Street to South Avalon Street West Green Avenue – West Ramsey Avenue to South Melinda Street West Lakefield Drive – South 70th Street to West Oklahoma Avenue West Lincoln Avenue – South 1st Street to South Chase Avenue East Rhode Island Avenue – South Superior Street to East Fernwood Avenue West Tripoli Avenue – South Massachusetts Avenue to South 75th Street West Upham Court – South 18th Street to point west of South 18th Street
03/04/2022 04:30 PM UTC
OFFICIAL NOTICE 8-1-2022
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216220103 – High Impact Project Locations East Juneau Avenue – North Prospect Avenue to North Van Buren Avenue East Kane Plane – North Summit Avenue to North Cambridge Avenue East Knapp Street - North Prospect Avenue to North Van Buren Start West Pierce Street - West Reynolds Place to South Layton Boulevard East Royall Place - North Prospect Avenue to North Oakland Avenue West Vliet Street - North 27th Street to North 47th Street
03/03/2022 04:30 PM UTC
OFFICIAL NOTICE 7-1-2022
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216220102 – High Impact Project Locations North 7th Street - North Dr. Martin L King Jr. Drive to West Capitol Drive North 13th Street - A point south of West Vine Street to West Brown Street North 32nd Street - West Atkinson Avenue to West Cameron Avenue North 47th Street - West Vliet Street to West Lloyd Street North 51st Street - West Lisbon Avenue to West Center Street North Hopkins Street - West Villard Avenue. to North Sherman Boulevard West Locust Street - West Appleton Avenue to West Lisbon Avenue West Melvina Street - North 46th Street to West Leon Terrace
03/02/2022 04:30 PM UTC
OFFICIAL NOTICE 29-1-2022
Keenan Health Center ADA Compliance Program 3200 North 36th Street, Milwaukee, WI 53216
03/01/2022 04:30 PM UTC
OFFICIAL NOTICE 15-1-2022
PROJECT NO. 1: COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING & MANHOLE REPAIR AND LINING Located at: N. 16th St. – 535’ +/- S. of W. North Ave. to W. North Ave. N. 17th St. – W. North Ave. to 100’ +/- N. of W. Meinecke Ave. N. 24th Pl. – 230’ +/- S. of W. McKinley Ave. to W. McKinley Ave. N. 24th St. – W. Wells St. to W. Kilbourn Ave. Alley 180’ N. of W. Kilbourn Ave. – N. 26th St. to 180’ +/- W. of N. 26th St. W. Oak St. – (W/L) W. Fond Du Lac Ave. - N. 24th St. /W. Medford Ave.
02/28/2022 04:30 PM UTC
OFFICIAL NOTICE 15-2-2022
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 34th St. – 235’ +/- S. of W. Wells St. to W. Wells St. N. 36th St. – W. Galena St. to 460' +/- N. of W. Galena St. N. 51st St. – 245’ +/- S. of W. Lloyd St. to W. Lloyd St. W. Galena St. – N. 39th St. to N. 40th St.
02/28/2022 04:30 PM UTC
351 - 360 of 1443 Solicitations
1 2 32 33 34 36 38 39 40 144 145