General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 1-1-2025
Street Lighting LED upgrade CRP AREA B: E/W Juneau Ave. to E/W Oklahoma Ave, Lake Michigan to West City Limit
04/25/2025 03:30 PM UTC
OFFICIAL NOTICE 53-1-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 53-2-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 18-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; ST211220209 – North 30th Street – West Atkinson Avenue to West Hampton Avenue ST211210219 – West Gertrude Drive – West Stark Street to West Grantosa Drive
04/29/2025 03:30 PM UTC
OFFICIAL NOTICE 25-1-2025
SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING N. 34th St. - W. Clybourn St. to 250’ S. of W. Clybourn St. N. 36th St. – W. Michigan St. to W. Wisconsin Ave. N. 59th St. – W. Vine St. to 460’+/- N. of W. Vine St. E. Brown St. – 140’+/- W. of N. Hubbard St. to N. Hubbard St. W. Michigan St. – N. 36th St. to 145’+/- E. of N. 39th St.
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 25-2-2025
2025 SANITARY SEWER MANHOLE INSPECTION
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 65-2-2024
350 LEAD SERVICE LINE REPLACEMENTS - EQUITY PRIORITIZATION PROGRAM
05/03/2024 03:30 PM UTC
OFFICIAL NOTICE 65-3-2024
350 Lead Service Line Replacements - Equity Prioritization Program
05/03/2024 03:30 PM UTC
OFFICIAL NOTICE 65-4-2024
150 Lead Service Line Replacements - Equity Prioritization Program
05/03/2024 03:30 PM UTC
OFFICIAL NOTICE 45-1-2024
The general work requested is: THE REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: RG1515236326 –2024 LED Street Lighting Improvements/Upgrades – Phase 2 @ Various Locations (City Wide)
05/02/2024 03:30 PM UTC
OFFICIAL NOTICE 53-1-2024
PROJECT NO. 1: STORMWATER POND IN: N. 31st St. - W. Capitol Dr. to 250' N. of W. Capitol Dr.
04/30/2024 03:30 PM UTC
OFFICIAL NOTICE 18-2-2024
COMBINED AND STORM SEWER MAIN RELAY IN: Kinnickinnic River – S. 8th St. to S. 13th St.
04/29/2024 03:30 PM UTC
OFFICIAL NOTICE 18-1-2024
SANITARY SEWER MANHOLE INSPECTION: Located at: Various locations within the City of Milwaukee
04/29/2024 03:30 PM UTC
OFFICIAL NOTICE 18-3-2024
BUILDING SANITARY SEWER LATERAL REPLACEMENT & LEAD SERVICE LINE REPLACEMENT IN THE CITY OF MILWAUKEE
04/29/2024 03:30 PM UTC
OFFICIAL NOTICE 56-1-2024
Carpentry labor service for various projects in the City of Milwaukee.
04/18/2024 03:30 PM UTC
OFFICIAL NOTICE 51-2-2024
500 Lead Service Line Replacements - Equity Prioritization Program
04/17/2024 03:30 PM UTC
101 - 110 of 1443 Solicitations
1 2 7 8 9 11 13 14 15 144 145