General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 75-1-2024
The general work requested is: CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS AND CRACKS, GRAVEL FILLING, CRUSH GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, TOPSOILING AND SODDING, ETC.; Located at: ST211230105 – In North 23rd Street Humboldt from West Ruby Avenue to West Cornell Street
09/26/2024 03:30 PM UTC
OFFICIAL NOTICE 89-1-2024
SANITARY AND STORM SEWER MAIN RELAY & SANITARY AND STORM SEWER MAIN LINING S. 24th St. - W. Euclid Ave. to W. Ohio Ave. S. 26th St. - W. Oklahoma Ave. to W. Ohio Ave. S. 28th St. - W. Oklahoma Ave. to W. Euclid Ave. S. 29th St. - W. Oklahoma Ave. to 120' South of W. Euclid Ave. W. Euclid Ave. - S. 27th St. to S. 31st St.
09/27/2024 03:30 PM UTC
OFFICIAL NOTICE 98-1-2024
2nd and Plankinton Parking Structure Renovation 2nd and Plankinton parking structure renovation - at east passenger elevator install new water diversion, Alt 1 (expand office, renovate bathroom and demo existing lobby and build new lobby).
10/01/2024 03:30 PM UTC
OFFICIAL NOTICE 106-1-2024
Milwaukee Police Department – Police Administration Building Service, ATS, & Paralleling Gear Upgrades
10/09/2024 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 114-1-2018
WATER MAIN RELAYS at the following locations: N. 84th St. (E/S) (WT410180605), W. Hope Av. to W. Marion St. (19 working days); N. 77th St./ W. Potomac Av. (WT410180667), W. Fiebrantz Av. to N. 80th St. (57 working days); W. Hope Av. (WT410180672), N. 60th St. to N. 61st St. (14 working days); N. 61st St. (WT410180673), W. Fiebrantz Av. to W. Congress St. (59 working days); N. 74th St. (WT410180690), W. Marion St. to W. Congress St. (18 working days); W. Marion St. (WT410180691), N. 73rd St. to N. 74th St. (8 working days). (Note: Contractor to furnish and install approximately 6,143 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/08/2018 03:30 PM UTC
OFFICIAL NOTICE 67-1-2018
WP-324: NE & NW COAGULATION BASIN FLOCCULATOR UPGRADES LOCATED AT LINNWOOD WATER TREATMENT PLANT, 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
08/03/2018 03:30 PM UTC
OFFICIAL NOTICE 79-1-2018
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST21100102 - S. 3rd St. - W. Maple St. to W. Lapham Blvd.
08/02/2018 03:30 PM UTC
OFFICIAL NOTICE 115-1-2018
78 LEAD SERVICE LINE REPLACEMENTS at childcare facilities within the City of Milwaukee.
08/02/2018 03:30 PM UTC
OFFICIAL NOTICE 93-1-2018
GREEN STREET BIOSWALES IN: West Good Hope Road from 595’ +/- West of North 51st Street to 50’ +/- East of North 90th Boulevard.
08/01/2018 03:30 PM UTC
OFFICIAL NOTICE 7-1-2018
COMBINED AND STORM SEWER MAIN RELAY AND COMBINED SEWER MAIN LINING: Located at: S. 25th St. – W. Becher St. to W. Grant St. S. 29th St. – W. Grant St. to W. Lincoln Ave. S. 30th St. – W. Grant St. to W. Lincoln Ave. W. Grant St. – S. 25th St. to S. 30th St. W. Harrison Ave. – S. 27th St. to S. 28th St. W. Lincoln Ave. – S. 28th St. to S. 31st St.
07/31/2018 03:30 PM UTC
OFFICIAL NOTICE 107-1-2018
INSTALLATION OF LED TRAFFIC SIGNAL MODULES 12 - INCH
07/30/2018 03:30 PM UTC
OFFICIAL NOTICE 97-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211150108 – S. 19th St. - W. Edgerton Ave. to 100’ n/o W. Halsey Ave. ST211150107 – S. 16th St. – W. Edgerton Ave. to 300’ n/o W. Holmes Ave.
07/26/2018 03:30 PM UTC
OFFICIAL NOTICE 82-1-2018
Sealed bids will be opened on WEDNESDAY, JULY 25, 2018 at 10:30 A.M. for PAVING WORK, in the following locations: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211070132 – S. 91st St. - 300'+/- s/o W. Adler St. to W. Adler St. ST211180114 – W. Verona Ct. - S. 77th St. to S. 70th St. ST211180115 – S. 28th St. - W. National Ave. to W. Pierce St. ST211180106 – S. 54th ST. - W. Midland Dr. to W. Forest Home Ave.
07/25/2018 03:30 PM UTC
OFFICIAL NOTICE 106-1-2018
50 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
07/24/2018 03:30 PM UTC
671 - 680 of 1386 Solicitations
1 2 64 65 66 68 70 71 72 138 139