General Info

Business Logo

State of Oklahoma, Division of Capital Assets Management, Construction & Properties

1915 N Stiles Ave, Oklahoma City, OK 73105-4919
(405) 521-2112

See attachments for important information regarding submitting bids. 

Standard Documents

Upcoming Solicitations

Number Deadline
CAP25-0176
Structural slab repair & kitchen flooring replacement at Lexington Assessment & Reception Center.
05/07/2026 07:00 PM UTC
CAP26-0337
Preventive and corrective maintenance contract for Tier-3 Data Center critical power maintenance
05/07/2026 07:00 PM UTC
CAP26-0351
Repair by replacement 2 sections of bad/collapsed sewer line. These 2 sections of sewer line are under the slab that has collapsed.
05/07/2026 07:00 PM UTC
CAP26-0341
Repair: Pole Light & Base, Track Lighting, Replace Hangar Door Power Track System-OKCAB31
05/12/2026 07:00 PM UTC
CAP26-0342
West OKC/Mustang detention pond improvements - FACT/OKDE
05/14/2026 07:00 PM UTC
CAP26-0359
An annual military aircraft hangar door maintenance contract for the Army Aviation Support Facilities (AASF). The purpose of this contract will be to establish a predetermined price for annual inspections and preventative maintenance services, and to provide a set labor rate for additional maintenance and repair services that may be required during the contract period.
05/19/2026 07:00 PM UTC
CAP26-0362
CAP26-0362 - Gilbreath Copper Mine Restoration 2 - Olustee, OK - OKCC
05/19/2026 07:00 PM UTC
CAP26-0370
Project Description + any other pertinent details.
05/21/2026 07:00 PM UTC
CAP25-0274
Remodeling Existing Restrooms to ADA Compliant
05/26/2026 07:00 PM UTC
CAP26-0323 R1
This is an environmental remediation project involving removal of sludge and sediment from two lagoons at a military training center. Contractor will remove approximately 1.3 million gallons of accumulated sludge and restore lagoons to 90% capacity. May require Oklahoma state licensing, bonding, and hazardous waste disposal capabilities.
05/28/2026 07:00 PM UTC
10 Solicitations

Closed Solicitations

Number Deadline
CAP24-0087
The Project consists of the base bid construction of an addition to the existing Career Center building, renovation of the existing building, associated site and utility work, and new perimeter fencing.
03/20/2025 07:00 PM UTC
CAP25-0254
Pre-Bid meeting changed to 3/4/2025 at 1:00PM. Demo and replace the existing carpet in building C of the CLEET training center at 2401 Egypt Road, Ada, Oklahoma, 74820. The project will consist of both classrooms and corridors. The square footage of the carpet to be replaced will be 20269 SF. The vendor will provide all labor, carpet, adhesive, nosing, transitions, and cove base or other materials required to install and complete the project. After removing the existing carpet, the vendor will be responsible for scraping, cleaning, or preparing the slab for proper adhesion. The agency will be responsible for moving furniture.
03/13/2025 07:00 PM UTC
CAP24-0059R2
The Project consists of refurbishment of the elevator in the Family TREE facility located at 5909 Classen Ct, Oklahoma City, OK 73118. These improvements will provide a code compliant elevator with reduced outages. They will also improve down time for any repairs as new components are readily available for replacement, while existing components are obsolete.
03/13/2025 07:00 PM UTC
CAP25-0153
Replacement of existing electrical distribution equipment such as panelboards, load centers, and transformers with new equipment. Removing existing transformers from the electrical closets and installing new transformers in the basement mechanical room. Addition of mechanical units in the basement to provide required cooling for transformers.
02/27/2025 08:00 PM UTC
CAP25-0150
The Project consists of the upgrade of the existing two (2) passenger elevators, including equipment replacement, cab finish replacement, and miscellaneous code upgrades.
02/20/2025 08:00 PM UTC
CAP25-0151
The Project consists of the upgrade of the existing four (4) passenger elevators and one (1) freight elevator, including equipment replacement, cab finish replacement and miscellaneous code upgrades.
02/20/2025 08:00 PM UTC
CAP25-0148
The Project consists of the replacement of existing curtainwall at the east entrance to the Denver Davison Building with new curtainwall. Project includes the replacement of interior floor tile at the vestibule and a portion of the exterior to allow for waterproofing of the slab edge and improved drainage at the entrance.
02/20/2025 08:00 PM UTC
CAP24-0120
CAP24-0120 - Spiro Mounds Museum Restroom Renovation - Spiro, OK - OHS
02/18/2025 08:00 PM UTC
CAP25-0131
Update old pneumatic controls to new digital climate controls throughout the main complex and connected to the existing I Vu Pro climate control system.
01/30/2025 08:00 PM UTC
CAP25-0147
Denver Davison Electrical Upgrade. Replacement of existing electrical distribution equipment, including but not limited to panelboards, load centers, transformers in violation with the National Electric Code.
01/30/2025 08:00 PM UTC
81 - 90 of 621 Solicitations
1 2 5 6 7 9 11 12 13 62 63