BREC
6201 Florida Blvd, Baton Rouge, LA 70806-4467
(225) 272-9200 x522
6201 Florida Blvd, Baton Rouge, LA 70806-4467
(225) 272-9200 x522
Name * | Description | |
---|---|---|
bidexpressinstructions.pdf (285 KB) | ||
Number | Deadline |
---|---|
SB1843 Santa Maria Clubhouse Roof Replacement
Project Description: Roof replacement at the Santa Maria Clubhouse.
Bid Opening Information:
November 26, 2024 at 2:00PM CST
BREC Administration Building
6201 Florida Blvd.
Room 1501
Baton Rouge, LA 70806
Non-Mandatory Pre-bid conference:
November 13, 2024 at 9:00AM CST
Santa Maria Golf Course Club House.
18460 Santa Maria Parkway
Baton Rouge, LA 70810
| 11/27/2024 02:00 AM UTC |
Number | Deadline |
---|---|
SB #1686 -WEBB PARK GOLF COURSE MINI RANGE & HOLE 1 IMPROVEMENTSon
Relocating and re-shaping the tees on Hole #1 at Webb Park Golf Course, installation of new cart path and cart parking, and the construction of a “mini range” practice facility.
| 11/22/2016 08:00 PM UTC |
SB 1687 SWIMMING POOL CHEMICALS FOR BREC SITES
Swimming Pool Chemicals for Delivery to BREC Sites per Bid Specifications
| 11/21/2016 04:30 PM UTC |
SB 1683 INDEPENDENCE PARK PLAYGROUND
This new play area will include concrete sidewalks, site work, grading, drainage, playground equipment, engineered wood fiber safety surfacing, pavilions, and site furnishings.
| 10/20/2016 07:00 PM UTC |
SB 1684 - Beaver Creek Golf Course Pavilion and Outdoor Tournament area
To remove an existing pavilion and install a new larger pavilion and associated paving.
| 10/20/2016 06:00 PM UTC |
SB 1679 - GREENWOOD COMMUNITY PARK PEDESTRIAN BRIDGE
Construction of bridge footings, installation of 8-foot wide by 65-foot long prefabricated bridge, and placement of channel protection.
| 09/15/2016 07:00 PM UTC |
SB# 1681 INDEPENDENCE PARK BOTANICAL GARDEN PHASE 1
The project is a first phase of a master plan for improvements to the Botanical Gardens at Independence Community Park. The major components of the project are a walkway system connecting the new Goodwood Library to the Gardens, a formal parterre garden, landscaping, irrigation, site furnishings, lighting, unit paving, a fountain, and garden structures.
| 09/13/2016 07:00 PM UTC |
SB 1678 SANTA MARIA PLAYGROUND
This new playground will include concrete sidewalks, site work, grading, drainage, playground equipment, engineered wood fiber safety surfacing, and site furnishings.
| 09/13/2016 07:00 PM UTC |
SB 1676 Farr Park Sewer Improvements
The project consists of the demolition and replacement of a new submersible grinder pump station complete with a discharge force main.
| 09/08/2016 07:00 PM UTC |
SB 1680 VeriFone MX915 Payment Card Readers
Sealed Bid Number 1680 VeriFone MX915 Payment Card Readers
| 09/01/2016 03:00 PM UTC |
SB 1673 - Howell Park Improvements
Demolition, Grading, Site-Work, Fishing Pond, Concrete Paths, Parking Lots, Modular Restrooms, Basketball Court and Lighting, Parking Lot Lighting, Electrical Infrastructure, Multi-Purpose Sports Field, Sports Turf, Chain-Link Fencing, Bridge Railing, Utility Infrastructure, Picnic Shelter, and Playground.
| 07/21/2016 07:00 PM UTC |