General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 33-3-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Central Forestry District: Area approximately bounded by W Center St. to W I-94
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-2-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: South Forestry District: Area approximately bounded by W I-94 to W Oklahoma Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-1-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: South Forestry District: Area approximately bounded by W Oklahoma Av. to South City Limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 26-1-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 26-2-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 2-1-2026
PROJECT NO. 1: SANITARY, STORM, AND COMBINED SEWER MAIN RELAY N. 6th St. – 250’ ± S. of W. Vienna Ave. to W. Vienna Ave. N. 23rd St. – 140’ N. of W. McKinley Ave. to 240’ N. of W. McKinley Ave. N. 39th St. – W. Fairmount Ave. to W. Lancaster Ave. N. 53rd St. – W. Center St. to W. Hadley St. W. McKinley Ave. – N. 23rd St. to N. 24th St.
02/26/2026 04:30 PM UTC
OFFICIAL NOTICE 30-1-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 4. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: NORTH AVENUE, NORTH 20TH ST, CAPITOL DRIVE, AND NORTH 13TH ST.
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 30-2-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 10. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: INTERSTATE 94 AND SOUTH CITY LIMIT
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 29-1-2026
SOUTH 16TH STREET BRIDGE OVER KINNICKINNIC RIVER REPAIRS.
02/24/2026 04:30 PM UTC
OFFICIAL NOTICE 23-1-2026
WATER MAIN RELAYS Located At: W. Martin Ln. (Wt410240604), S. 3rd St. To S. 4th St. (7 Working Days); W. Bottsford Av. (Wt410240605), S. 3rd St. To S. 5th St. (13 Working Days); W. Allerton Av. (Wt410240606), S. 3rd St. To S. 5th St. (14 Working Days); S. 5th St. (Wt410240607) W. Bottsford Ave. To W. Armour Ave. (18 Working Days); N. 13th St. (Wt410240619) W. Keefe Ave. To W. Atkinson Ave. (61 Working Days); W. Nash St. (Wt410240620) N. 13th St. To N. 14th St. (6 Working Days); W. Fiebrantz Ave. (Wt410240624) N. 67th St. To N. 70th St. (16 Working Days); N. 68th St. (Wt410240625) W. Fiebrantz Ave. To W. Hope Ave. (15 Working Days); E. Hadley St. (Wt410240633) N. Fratney St. To N. Pierce St. (11 Working Days); E. Auer Ave. (Wt410240634), N. Richards St. To N. Booth St. (16 Working Days); W. National Ave. (Wt410250752) S. Layton Blvd. To S. 39th St. (19 Working Days). (Note: Contractor to furnish and install approximately 9,302 lin. ft. of 16”, 12”, 8” 6”, and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/20/2026 04:30 PM UTC
61 - 70 of 1601 Solicitations
1 2 3 4 5 7 9 10 11 160 161