General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9651PlanHolders04242025.pdf (103 KB)
Contract 9651 - Madison Public Market - Exterior Signage
2 Documents

Upcoming Solicitations

Number Deadline
8792 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2025
This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work.
05/08/2025 07:00 PM UTC
9651 - Madison Public Market - Exterior Signage
This contract is for the fabrication, delivery, and installation of exterior signage for the future Madison Public Market located at 202 N First St., Madison, WI 53704. The work includes, but is not limited to, electrical hookup and testing of signage elements, with electrical rough-in already provided near each sign location. This contract includes a potential for (1) Additive Alternate labeled as ITEM 90001.
05/22/2025 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
9535 - CIPP UV Lining Rehabilitation of Sewers Phase 2 - 2024
The work includes the trenchless rehabilitation of approximately 5,382 linear feet of sanitary sewer pipelines ranging in size from 8” to 15” diameter using an Ultraviolet light cure CIPP system.
11/21/2024 08:00 PM UTC
9517 - Pheasant Branch Greenway Enhancement
Work shall include, but is not limited to; clearing & grubbing, tree removal, channel excavation and riprap placement, base course, installation of box culvert crossings, installation of storm pipe and structures, installation of water main and appurtenances, installation of sanitary sewer main and structures, installation of pedestrian bridge, grading, road reconstruction, pavement marking and restoration including the removal of invasive species, seeding and planting operations, and maintenance of plantings. This project has received FEMA funding and is subject to all federal, state and local regulations and requirements as provided in these contract documents.
11/14/2024 08:00 PM UTC
9605 - Prairie Hills Detention Basin Improvements
The work includes but is not limited to removing the existing sediment buildup from the bottom of the Prairie Hills Detention Basin and grading the pond closer to original design elevations. Along with removing sediment, constructing a maintenance access drive off of Dorchester Way, constructing four 6’x6’ Storm Access Structures with 6’ sumps connected to existing stormsewer, removal of two inlets, D-2 clearing and grubbing, grading, street restoration and site restoration.
11/14/2024 08:00 PM UTC
9572 - N Lake Street Boat Ramp
This contract and associated plan set describes the work necessary to install a new 26’x20’ concrete slab at the existing boat launch located within the right-of-way of North Lake Street located in Madison, Wisconsin. This works includes but is not limited to excavation cut, placing concrete, and lake control.
11/07/2024 08:00 PM UTC
9582 - LED Street Lights
This project generally consists of removal and replacement of old streetlight fixtures with new LED fixtures Citywide.
10/17/2024 07:00 PM UTC
8770 - West Towne Path - Phase 2A
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, block retaining wall, lighting conduit and base/poles, pavement markings, and ground restoration.
09/26/2024 07:00 PM UTC
9486 - Commercial Avenue Sanitary Sewer Reconstruction
The work under this contract shall include, but is not limited to, installation of sanitary sewer main (open trench and bore & jack methods), lateral reconnections, and asphalt pavement patching.
09/12/2024 07:00 PM UTC
9536 - CIPP Lining Rehabilitation - Blair Street Sanitary Sewer Siphon & CIPP Lining Rehabilitation - North Mills Street Sanitary Sewer Siphon
The work includes the trenchless rehabilitation of an approximately 79 feet linear feet of 8” ductile iron sanitary sewer mains using thermal cure CIPP methods (two mains total).
09/12/2024 07:00 PM UTC
8767 - Door Creek Park Connection
The work under this contract shall include, but is not limited to, installing new conduit and fiber optic between an existing splice point at the intersection of Milwaukee Street and Sprecher Road and a new shelter being built at Door Creek Park.
08/29/2024 07:00 PM UTC
9561 - S. Paterson Street Sanitary Sewer Replacement Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of sanitary sewer main, lateral reconnection, bore and jacking of casing pipe, and asphalt pavement patching.
08/29/2024 07:00 PM UTC
31 - 40 of 1041 Solicitations
1 2 4 6 7 8 9 104 105