General Info

Business Logo

BREC

6201 Florida Blvd, Baton Rouge, LA 70806-4467
(225) 272-9200 x522


Standard Documents

Name * Description
bidexpressinstructions.pdf (285 KB)
1 Document

Upcoming Solicitations

Number Deadline
SB 1878 MELVIN KIP HOLDEN PEDESTRIAN BRIDGE IMPROVEMENTS AT HARDING BLVD
SB 1878 MELVIN KIP HOLDEN PEDESTRIAN BRIDGE IMPROVEMENTS AT HARDING BLVD. Project Description: Furnish and install a prefabricated pedestrian bridge, approximately 8’ x 110’ which crosses Monte Sano Bayou and will also include demolition of previously exiting bridge structures, rip rap installation in the channel, concrete paving to tie-in to existing pathways on either side of the bridge, and other misc. work associated with the new bridge installation. Bid Opening information: October 27, 2026 at 2:00PM CST BREC's Administration Building 6201 Florida Blvd. Room 1501 Baton Rouge, LA 70806 Non- Mandatory Pre-Bid Conference October 14, 2026 at 9:00AM CST 3280 Harding Blvd. Blvd. Baton Rouge, LA 70807
11/03/2026 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Sealed Bid Number #1698
Leases for Trailers for Howell Community Park Temporary Facility. The intent of this specification is to obtain pricing for the leasing of trailers/modular buildings as described herein to be furnished and delivered to BREC/Howell Community Park temporary facility location at 5511 Winbourne Ave, Baton Rouge, LA 70805. NON-Mandatory Pre-Bid Conference & Job Site Visit: When: 03/07/17 Time: 10:00 A.M. Location: 5511 Winbourne Avenue, Baton Rouge, LA 70805
03/22/2017 04:00 PM UTC
SB 1695 - Independence Park Volunteer Building
Construction of an 1,190 s.f. building and site improvements.
03/09/2017 08:00 PM UTC
SB-1693 Hooper Road Park Rec Center Roof Repair/Replacement
Demolition & removal of existing roof, Installation of new standing seam metal roofing, flashing, ridge vents & insulation
02/07/2017 08:00 PM UTC
SB 1694 North Sherwood Forest Warehouse Roof Repair/Replacement
Provide all labor and materials for the removal and replacement of roof system on the second bay of the overall facility with a new 30 year multi-ply modified bitumen roof system as shown on the drawings and described in these Specifications.
02/07/2017 08:00 PM UTC
SB 1692 - Webb GC Mini Range and 1st Hole Improvements Rebid
Relocating and re-grading the tees on Hole #1, removal and installation of concrete cart path, new concrete cart parking, minor drainage improvements, and the construction of a netting cage on concrete pad (“mini-range” practice field).
01/31/2017 08:00 PM UTC
SB 1690 RE-BID SWIMMING POOL CHEMICALS FOR BREC SITES
Swimming Pool Chemicals for Delivery to BREC Sites per Bid Specifications
12/19/2016 04:30 PM UTC
SB 1689 OLYMPIA STADIUM RESTORATION
Project Description:  Repair of stadium concrete seating structure including removal of loose, broken, or weakened concrete, patching voids, repair and/or replacement of exposed rebar, addition of support structures in areas, sealing of cracks and replacement of joint sealers.  Environmental mitigation of lead-based paint on structural steel. Prime, base coat and finish coat painting of structural steel. Modification of concrete block walls to provide access to structural steel at base of frames.
12/15/2016 08:00 PM UTC
SB 1688 HOOPER SITE IMPROVEMENTS
THE IMPROVEMENTS TO HOOPER NEIGHBORHOOD PARK INCLUDE: SITE WORK, GRADING, DRAINAGE, CONCRETE SIDEWALKS, FENCING, SITE FURNISHINGS, BASKETBALL COURT CONVERSION, PLAYGROUND SUBSURFACE DRAINAGE AND ENGINEERED WOOD FIBER SAFETY SURFACING.
12/14/2016 08:00 PM UTC
SB #1686 -WEBB PARK GOLF COURSE MINI RANGE & HOLE 1 IMPROVEMENTSon
Relocating and re-shaping the tees on Hole #1 at Webb Park Golf Course, installation of new cart path and cart parking, and the construction of a “mini range” practice facility.
11/22/2016 08:00 PM UTC
SB 1687 SWIMMING POOL CHEMICALS FOR BREC SITES
Swimming Pool Chemicals for Delivery to BREC Sites per Bid Specifications
11/21/2016 04:30 PM UTC
161 - 170 of 320 Solicitations
1 2 … 13 14 15 17 19 20 21 … 31 32