General Info

Business Logo

City and Borough of Sitka

100 Lincoln St, Sitka, AK 99835-7540
(907) 747-1800


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
GPIP Safety Improvements
This project consists of furnishing Handrails and Ladders to the City and Borough of Sitka, Gary Paxton Vessel Haulout Facility in Sitka, Alaska.
12/17/2025 11:00 PM UTC
RFQ Electric Utility Professional Service Roster
The CBS Electric Utility Department expects to rely primarily on its Professional Services Roster to award professional service contracts. CBS expects to maintain this Professional Services Roster through 2026 as described in this solicitation, until a new roster is established in 2027.
11/01/2026 01:00 AM UTC
2 Solicitations

Closed Solicitations

Number Deadline
RFP E911 System Replacement
The Request for Proposal (RFP) solicits proposals from vendors who can provide the required equipment and/or services for a complete overhaul and/or replacement of the CBS 911 System.
03/01/2018 11:00 PM UTC
Jarvis Fuel Sytem Improvement Project
The project consists of providing all labor, equipment and material necessary for the Jarvis Fuel System Improvement Project. The project includes various improvements to existing above-ground fuel distribution piping and other ancillary items required to complete the work. Nominal pipe diameters are 4" and smaller.
02/28/2018 11:00 PM UTC
Sitka Wayfinding Signage
This work consists of providing all labor, equipment, and material necessary to furnish and install the Sitka Wayfinding Signage, including but not limited to providing, engineering, production of shop drawings, fabrication, shipping/delivery and installation.
02/20/2018 11:00 PM UTC
Blue Lake Dam Access Project
The project consists of providing all labor, equipment and material necessary for the Blue Lake Dam Access Project. The project includes designing, furnishing and installing steel platforms, fall protection hardware, gates and other ancillary items required to complete the work.
01/18/2018 11:00 PM UTC
Furnish Sand and Gravel
This project consists of furnishing sand and gravel to the Public Service Center, 113 Jarvis Street, and/or the Kimsham Ballfield Complex beyond Kashevaroff Street, Sitka, Alaska.
12/28/2017 11:00 PM UTC
GPIP Shoreline Stabilization 2017
This project consists of providing all labor, equipment and material necessary for the Gary Paxton Industrial Park Shoreline Stabilization Project 2017. The project includes excavation and backfill of existing embankment, installation of construction fabric envelopment, placement of CBS provided oversize riprap and furnish and installation of oversize riprap and other ancillary items that are also required to complete the work.
09/14/2017 10:00 PM UTC
On-Call Electrical Work
The City and Borough of Sitka (CBS) is soliciting on-call contractors to support the CBS with routine electrical work. Contractor(s) must have a collective bargaining agreement or letter of assent with the Union (IBEW 1547).
08/03/2017 10:00 PM UTC
CBS Comprehensive Electrical Load Analysis and Load Development Plan
The project will include, but not necessarily be limited to: a comprehensive electrical load analysis of the CBS system, load development planning with the CBS, and a report of findings.
06/13/2017 10:00 PM UTC
Sitka Paving Project 2017
This project consists of providing all labor, equipment and material necessary for the Sitka Paving Project on limited sections of Lincoln Street, Kashevaroff Street and Hospital Drive. The project includes replacement of select storm drain utilities, curb & gutter, sidewalk. The project also includes removal of all pavement, limited select fill and AC pavement. Replacement of existing manhole rings and covers, valve boxes and other ancillary items are also required to complete the work.
05/25/2017 10:00 PM UTC
South Lake and West DeGroff Utility and Street Improvements
This project consists of providing all labor, equipment and material necessary for the South Lake and West DeGroff Utility and Street Improvements Project. The project includes construction of all water, sewer, storm drain, curb & gutter, sidewalk, AC pavement and other ancillary items required to complete the work.
05/11/2017 10:00 PM UTC
141 - 150 of 183 Solicitations
1 2 11 12 13 15 17 18 19