General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 31-1-2026
The general work requested is: THE INSTALLATION OF NON-INTRUSIVE DETECTION CAMERAS AT EXISTING SIGNALIZED INTERSECTIONS. Non-Intrusive Detection Grant 4 – ST320233401 Located at: 15 INTERSECTIONS, NORTH SIDE IN THE CITY OF MILWAUKEE (Wisconsin Department of Transportation ID No. 2984-29-94)
05/27/2026 03:30 PM UTC
OFFICIAL NOTICE 57-1-2026
200 LEAD SERVICE LINE REPLACEMENTS
05/29/2026 03:30 PM UTC
OFFICIAL NOTICE 57-2-2026
200 LEAD SERVICE LINE REPLACEMENTS
05/29/2026 03:30 PM UTC
OFFICIAL NOTICE 57-3-2026
200 LEAD SERVICE LINE REPLACEMENTS
05/29/2026 03:30 PM UTC
OFFICIAL NOTICE 61-1-2026
27th Street Viaduct Expansion Joint Replacement
06/01/2026 03:30 PM UTC
OFFICIAL NOTICE 62-1-2026
1000 LEAD SERVICE LINE REPLACEMENTS - PRIORITIZATION PROGRAM
06/03/2026 03:30 PM UTC
OFFICIAL NOTICE 62-2-2026
750 LEAD SERVICE LINE REPLACEMENTS - PRIORITIZATION PROGRAM
06/03/2026 03:30 PM UTC
OFFICIAL NOTICE 56-1-2026
46TH AND STATE STREET – RETAINING WALL REPLACEMENT
06/10/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
06/23/2026 03:30 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 67-1-2016
COMBINED AND STORM SEWER MAINS RELAY & SANITARY AND COMBINED SEWER LINING, REPAIR AND MANHOLE REPAIR & LINING in: N. 19th St. – W. McKinley Ave. to W. Vliet St. N. 21st St. – W. Auer Ave. to 265’± N. of W. Keefe Ave. N. 46th St. – W. Martin Dr. to W. Juneau Ave. N. 49th St. – W. Vliet St. to W. Galena Ave. W. Townsend St. – N. 20th St. to N. 22nd St. W. Vliet St. – N. 13th St. to N. 14th St. W. Vliet St. – N. 49th St. to N. 50th St.
07/27/2016 03:30 PM UTC
OFFICIAL NOTICE 67-2-2016
COMBINED SEWER MAINS RELAY AND COMBINED SEWER LINING, MANHOLE REPAIR AND LINING in: N. 6th St. – W. Vine St. to W. Brown St.; N. 7th St. – W. Cherry St. to W. Galena St.; N. 8th St. (Easement) – W. Cherry St. to W. Somers St. (Easement); N. 10th St. & Easement north of N. 10th St. (Ext’d) – W. Galena St. (Ext’d) to south of W. Vine St.; N. 12th St. – 215’ ± south of W. Kilbourn Ave. to W. Kilbourn Ave.; W. Somers St. – N. 7th St. to N. 10th St.; W. Vine St. – N. 3rd St. to N 7th St.
07/27/2016 03:30 PM UTC
OFFICAL NOTICE 89-1-2016
WATER MAIN RELAYS, located at the following locations: Water Main Relays – E. Denton Ave. (WT410160722), S. Barland Ave. to S. Lipton Ave. (37 working days); E. Denton Ave. (WT410160723), S. McCarty Ave. to S. Packard Ave. (11 working days).
07/26/2016 03:30 PM UTC
OFFICIAL NOTICE 84-1-2016
CONSTRUCTION OF 8” CONCRETE PAVEMENT, 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, CONCRETE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST212040117) Alley Bounded By - W. Scott St., W. Washington St., S. 7th St., & S. 8th St. (ST212160112) Alley Bounded By - W. Adler St., W. Main St., S. 72nd St., & S. 73rd St. (ST211141153) The Intersection of W. Pierce St. @ S. 37th St. (Pedestrian Crossing) (Also ST214160102)
07/25/2016 03:30 PM UTC
OFFICIAL NOTICE 92-1-2016
MILWAUKEE FIRE DEPARTMENT ENGINE HOUSE #2 - HEADQUARTERS 711 WEST WELLS STREET MILWAUKEE WI
07/22/2016 03:30 PM UTC
OFFICIAL NOTICE 73-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 8” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC., located at: (ST211150172) - W. Douglas Ave. - N. 55th St. to N. 60th St. (ST211150171) - N. 55th St. - W. Florist Ave. to a pt. 190' N of W. Douglas Ave.
07/21/2016 03:30 PM UTC
OFFICIAL NOTICE 68-1-2016
WP-307: REPLACEMENT OF MOTOR CONTROL CENTER NO. 4 LOCATED AT 3000 N LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
07/20/2016 03:30 PM UTC
OFFICAIL NOTICE 088-1-2016
CONSTRUCTION OF BIORETENTION FACILITIES AND SITE WORK INCLUDING CONCRETE CURB AND GUTTER, SITE PLANTINGS, SEEDING, ETC, NORTH 107TH STREET GREEN STREET PROJECT: LOCATED AT NORTH 107TH STREET BETWEEN WEST GOOD HOPE ROAD AND WEST BROWN DEER ROAD
07/14/2016 03:30 PM UTC
OFFICIAL NOTICE 76-1-2016
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SEALING PAVEMENT JOINTS AND CRACKS, CONCRETE REMOVALS, AND SEWER WORK, ETC., located at (ST211150114) N. 54th Blvd. - W. Keefe Ave. to W. Melvina St. (ST211150184) W. Walker St. - S. 2nd St. to S. 3rd St.
07/12/2016 03:30 PM UTC
OFFICIAL NOTICE 85-1-2016
WATER MAIN RELAYS & HYDRANT ALTERATIONS – W. Tallmadge Pl. (N. 73rd St) (WT410160645), 500’ S/O N. Prentiss St. to N. Prentiss St. (14 Working Days); W. Sheridan Ave. (WT410160646), N. 69th St. to N. 76th St. (56 Working Days); N. Prentiss St. (WT410160647), W. Tallmadge Pl. to W. Sheridan Ave. (16 Working Days); N. 74th St. (WT410160648), W. Custer Ave. to W. Tallmadge Pl. (19 Working Days); W. Elm St. (WT410160010), N. Teutonia Ave. to 1600’ W/O N. Teutonia Ave. (6 Working Days).
07/11/2016 03:30 PM UTC
1121 - 1130 of 1577 Solicitations
1 2 109 110 111 113 115 116 117 157 158