General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 63-1-2026
The general work requested is: THE CONSTRUCTION OF; 4” ASPHALT ROADWAY RECONSTRUCT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS, 7” CONCRETE DRIVEWAY, CRUSHED STONE BASE, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, CONCRETE TRAFFIC ISLAND, PINNED-ON TRAFFIC CIRCLES/TRAFFIC ISLAND AND SPEED HUMPS; EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, MANHOLE\INLET ADJUSTMENTS, ETC.; Located at: ST211220231 W. Arizona St. – S. 53rd St. to S. 55th St. ST211250131 S. 53rd St. – W. Oklahoma Ave. to W. Montana St. ST211250137 W. Cleveland Ave. – S. 42rd St. to S. 68th St.
09/28/2026 03:30 PM UTC
OFFICIAL NOTICE 87-1-2026
PROJECT NO.1: COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING E. Erie St. – 150’+/- NW. of N. Broadway to N. Broadway E. Menomonee St. – N. Broadway to N. Jefferson St.
09/30/2026 03:30 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 33-1-2017
WATER MAIN RELAYS at the following locations: E. Locust St. (WT410170605), N. Farwell Av. to N. Downer Av. (32 working days); E. Kane Pl. (WT410170628), N. Farwell Av. to N. Prospect Av. (18 working days); W. Glendale Av. (WT410170637), N. Parkway Av. to N. Green Bay Av. (11 working days); N. Franklin Pl. (WT410150653), N. Prospect Av. to E. Ogden Av. (23 working days); N. Summit Av. (WT410160663), E. Kane Pl. to E. Lafayette Pl. (20 working days); E. Kane Pl. (WT410160664), N. Prospect Av. to N. Summit Av. (11 working days) (Note: Contractor to furnish and install approximately 3,825 lin. ft. of 16”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/10/2017 04:30 PM UTC
OFFICIAL NOTICE 34-1-2017
WP-317: PIPE GALLERY ROOF REPLACEMENTS LOCATED AT LINNWOOD WATER TREATMENT PLANT, 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
03/10/2017 04:30 PM UTC
OFFICIAL NOTICE 36-1-2017
City-Wide Removal of Weeds and Tall Grasses, Sidewalk Snow and Ice and Right-of-Way Encroachments from Private Property in Violation of City Ordinance 80-17, 116-8, and 116-55.
03/09/2017 04:30 PM UTC
OFFICIAL NOTICE 19-1-2017
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216160110 - Handicap Ramp Work to Meet ADA Requirements at Various Locations on the 2017 High Impact Paving Projects
03/08/2017 04:30 PM UTC
OFFICIAL NOTICE 17-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216170107) - Asphalt Overlays located at: N. 27th St. - W. Center St. to W. Townsend St., W. Atkinson Ave. - N. 27th St. to N. 32nd St., W. Cameron Ave. - N. 32nd St. to N. 35th St., W. Keefe Ave. - N. Sherman Blvd. to N. 51st St., E. Kenwood Blvd. - N. Lake Dr. to N. Downer Ave., N. Shepard Ave. - E. Kenwood. Blvd. to E. Hartford Ave., W. Wells St. - N. 16th St. to N. 27th St.
03/07/2017 04:30 PM UTC
OFFICIAL NOTICE 17-2-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, (ST216171107) - Asphalt Overlays located at: N. 27th St. - W. Center St. to W. Townsend St., W. Atkinson Ave. - N. 27th St. to N. 32nd St., W. Cameron Ave. - N. 32nd St. to N. 35th St., W. Keefe Ave. - N. Sherman Blvd. to N. 51st St., E. Kenwood Blvd. - N. Lake Dr. to N. Downer Ave., N. Shepard Ave. - E. Kenwood. Blvd. to E. Hartford Ave., W. Wells St. - N. 16th St. to N. 27th St.
03/07/2017 04:30 PM UTC
OFFICIAL NOTICE 44-1-2017
WATER MAIN RELAYS in the following locations: S. Melinda St. (WT410170655), W. Birchwood Ave. to W. Parnell Ave. (10 working days); S. 53rd St. (WT410170662), W. Wilbur Ave. to W. Howard Ave. (36 working days); S. 25th Ct. (WT410170674), W. Henry Ave. to 210’ South of W. Henry Ave. (10 working days); S. 82nd St. (WT410170676), W. Warnimont Ave. to W. Wilbur Ave. (26 working days); S. 3rd St. (WT410160685), 205’ North of W. Walker St. to W. Walker St. (17 working days); W. Walker St. (WT410160686), S. 2nd St. to S. 3rd St. (23 working days) (Note: Contractor to furnish and install approx. 3004 lin. ft. of 8” and 6” DI pipe. City to furnish miscellaneous materials as shown on plans and proposal form.).
03/06/2017 04:30 PM UTC
OFFICIAL NOTICE 12-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216170102) - Asphalt Overlays located at: S. 20th St. - W. Ramsey Ave. to W. Grange Ave., S. Layton Bld. - W. National Ave. to W. Evergreen Ln., W. Lakefield Dr. - W. Morgan Ave. to S. 35th St., W. Windlake Ave. - S. 7th St. to S. 16th St.
03/03/2017 04:30 PM UTC
OFFICIAL NOTICE 12-2-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, (ST216171102) - Asphalt Overlays located at: S. 20th St. - W. Ramsey Ave. to W. Grange Ave., S. Layton Bld. - W. National Ave. to W. Evergreen Ln., W. Lakefield Dr. - W. Morgan Ave. to S. 35th St., W. Windlake Ave. - S. 7th St. to S. 16th St.
03/03/2017 04:30 PM UTC
OFFICIAL NOTICE 35-1-2017
2017 BIO-RETENTION FACILITY MAINTENANCE - NORTH
03/02/2017 04:30 PM UTC
1091 - 1100 of 1609 Solicitations
1 2 106 107 108 110 112 113 114 160 161