General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9651PlanHolders04242025.pdf (103 KB)
Contract 9651 - Madison Public Market - Exterior Signage
2 Documents

Upcoming Solicitations

Number Deadline
8792 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2025
This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work.
05/08/2025 07:00 PM UTC
9651 - Madison Public Market - Exterior Signage
This contract is for the fabrication, delivery, and installation of exterior signage for the future Madison Public Market located at 202 N First St., Madison, WI 53704. The work includes, but is not limited to, electrical hookup and testing of signage elements, with electrical rough-in already provided near each sign location. This contract includes a potential for (1) Additive Alternate labeled as ITEM 90001.
05/22/2025 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
9529 - Parks Sun Shelter Installations
This contract consists of installation of one (1) new prefabricated park sun shelter, concrete footings, concrete slab base and associated sitework at (3) park locations: -Kestrel Park (9702 Grey Kestrel Dr, Verona, WI 53593) -North Star Park (502 North Star Dr, Madison, WI 53718) -Sycamore Park (830 Jana Ln, Madison, WI 53704)
02/13/2025 08:00 PM UTC
8766 - N Franklin and Lynn Terrace Assessment District - 2025
The work under this contract shall include, but is not limited to, replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, reconnection of water services, and replacement and installation of storm sewer pipes and structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
02/13/2025 08:00 PM UTC
8790 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 10) - 2025
The work includes horizontal sawcutting/grinding repair work primarily throughout the 10th Aldermanic District.
02/13/2025 08:00 PM UTC
9621 - 2025 Semi-Permanent Epoxy Pavement Markings
Furnishing and application or removal of epoxy pavement markings at locations throughout the City of Madison and per City of Madison Standard Pavement Marking Details or as shown on the plans provided by the City of Madison.
02/13/2025 08:00 PM UTC
8789 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 20) by the Common Council
This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the contractor), and associated work
02/13/2025 08:00 PM UTC
9616 - Truax Apartments PV - Roofing Alterations
Work includes installation of roof anchors for solar racking attachment.
01/30/2025 08:00 PM UTC
North Shore Drive Path and East Madison Bikeways: Safe Streets
The work under this contract shall include but is not limited storm sewer pipe and structure installation, to excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, and driveway aprons, lighting conduit and bases/poles, pavement markings, ground restoration, erosion control installation and removal, and work zone traffic control signs and devices.
01/30/2025 08:00 PM UTC
9550 - Yahara Hills Golf Course Pump Station and Irrigation Improvements
The work for this contract is to decommission the existing irrigation pump station, remove the pump motors, and cover the existing wet well. The contractor will provide and install a complete Watertronics irrigation pump station, including the equipment pad, wet well, intake flume/screen, and a prefabricated pump station enclosure powered by the existing transformer. Additionally, the irrigation system will be adjusted to align with revised golf course boundaries, with components cut, capped, sealed, and added/adjusted as indicated on the drawings. The contractor is also responsible for surveying all property boundaries.
01/16/2025 08:00 PM UTC
9583 - CCB Remodel - DCR 104 & 108A
The work shall include but not be limited to all of the following: • Demolition and construction. • Installation of finish materials. • Installation of electrical, lighting and heating equipment and materials. • Installation of built-in cabinetry. • Cooperation with other contractors doing work for the City of Madison or Dane County within the contract work spaces.
01/16/2025 08:00 PM UTC
8759 - Starker Avenue Resurfacing Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, water main and services, and replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter replacement, driveway aprons replacement, sidewalk replacement, asphalt pavement, pavement marking and signing.
11/21/2024 08:00 PM UTC
21 - 30 of 1041 Solicitations
1 3 5 6 7 8 9 104 105