General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
Official Notice 24-1-2020
Witkowiak Park Reconstruction 1648 South 4th Street Milwaukee WI 53204
01/16/2020 04:30 PM UTC
OFFICIAL NOTICE 116-1-2019
WATER MAIN RELAY AND HYDRANT ALTERATION at the following locations: S. 108TH St.(WT410190008), at W. Layton Av.(4 working days); S. New York Av.(WT410190675), E. Bottsford Av. to E. Van Norman Av.(16 working days); E. Bottsford Av.(WT410190676), S. Pennsylvania Av. to 300’ E/O S. Illinois Av.(33 working days); N. Teutonia Av.(WT410200001), W. Groeling Av. to W. Capitol Dr.(13 working days); N. 60th St.(WT410200003), W. Capitol Dr. to W. Hampton Av.(4 working days) (Note: Contractor to furnish and install approximately 2537 Lin. FT. 16", 12", 8", and 6" ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2019 04:30 PM UTC
OFFICIAL NOTICE 113-1-2019
WATER MAIN RELAYS at the following locations: W. Jeffrey La.(WT410190601), N. 108th St. to N. 110th St.(24 working days); W. Stark St.(WT410190602), N. 107th St. to N. 110th St.(27 working days); N. 108th St.(WT410190603), W. Jeffrey La. to W. Villard Av.(49 working days); W. Jeffrey Ct.(WT410190604), N. 110th St. to 250’ W/O N. 110th St.(9 working days); N. 110th St.(WT410190605), W. Hampton Av. to W. Cameron Av.(21 working days); N. 11th St.(WT41090674), W. Birch Av. to W. Silver Spring Dr.(13 working days) (Note: Contractor to furnish and install approximately 6,230 lin. ft. of 16”, 8”, 6”, 4”, and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/17/2019 04:30 PM UTC
OFFICIAL NOTICE 114-1-2019
WATER MAIN RELAYS at the following locations: N. 97th St. (WT410190607), W. Nash St. to W. Metcalf Pl. (21 working days); N. 97th Pl. (WT410190608), W. Nash St. to W. Metcalf Pl. (21 working days); W. Nash St. (WT410190610), N. 96th St. to N. 100th St. (37 working days); N. 82nd St. (WT410190632), W. Marion St. to 300’ N/O W. Marion St. (10 working days); W. Marion St. (WT410190633), N. 80th St. to N. 82nd St. (20 working days); N. 47th St. (WT410190654), W. Capitol Dr. to W. Fiebrantz Av. (19 working days); N. 49th St. (WT410190673), W. Capitol Dr. to W. Fiebrantz Av. (17 working days). (Note: Contractor to furnish and install approximately 5,507 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/16/2019 04:30 PM UTC
OFFICIAL NOTICE 90-1-2019
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING/MILLING, TRAFFIC SIGNALS AND LIGHTING INSTALLATION, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC, ETC.; Located at: TD09480001 – W. Becher St. – S. 1st St. to The Kinnickinnic River. E. Becher St. - S. Kinnickinnic Ave. to S. 1st St.
12/10/2019 04:30 PM UTC
OFFICIAL NOTICE 117-1-2019
75 LEAD SERVICE LINE REPLACEMENTS - WINTER at various locations within the City of Milwaukee.
11/26/2019 04:30 PM UTC
OFFICIAL NOTICE 86-1-2019
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211060118 – S. 22nd Pl. – W. Mallory Ave. to W. Clayton Crest Ave. ST211150124 – S. 11th St. - W. Harrison Ave. to W. Lincoln Ave.
11/21/2019 04:30 PM UTC
OFFICIAL NOTICE 112-1-2019
PROJECT NO. 1: COMBINED SEWER MAIN SLIP LINING , MANHOLE REPAIR AND LINING: Located at: N. 26th St. (E/S) – W. North Ave. to W. Wright St. W. Medford Ave. – W. Wright St. / N. 26th St. to N. 27th St. N. 27th St. – W. Medford Ave. to W. Center St.
11/08/2019 04:30 PM UTC
OFFICIAL NOTICE 37-1-2019
PROJECT NO.1: STORM SEWER CLEANING AND EXAMINATION Various Locations in the City of Milwaukee
10/30/2019 03:30 PM UTC
OFFICIAL NOTICE 25-1-2019
HP-186: COAGULATION BASIN #1 FLOCCULATOR UPGRADES
10/22/2019 03:30 PM UTC
681 - 690 of 1553 Solicitations
1 2 65 66 67 69 71 72 73 155 156