General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 31-1-2026
The general work requested is: THE INSTALLATION OF NON-INTRUSIVE DETECTION CAMERAS AT EXISTING SIGNALIZED INTERSECTIONS. Non-Intrusive Detection Grant 4 – ST320233401 Located at: 15 INTERSECTIONS, NORTH SIDE IN THE CITY OF MILWAUKEE (Wisconsin Department of Transportation ID No. 2984-29-94)
05/27/2026 03:30 PM UTC
OFFICIAL NOTICE 57-1-2026
200 LEAD SERVICE LINE REPLACEMENTS
05/29/2026 03:30 PM UTC
OFFICIAL NOTICE 57-2-2026
200 LEAD SERVICE LINE REPLACEMENTS
05/29/2026 03:30 PM UTC
OFFICIAL NOTICE 57-3-2026
200 LEAD SERVICE LINE REPLACEMENTS
05/29/2026 03:30 PM UTC
OFFICIAL NOTICE 61-1-2026
27th Street Viaduct Expansion Joint Replacement
06/01/2026 03:30 PM UTC
OFFICIAL NOTICE 62-1-2026
1000 LEAD SERVICE LINE REPLACEMENTS - PRIORITIZATION PROGRAM
06/03/2026 03:30 PM UTC
OFFICIAL NOTICE 62-2-2026
750 LEAD SERVICE LINE REPLACEMENTS - PRIORITIZATION PROGRAM
06/03/2026 03:30 PM UTC
OFFICIAL NOTICE 56-1-2026
46TH AND STATE STREET – RETAINING WALL REPLACEMENT
06/10/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
06/23/2026 03:30 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 14-2-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, (ST216171104) - Asphalt Overlays located at: E. Chicago St. - N. Jackson St. to N. Milwaukee St., E. Chicago St. - N. Milwaukee St. to W. Water St., N. Harbor St. - E. Summerfest Pl. to s/o E. Chicago St., S. Kinnickinnic Ave - W. Lincoln Ave. to W. Lapham St., N. Water St. - E. Kilbourn Ave. to N. Van Buren St.
03/01/2017 04:30 PM UTC
OFFICIAL NOTICE 32-1-2017
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: North Forestry District: Area approximately bounded by W Capitol Drive and north City Limits.
02/28/2017 04:30 PM UTC
OFFICIAL NOTICE 32-2-2017
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Central Forestry District: Area approximately bounded by W Capitol Drive and W I-94.
02/28/2017 04:30 PM UTC
OFFICIAL NOTICE 32-3-2017
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: South Forestry District: Area approximately bounded by W I-94 and south City Limits.
02/28/2017 04:30 PM UTC
OFFICIAL NOTICE 7-1-2017
COMBINED AND STORM SEWER MAIN RELAY in: Located at: S. 60th St. – W. Morgan Ave. to W. Forest Home Ave. W. Windlake Ave. – W. Burnham St. to S. 10th St.
02/27/2017 04:30 PM UTC
OFFICIAL NOTICE 7-2-2017
COMBINED SEWER MAIN LINING, AND MANHOLE REPAIR & LINING in: N. 6th St. – W. Highland Ave. to W. Juneau Ave.; N. 20th St. – W. Vliet St. to 220'+/- N. of W. Vliet St.; W. Lloyd St. (Ext'd) – W. Fond Du Lac Ave. to N. 20th St.; W. State St. – N. James Lovell St. to N. 8th St.; W. Walnut St. – N. Dr. Martin Luther King Dr. to N. 6th St.
02/27/2017 04:30 PM UTC
OFFICIAL NOTICE 7-3-2017
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING, AND MANHOLE REPAIR & LINING in: Located at: N. 2nd St. – 295’ S. of W. Wright St. to 295’ N of W. Clarke St. W. Meinecke Ave. – N. 1st St. to N. Dr. Martin Luther King Jr. Dr. W. Wright St. – N. 1st St. to N. 2nd St. **Attendance at a Pre-Bid meeting on Friday, February 17, 2017 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project.
02/27/2017 04:30 PM UTC
OFFICIAL NOTICE 7-4-2017
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING, AND MANHOLE REPAIR & LINING in: Alley East of N. Water St. - E. Chicago St. to 220' +/- North of E. Chicago St., E. Michigan St. - N. Jackson St. to N. Van Buren St., N. Van Buren St. - E. Wisconsin Ave. to Pt. South of E. Michigan St.
02/27/2017 04:30 PM UTC
OFFICIAL NOTICE 6-1-2017
SANITARY BUILDING SEWER (LATERAL) LINING AND REPAIR IN: AREA BOUNDED BY WEST LAYTON AVENUE TO WEST EDGERTON AVENUE FROM SOUTH 20TH STREET TO SOUTH 27TH STREET **Attendance at a Pre-Bid meeting on Monday, February 20, 2017 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project. The Contractor must submit all required pre-qualification product, manufacturer, and installer documents to the City of Milwaukee at the following address: 841 North Broadway, Milwaukee WI 53202, ATTN: Mr. Zafar Yousuf, by no later than Monday February 20, 2017.
02/24/2017 04:30 PM UTC
OFFICIAL NOTICE 1-1-2017
Install skid-resistant, solid surface plating on the North Emmber Lane and North Plankinton Avenue open grate lift bridges over the Menomonee River.
02/23/2017 04:30 PM UTC
1071 - 1080 of 1577 Solicitations
1 2 104 105 106 108 110 111 112 157 158