General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
OSM 16(0030)101.1
Abandoned Mine Reclamation Project Sarah Furnace Madison Township, Clarion County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 210 calendar days Bid Bond Required Mandatory Pre-Bid Meeting: No Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 900 L.F. Clearing and Grubbing, 2.8 ACRE Grading, 16,150 C.Y. Planting, Tree Seedlings, 480 EACH
11/07/2024 07:00 PM UTC
OSM 19(2000)104.1
Abandoned Mine Reclamation Project 314 East Park Street Demolition Conyngham Township, Columbia County Estimated Amount: $0-$100,000 (Small Business Only) Term: 30 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of E&S Controls – Filter Sock (8” Diameter), 375 L.F. Grading, 100 C.Y.
11/07/2024 07:00 PM UTC
OSM 03(3368)101.1
Abandoned Mine Reclamation Project Belnap South Brady Township Armstrong County Estimated Amount: $300,000-$500,000 Term: 270 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 3,144 L.F. Clearing and Grubbing, 18.8 ACRE Grading, 179,958 C.Y. Mushroom Compost, 1,880 C.Y.
10/31/2024 06:00 PM UTC
OSM 02(1726)102.1
Abandoned Mine Reclamation Project Graham Boulevard Municipality of Penn Hills, Allegheny County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Clearing and Grubbing, 1 L.S. Trench Excavation, 1,173 C.Y Precast Inlet Box, 1 EACH Repaving - PA DOT 2A Stone, 1.39 C.Y. Repaving - Twenty-five-millimeter (25 mm) Superpave Base Course, 1.225 TON Repaving - Nineteen-millimeter (19 mm) Superpave Binder Course, 0.6125 TON Repaving - Nine and one-half millimeter (9.5 mm) Superpave Wearing Course, 4.36 S.Y. Traffic Control, 1 L.S. Subsurface Drain - Eight-Inch (8”) Nominal Diameter Subsurface Drain - Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 151 L.F. Subsurface Drain - AASHTO No. 1 Coarse Aggregate, 1,173 C.Y. Seeding – Seeding, 1 L.S. Seeding – Topsoil, 1 TON
10/17/2024 06:00 PM UTC
OSM 54(4663)101.1
Abandoned Mine Reclamation Project Coal Castle Revitalization New Castle Township, Schuylkill County Estimated Amount: $1,000,000 to $5,000,000 Term: 550 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Grading – 511,000 cubic yards Dewatering Impoundment – 1 lump sum Drainage Excavation – 1,060 cubic yards Rock Lining – 1,340 square yards Rock Crawling Pathway – 2,270 square yards Seeding – 44 acres
10/10/2024 06:00 PM UTC
OSM 10(2900)101.1
Abandoned Mine Reclamation Project West Liberty No. 1 Brady Township, Butler County Estimated Amount: $500,000-$1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, 1,728 L.F. Grading – Grading, 175,894 C.Y. Seeding – Seed Bed Preparation, 21.0 ACRE Fence – Permanent Fence, 1,500 L.F.
09/19/2024 06:00 PM UTC
OOGM 24-1
Cleaning Out and Plugging Twenty (20) Abandoned Permitted/Rule Authorized Class IIR Injection Wells, Highland Township, Elk County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug Twenty (20) Abandoned Injection Wells, estimated to be up to 3,000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: July 17th, 2024, at 8:00 a.m. Department representatives will meet contractors at: 41.534820, -78.914210. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
08/01/2024 06:00 PM UTC
OSM 10(6599)101.1
Abandoned Mine Reclamation Project DeSale South Venango Township, Butler County Mandatory Pre-Bid Meeting: No Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 2 L.S. Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, Eighteen-Inch (18") Diameter, 300 L.F. Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock, Thirty-Six-Inch (36") Diameter, Stacked, 2,232 L.F. Grading, 87,000 C.Y. Planting - Tree Planting Bed Preparation, 9 ACRE Planting - Grass Seed Bed Preparation, 2 ACRE Planting - Tree Seedlings, 5,550 EACH
07/25/2024 06:00 PM UTC
OSM 10(2904)101.1
Abandoned Mine Reclamation Project Slippery Rock Creek Marion Township, Butler County Estimated Amount: $300,000-$500,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 2,014 L.F. Clearing and Grubbing, 1 L.S. Subsurface Drains with Cleanouts, 1,718 L.F. Grading, 127,498 C.Y.
06/13/2024 06:00 PM UTC
OSM 16(1957)101.1
Abandoned Mine Reclamation Project Mahles Run East Knox and Washington Townships, Clarion County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32"Diameter), 1,414 L.F. Sealing Collapsed Mine Entry, 1 EACH Subsurface Drain, 494 L.F. Grading – Grading, 35,543 C.Y. Seeding – Mulching, 6.8 ACRE
05/30/2024 06:00 PM UTC
1 - 10 of 152 Solicitations
← Previous 1 3 4 5 6 7 8 9 15 16