General Info

Business Logo

Solicitations and notifications are free for this business.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note Effective  January 2025 there will be an increase to the SDP requirements.
MBE and WBE  requirements will no longer be combined.

Requirements as followed: 

MBE:   6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Standard Documents

Name * Description
SDP Instructions and COP.pdf (475 KB)
SDP Instructions and COP.
1 Document

Upcoming Solicitations

Number Deadline
P26-3669-C3A
Hop Brook - Phase IV Remediation 150 Southwest Cutoff Northborough, Massachusetts The project area is a Massachusetts Department of Environmental Protection (MassDEP) disposal site (RTN 2-13150). The project consists of the remediation of the site by excavation and offsite disposal of contaminated soil and wetland sediments in and around several former dump and burn areas. Levels of lead in some of the remediation areas exceed the toxicity characteristic leaching procedure (TCLP) limit of 5 milligrams per liter (mg/L) and require in -situ treatment prior to excavation and offsite disposal. Debris, including glass bottles, refuse, and/or miscellaneous electrical components, is present in some removal areas. Some corroded drums containing miscellaneous electrical components or other solid debris may also be present, requiring removal. Miscellaneous surface debris (tires, metal debris, etc.) may also require removal and offsite disposal. The estimated project cost is $3,200,000 The work is to be accomplished within 200 calendar days of notice to proceed. Liquidated damages in the amount of $500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HAZARDOUS WASTE REMEDIATION & TRANSPORTATION to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive . Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
07/02/2026 04:00 PM UTC
P26-3648-M1A
Improved Surface Trail Maintenance – Eastern MA Counties: Middlesex, Essex, Suffolk, Norfolk, Bristol, Worcester, Plymouth, Barnstable, and Dukes. The project consists of unclassified excavation, pavement reclamation, pavement patching, full depth hot mix asphalt pavement, aggregate pathway installation and patching, selective clearing and/or pruning, gravel trail construction, guard rail installation, installation and maintenance of drainage structures, pavement markings, signs, landscaping, and other work incidental to the rehabilitation of improved surface trails. The estimated project cost is $4,076,368.50 The work is to be accomplished within 1,095 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Highway – Bike Path to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
07/16/2026 04:00 PM UTC
P26-3648-M2A
Improved Surface Trail Maintenance – Western MA Counties: Berkshire, Hampshire, Franklin, Hampden, and Worcester. The project consists of unclassified excavation, pavement reclamation, pavement patching, full depth hot mix asphalt pavement, aggregate pathway installation and patching, selective clearing and/or pruning, gravel trail construction, guard rail installation, installation and maintenance of drainage structures, pavement markings, signs, landscaping, and other work incidental to the rehabilitation of improved surface trails. The estimated project cost is $3,044,948.50 The work is to be accomplished within 1,095 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in -Highway – Bike Path to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
07/16/2026 04:00 PM UTC
P26-3659-C1A
Damon Pond Dam Repairs and Area Improvements Willard Brook State Forest, Ashby, Ma The project consists of work to bring Damon Pond Dam into compliance with the Massachusetts Dam Safety Regulations (302 CMR 10.00) and making state park site improvements. Proposed work includes concrete and masonry repairs to the dam, spillway, and training walls, removal of unsuitable vegetation on and within 20 feet of the dam, site drainage improvements, overtopping protection to the dam embankment and structural repairs to the bridge deck and railings. The project also includes construction of recreational features including two ADA- compliant parking spaces and an ADA/MAAB-compliant stabilized aggregate path from Hosmer Road to the boundary of the southern beach. The estimated project cost is $2,130,971.00 The work is to be accomplished within 365 calendar days of a notice to proceed. Liquidated damages in the amount of $750 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Dam Construction to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. Bidders shall also have a minimum of 10 years of experience and shall have successfully completed at least five dam rehabilitation or repair construction projects within the last 10 years including at least two projects in excess of one million dollars. Submit a summary of experience and representative projects with references to show compliance with the requirements listed above. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
07/23/2026 04:00 PM UTC
W26-7610-C02
Fabric Storage Structures Counties : Barnstable, Berkshire, Bristol, Dukes, Essex, Franklin, Hampden, Hampshire, Middlesex, Nantucket, Norfolk, Plymouth, Suffolk, Worcester The project consists of purchase and statewide installation of up to 5 (five) structures suitable for storage of road salt, other materials and equipment installed at DCR facilities statewide. Sheds should be in three general sizes and quantities. Large – sizes as specified in specifications Medium (DCR Standard Size) – 32' x 30' Small – 22' x 30' The estimated project value is: $400,000 The work is to be accomplished within 1095 calendar days of notice to proceed. Liquidated damages in the amount of $ 1000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for Modular Construction/ Prefab and must submit with the bid an update of their respective qualifications. Nicole LaChapelle Massachusetts Department of Conservation and Recreation
