General Info

Business Logo

BREC

6201 Florida Blvd, Baton Rouge, LA 70806-4467
(225) 272-9200 x522


Standard Documents

Name * Description
bidexpressinstructions.pdf (285 KB)
1 Document

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
SB 1689 OLYMPIA STADIUM RESTORATION
Project Description:  Repair of stadium concrete seating structure including removal of loose, broken, or weakened concrete, patching voids, repair and/or replacement of exposed rebar, addition of support structures in areas, sealing of cracks and replacement of joint sealers.  Environmental mitigation of lead-based paint on structural steel. Prime, base coat and finish coat painting of structural steel. Modification of concrete block walls to provide access to structural steel at base of frames.
12/15/2016 08:00 PM UTC
SB 1688 HOOPER SITE IMPROVEMENTS
THE IMPROVEMENTS TO HOOPER NEIGHBORHOOD PARK INCLUDE: SITE WORK, GRADING, DRAINAGE, CONCRETE SIDEWALKS, FENCING, SITE FURNISHINGS, BASKETBALL COURT CONVERSION, PLAYGROUND SUBSURFACE DRAINAGE AND ENGINEERED WOOD FIBER SAFETY SURFACING.
12/14/2016 08:00 PM UTC
SB #1686 -WEBB PARK GOLF COURSE MINI RANGE & HOLE 1 IMPROVEMENTSon
Relocating and re-shaping the tees on Hole #1 at Webb Park Golf Course, installation of new cart path and cart parking, and the construction of a “mini range” practice facility.
11/22/2016 08:00 PM UTC
SB 1687 SWIMMING POOL CHEMICALS FOR BREC SITES
Swimming Pool Chemicals for Delivery to BREC Sites per Bid Specifications
11/21/2016 04:30 PM UTC
SB 1683 INDEPENDENCE PARK PLAYGROUND
This new play area will include concrete sidewalks, site work, grading, drainage, playground equipment, engineered wood fiber safety surfacing, pavilions, and site furnishings.
10/20/2016 07:00 PM UTC
SB 1684 - Beaver Creek Golf Course Pavilion and Outdoor Tournament area
To remove an existing pavilion and install a new larger pavilion and associated paving.
10/20/2016 06:00 PM UTC
SB 1679 - GREENWOOD COMMUNITY PARK PEDESTRIAN BRIDGE
Construction of bridge footings, installation of 8-foot wide by 65-foot long prefabricated bridge, and placement of channel protection.
09/15/2016 07:00 PM UTC
SB# 1681 INDEPENDENCE PARK BOTANICAL GARDEN PHASE 1
The project is a first phase of a master plan for improvements to the Botanical Gardens at Independence Community Park. The major components of the project are a walkway system connecting the new Goodwood Library to the Gardens, a formal parterre garden, landscaping, irrigation, site furnishings, lighting, unit paving, a fountain, and garden structures.
09/13/2016 07:00 PM UTC
SB 1678 SANTA MARIA PLAYGROUND
This new playground will include concrete sidewalks, site work, grading, drainage, playground equipment, engineered wood fiber safety surfacing, and site furnishings.
09/13/2016 07:00 PM UTC
SB 1676 Farr Park Sewer Improvements
The project consists of the demolition and replacement of a new submersible grinder pump station complete with a discharge force main.
09/08/2016 07:00 PM UTC
151 - 160 of 304 Solicitations
1 2 12 13 14 16 18 19 20 30 31