General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 40-1-2023
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 6: AREA BOUNDED BY NORTH AVE., W I-43, CAPITOL DR., AND EAST CITY LIMIT.
02/16/2023 04:30 PM UTC
Official Notice 36-1-2023
200 LEAD SERVICE LINE REPLACEMENTS
02/13/2023 04:30 PM UTC
OFFICIAL NOTICE 28-1-2023
MELVINA PARK RECONSTRUCTION Located at: 3840 North 29th Street Milwaukee, WI 53216
02/10/2023 04:30 PM UTC
OFFICIAL NOTICE 2-1-2023
GROUNDS-KEEPING SERVICES at the following locations: Linnwood Water Treatment Plant (3000 N. Lincoln Memorial Dr.), North Point Pumping Station (2275 N. Lincoln Memorial Dr.), North Point Fountain / Water Tower Park (2417 E. North Ave.), Kilbourn Reservoir Park (626 E. North Ave.) and Riverside Pumping Station (1311 E. Chambers St.)
02/08/2023 04:30 PM UTC
OFFICIAL NOTICE 2-2-2023
GROUNDS-KEEPING SERVICES at the following locations: Florist Pumping Station (8525 W. Florist Ave.), Hawley Road Elevated Storage Tank (1235 N. Hawley Rd.) and Adler Pumping Station (8525 W. Adler St.)
02/08/2023 04:30 PM UTC
OFFICIAL NOTICE 2-3-2023
GROUNDS-KEEPING SERVICES at the following locations: Howard Avenue Water Treatment Plant (3929 S. 6th St.), Texas Pumping Station (2900 E. Texas Ave.), Grange Pumping Station (5353 S. 43rd St., Greenfield), Lincoln Pumping Station (3641 W. Lincoln Ave.) and Greenfield Elevated Storage Tank (8787 W. Waterford Ave., Greenfield)
02/08/2023 04:30 PM UTC
OFFICIAL NOTICE 29-1-2023
2023 SANITARY BYPASS PUMP & SANITARY LIFT STATION INSPECTION AND BYPASS PUMP WET TESTING
02/02/2023 04:30 PM UTC
OFFICIAL NOTICE 10-1-2023
SANITARY AND STORM SEWER MAIN RELAY IN: S. 37th St. – W. Burnham St. to W. Grant St. W. Becher St. – S. 36th St. to S. 37th St.
01/27/2023 04:30 PM UTC
OFFICIAL NOTICE 10-2-2023
COMBINED SEWER MAIN RELAY in: N. 37th St. - W. Highland Blvd. to W. Juneau Ave. N. 38th St. - W. Highland Blvd. to W. Juneau Ave.
01/27/2023 04:30 PM UTC
OFFICIAL NOTICE 126-1-2022
MILWAUKEE SAFETY ACADEMY BLEACHER REPLACEMENT 6680 NORTH TEUTONIA AVENUE MILWAUKEE, WISCONSIN 53209
01/26/2023 04:30 PM UTC
351 - 360 of 1553 Solicitations