07/23/2026 04:00 PM UTC
P26-3636-C6A
Project Shade: Lake Wyola State Park 94 Lakeview Road, Shutesbury, MA 01072 The project consists of the installation of tree protection, construction fence, and erosion control; installation of (3) small shade pavilions at south end of the site and installation of (1) medium pavilion at the north end of the site; installation of accessible paths, boardwalks, accessible parking improvements, picnic tables, grills and wood post and rail fencing; procurement, installation and maintenance of trees and shrubs, and seeding and establishment of lawn and meadow areas. See documents for list of Owner-supplied wood. The estimated project cost is $891,000.00. The work is to be accomplished within 273 calendar days of notice to proceed. Liquidated damages in the amount of 500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Commissioner Nicole LaChapelle Massachusetts Department of Conservation and Recreation
07/30/2026 04:00 PM UTC
P26-3665-M6A
Bridge Maintenance and Repairs - Statewide The project consists of undertaking scheduled and emergency bridge repairs to bridges- statewide. The work is to be accomplished within 730 calendar days of notice to proceed. Liquidated damages in the amount of _500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Bridge Construction to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Commissioner, Nicole LaChapelle Massachusetts Department of Conservation and Recreation
07/30/2026 04:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
P20-3354-C4A
RE-BID Carpentry – Eastern/Central Massachusetts at DCR Facilities Carpentry Maintenance and Repairs at DCR Facilities in Eastern Massachusetts. Repairs may include accessibility improvements, deck repairs, siding replacement, gutter & downspout replacement. This is a work order contract for building sites not identified at this time and will include work on historic structures. Work on historic Structures shall comply with appropriate architectural preservation standards. The estimated project Base Bid cost is $ 1,300,000
01/20/2021 04:00 PM UTC
P20-3355-C8A
Freetown State Forest- Spray Deck The estimated project cost is $ 1,000,000 Demolition of existing wading pool, piping, and associated concrete walkways. Reconstruction of a new spray deck, piping and associated new walkways. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
01/20/2021 04:00 PM UTC
P09-2580-C2A
General: ISLAND DISTRICT HEADQUARTERS BUILDING EXTERIOR RENOVATIONS replacement of all exterior doors and windows, including new openings for doors and windows and infill of existing openings as indicated in the Drawings, and replacement of the exterior cladding at the Second Floor with a new rainscreen system and additional insulation. Interior work is limited to new air conditioning and ventilation at portions of the Second Floor, and work associated with the exterior rehabilitation. CONTRACTS FOR BUILDING PROJECTS ESTIMATED TO COST OVER $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. C. 149
01/06/2021 04:00 PM UTC
P21-3419-M2A
Masonry and Concrete Repairs- Statewide Masonry and Concrete Repairs at DCR Facilities Statewide. Repairs may include restoration of masonry walls, reconstruction or stabilization of stone and brick areas, replacement of deteriorated cast in place concrete building components, etc. This is a work order contract for DCR building and facility locations statewide (specific sites not identified at this time) and will include work on historic structures. Work on historic Structures shall comply with appropriate state and federal preservation standards M.G.L. C. 149 CONSTRUCTION.
12/23/2020 04:00 PM UTC
P21-3409-C1A
Intersection Improvement Project – Fresh Pond Parkway at Mt. Auburn Street The project consists of, but is not be limited to, installation of new traffic signal equipment, geometric roadway modifications, narrowing Fresh Pond Parkway southbound barrel, from Brattle Street to Mt. Auburn Street, and Gerry’s Landing Road southbound barrel, from Mt. Auburn Street to Memorial Drive, to two lanes from three, pavement milling and overlay, installation of new curb and raised median to separate the proposed two-way bicycle path – on Gerry’s Landing Road southbound, starting south of Mt. Auburn Street intersection and ending at Memorial Drive intersection – from vehicular traffic. The estimated project cost is $1,780,000.00 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
12/23/2020 04:00 PM UTC
P21-3409-M2A
Servicing of High Voltage Power Line Systems. The estimated project cost is $ 1,000,000.00 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
12/16/2020 04:00 PM UTC
P18-3192-C2A
Contract No:P18-3192-C2A: Beartown Superintendent’s House Structural Repair The estimated project cost is $213,157.00
12/16/2020 04:00 PM UTC
P09-2580-C2A
Sub-Bids :ISLAND DISTRICT HEADQUARTERS BUILDING EXTERIOR RENOVATIONS: Sub-BID :Electrical; HVAC; Masonry; Metal Windows; Painting; Waterproofing, Damp proofing and Caulking.
12/16/2020 04:00 PM UTC
P18-3234-C1A
CAPE COD RAIL TRAIL EXTENSION WELLFLEET, MA The estimated project cost is $ 2,068,196. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
12/09/2020 04:00 PM UTC
P20-3354-C5A
Carpentry at DCR Facilities: Western & Central & Massachusetts Counties: Berkshire, Franklin, Hampshire Hamden,Worcester Estimate $ 700,000
11/25/2020 04:00 PM UTC
291 - 300 of 319 Solicitations
1 2 24 25 26 27 28 30 32