General Info

Business Logo

City of Worthington, OH - Service and Engineering Department

6550 N High St, Worthington, OH 43085-4016
(614) 431-2425

Worthington was one of the Midwest’s first planned communities, blending commerce, residential life, education and faith. Founded in 1803, Worthington reflects its dignified New England heritage with authentic brick sidewalks leading to the central village green, where many of the City’s original commercial buildings and churches still stand proudly. Just north of Columbus on US Route 23, Worthington's small town charm is just minutes from all Central Ohio has to offer.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Fire Station HVAC Program, Project No. 763-24
Turnkey replacement of a 40-ton single zone VAV rooftop unit at the City of Worthington Fire Station.
10/16/2024 04:30 PM UTC
Northbrook Relief Sewer Phase 2, Project No. 656-17
Installing an 18-inch sanitary sewer to replace an existing 12-inch sanitary sewer to increase sewer capacity. Work includes sewer installation, clearing, grubbing, landscaping, pipe removal & pipe filled in-place, directional boring, seeding & mulching, and other related work.
10/16/2024 04:00 PM UTC
FRA-Selby Blvd West Bridge Replacement (PID 116037) 736-22
Project consists of the replacement of the existing culvert carrying W Selby Blvd over Rush Run. The existing structure is twin precast reinforced concrete box culverts with 12-ft span and 8-ft rise. The proposed structure is a precast reinforced concrete three-sided flat top culvert with a 26' span x 7' - 2" rise and a length of approximately 72-ft. The proposed culvert will be sitting on cast-in-place base slab.
05/22/2024 04:00 PM UTC
FRA-Selby Blvd West Bridge Replacement (PID 116037) 736-22 04/30/2024 04:00 PM UTC
2024 Street & Sidewalk Maintenance Program, Project No. 760-24
Construction of ADA compliant curb ramps & sidewalks, asphalt pavement, planing and overlay, spot curb & gutter replacement, asphalt pavement repair, asphalt rejuvenation, inlet repair, temporary roadway and other improvements. Engineer's Estimate is $976,078.00.
03/12/2024 04:00 PM UTC
City of Worthington Park Overlook Drive and Andover Street 8-Inch Water Main Project Number 732-22
Construction waterline replacement and improvements in the vicinity of Park Overlook Drive and Andover Street in the Colonial Hills neighborhood in Worthington, OH. Engineer's Estimate is $1,057,440.00. See Supplemental Specifications (SP-18) for Project schedule. A live bid opening will take place via Microsoft Teams on Friday, January 5 at 12:00 PM EST. The meeting information is provided below: https://teams.microsoft.com/l/meetup-join/19%3ameeting_OGE4NjA1ODItZWMyMy00NWY0LTkyNjEtODBhOTk2ZWMzMTAw%40thread.v2/0?context=%7b%22Tid%22%3a%2215123016-39bd-47b2-a8d1-e3dd82e6b56d%22%2c%22Oid%22%3a%22c611d7fd-faeb-4479-82b0-5635098afbf2%22%7d Meeting ID: 230 443 777 147 Passcode: CC29go Or call in (audio only) +1 929-346-7262,,153947640# United States, New York City Phone Conference ID: 153 947 640#
01/05/2024 05:00 PM UTC
Worthington Community Center South End Window Replacement
The City of Worthington Community Center South End Replacement of original casement windows in the Art Room and Child Care room.
10/25/2023 04:00 PM UTC
Request for Proposal for the Purchase of Cardiac Defibrillator Monitors for the City of Worthington Division of Fire & EMS ew Solicitation (7)
In accordance with the City of Worthington (City) Codified Ordinances, the City of Worthington requests proposals for the purchase of (3) cardiac monitors with automated external defibrillator and related components for use by the City of Worthington Division of Fire & EMS. For the convenience of the respondent, this RFP is structured as follows: Section 1 – Introduction Section 2 – Scope of Products & Services Section 3 – Proposal Submission Requirements Section 4 – Evaluation Process Section 5 – Terms & Conditions In order to be considered, all bid responses must be submitted in writing no later than 1:00 P.M. on Wednesday, August 30th, 2023. Bidders mailing bid packages should allow delivery time to ensure timely receipt of their bid. The responsibility for getting the bid response to the City of Worthington on or before the specified time and date is solely and strictly the responsibility of the submitting bidder. The City of Worthington or Division of Fire & EMS shall in no way be responsible for delays caused by any occurrence. All questions regarding this RFP may be sent to jennifer.cochran@worthington.org Sealed bids may be hand delivered or mailed to: City of Worthington ATTN: Finance Director 6550 N. High St. Worthington, Oh 43085 Hours of Operations: 8:00 a.m. to 4:30 p.m. Monday through Friday
08/30/2023 05:00 PM UTC
2023 Street and Sidewalk Maintenance Program Project Number 748-23
Construction of ADA compliant curb ramps & sidewalks, asphalt pavement, planing and overlay, spot curb & gutter replacement, asphalt pavement repair, asphalt rejuvenation, inlet repair, and other improvements. Engineer's Estimate is $1,042,650.00
05/30/2023 04:00 PM UTC
Worthington HVAC Improvement Program Project 720-21
The project includes improvements, repairs and replacements to HVAC Equipment and appurtenances in three City Buildings.
05/10/2023 04:00 PM UTC
1 - 10 of 51 Solicitations
← Previous 1 3 4 5 6