BREC
6201 Florida Blvd, Baton Rouge, LA 70806-4467
(225) 272-9200 x522
6201 Florida Blvd, Baton Rouge, LA 70806-4467
(225) 272-9200 x522
Name * | Description | |
---|---|---|
bidexpressinstructions.pdf (285 KB) | ||
Number | Deadline |
---|---|
SB1843 Santa Maria Clubhouse Roof Replacement
Project Description: Roof replacement at the Santa Maria Clubhouse.
Bid Opening Information:
November 26, 2024 at 2:00PM CST
BREC Administration Building
6201 Florida Blvd.
Room 1501
Baton Rouge, LA 70806
Non-Mandatory Pre-bid conference:
November 13, 2024 at 9:00AM CST
Santa Maria Golf Course Club House.
18460 Santa Maria Parkway
Baton Rouge, LA 70810
| 11/27/2024 02:00 AM UTC |
Number | Deadline |
---|---|
SB 1659 - Renovations to Gus Young Park
The work of this contract consists of renovations and additions to the existing facility. The new addition will be constructed to match the existing building type of brick exterior veneer and CMU interior. Renovations include installation of new retrofit standing seam roof on the existing gymnasium and new standing seam roofing of the existing offices, activity area and new addition. Existing CMU walls are being reconfigured to create ADA compliant restrooms and to accommodate a handicap lift. New thermal aluminum windows are being installed at the existing and new addition, along with new VCT flooring, epoxy flooring, CMU walls, gypsum board ceilings and acoustic ceiling tiles. Perforated metal image screens will be used at the storefront windows. Existing and addition will receive new HVAC with raised outside units.
| 04/12/2016 07:00 PM UTC |
SB 1655
Annual Contract for T-Shirts and Polo Shirts
File No. C-02609
| 03/22/2016 04:00 PM UTC |
SB 1646 BREC Administration Building Renovations
The project consists of interior renovations to adjust or add office space at the existing 2 story office building, including associated mechanical, electrical and special systems work.
| 03/15/2016 07:00 PM UTC |
SB 1664 EXPRESSWAY PARK - Field Lighting
The scope of the project is to include field lighting and associated transformer, electrical gear, and pay-per-use light rental station and other miscellaneous site construction as detailed in the construction drawings & specifications.
| 03/15/2016 07:00 PM UTC |
SB 1648 - FOREST COMMUNITY PARK RECREATION CENTER RENOVATION
The project is an addition and partial renovation to the existing recreation
center located in Forest Community Park. The major components of the project
are the relocation of the entry, multipurpose rooms, new restroom facilities, addition of
an HVAC system to the existing gymnasium.
| 03/10/2016 08:00 PM UTC |
SB 1653 - Independence Community Park Recreation Center Parking and Site Improvements
This project consists of removing a portion of the existing asphalt pavement and resurfacing with new 3” thick asphalt pavement. Also included are concrete paving, concrete curbs, site drainage, lighting, landscaping, and pavement markings.
| 03/10/2016 08:00 PM UTC |
SB 1644 Recreation Center Renovations at Antioch Boulevard Park
The project is an addition and partial renovation to the existing recreation center located in Antioch Boulevard Park. The major components of the project are the addition of an HVAC system to the existing gymnasium, new restroom facilities and new multipurpose room addition.
| 02/25/2016 08:00 PM UTC |
SB-1647, File No. C02174
Annual Contract for Horse Bed Shavings to be delivered to BREC Central Warehouse, upon request as needed..
| 02/18/2016 05:00 PM UTC |
SB 1650 - Kathy Drive Park Improvements
The proposed improvements to Kathy Drive Neighborhood Park include: a new 2-5 year old playground and drainage, a new 5-12 year old playground and drainage, concrete pedestrian pavement, parking improvements including concrete ADA parking and new connector driveway, site furnishings, landscaped berms with trees, a 16'x20' pavilion, three (3) sand volleyball courts with drainage and a sand soccer field with drainage.
| 02/17/2016 08:00 PM UTC |
1649 - INDEPENDENCE PARK BOTANICAL GARDEN PHASE 1
The project is a first phase of a master plan for improvements to the Botanical Gardens at Independence Community Park. The major components of the project are a walkway system connecting the new Goodwood Library to the Gardens, A formal Parterre Garden, Landscaping, irrigation, site furnishings, lighting, unit paving and garden structures.
| 02/17/2016 08:00 PM UTC |