We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 44-1-2026
WATER MAIN RELAYS Located at the following locations: W. Mangold Av. (Wt410220705), S. 18th St. TO S. 20th St. (16 Working Days); S 19th Ct. (Wt410220706), 240’N/O W. Mangold Av. To W. Mangold Av. (6 Working Days); S. 18th St. (Wt410220707), W. Ramsey Av. TO W. Mangold Av. (25 Working Days); S. 19th St. (Wt410220708), W. Henry Av. TO W. Kimberly Av. (13 Working Days); W. Grantosa Dr. (N/S) (Wt410250642), W. Courtland Av. TO W. Butter Pl. (20 Working Days); W. Palmetto Av. (Wt410250643), N. 87th St. TO S. 92nd St. (30 Working Days); W. Palmetto Ct. (Wt410250644), 170' SE/O W. Palmetto Av. TO W. Palmetto Av. (5 Working Days); N. 85th St. (Wt410250645), W. Arden Pl. TO W. Glendale Av. (7 Working Days); W. Ruby Av. (Wt410250646), N. 84th St. TO N. 85th St. (6 Working Days); N. 85th St. (Wt410250647), W. Congress St. TO W. Lawrence Av. (6 Working Days); W. Congress St. (Wt410250648), N. 80th St. TO N. 84th St. (28 Working Days); W. Olive St. (Wt410250653), N. 88th St. TO N. 89th St. (6 Working Days); N. 89th St. (Wt410250654), W. Hope Av. TO W. Olive St. (5 Working Days); N. 89th St./W. Hope Av. (Wt410250655), W. Fiebrantz Av. TO N. 91st St. (16 Working Days); (Note: Contractor to furnish and install approximately 11,140.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/21/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 3-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160102) - N. 51st St. - W. Center St. to W. Burleigh St., N. 85th St.-W. Capitol Dr. to W. Olive St., N. 86th St.-W. Capitol Dr. to W. Fiebrantz Ave., N. 87th Ct. - W. Fiebrantz Ave. to pt. N/o W. Fiebrantz Ave., N. 88th St. - W. Fiebrantz Ave. to W. Olive St., N. 92nd St. - W. Lisbon Ave. to W. Capitol Dr., N. Colgate Cir. - W. Fiebrantz Ave. to N. 88th St., W. Olive St. - N. 85th St. to N. 89th St., W. Villard Ave. - N. Sherman Blvd. to N. 51st Blvd.
02/25/2016 04:30 PM UTC
OFFICIAL NOTICE 3-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160102) - N. 51st St. - W. Center St. to W. Burleigh St., N. 85th St.-W. Capitol Dr. to W. Olive St., N. 86th St.-W. Capitol Dr. to W. Fiebrantz Ave., N. 87th Ct. - W. Fiebrantz Ave. to pt. N/o W. Fiebrantz Ave., N. 88th St. - W. Fiebrantz Ave. to W. Olive St., N. 92nd St. - W. Lisbon Ave. to W. Capitol Dr., N. Colgate Cir. - W. Fiebrantz Ave. to N. 88th St., W. Olive St. - N. 85th St. to N. 89th St., W. Villard Ave. - N. Sherman Blvd. to N. 51st Blvd.
02/25/2016 04:30 PM UTC
OFFICIAL NOTICE 2-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160101) - N. 60th St. - W. Appleton Ave. to W. Burleigh St., N. 81st St. - W. Calumet Rd. to W. Bradley Rd., N. 84th St. - W. Florist Ave. to W. Mill Rd., N. 87th St. - W. Bradley Rd. to W. Tower Ave., N. 100th St. - South of W. Hampton Ave. to W. Hampton Ave., W. Calumet Rd. - N. 76th St. to N. 91st St., W. Mill Rd. - Hwy 41 (W. Appleton Av.) to City Limits (N. 124th St.)
02/24/2016 04:30 PM UTC
OFFICIAL NOTICE 2-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at: (ST216160101) - N. 60th St. - W. Appleton Ave. to W. Burleigh St., N. 81st St. - W. Calumet Rd. to W. Bradley Rd., N. 84th St. - W. Florist Ave. to W. Mill Rd., N. 87th St. - W. Bradley Rd. to W. Tower Ave., N. 100th St. - South of W. Hampton Ave. to W. Hampton Ave., W. Calumet Rd. - N. 76th St. to N. 91st St., W. Mill Rd. - Hwy 41 (W. Appleton Av.) to City Limits (N. 124th St.)
02/24/2016 04:30 PM UTC
OFFICIAL NOTICE 18-1-2016
COMBINED SEWER MAINS LINING, REPAIR AND MANHOLE REPAIR & LINING in: W. Keefe Ave. (N/S) – N. 17th St. to N. 22nd St & W. Keefe Ave. (S/S) – N. 17th St. to 40’ +/- W. of N. 24th Pl. **Attendance at a Pre-Bid meeting on Tuesday, February 16, 2016 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project. Prequalification documentation is required to be submitted to the Environmental Engineering Section, Room 821, 841 N. Broadway, Milwaukee, WI 53202 prior to the close of business on February 16, 2016.
02/23/2016 04:30 PM UTC
OFFICIAL NOTICE 31-1-2016
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 1: City-Owned Lot Area 1: Area bounded by Capitol Drive, and north City limits
02/22/2016 04:30 PM UTC
OFFICIAL NOTICE 20-1-2016
CONSTRUCTION OF BIORETENTION FACILITIES AND SITE WORK INCLUDING CONCRETE CURB AND GUTTER, SITE PLANTINGS, SEEDING, ETC, located at NORTH TERRACE AVE FROM EAST BELLEVIEW PLACE TO EAST LAFAYETTE PLACE
02/16/2016 04:30 PM UTC
OFFICIAL NOTICE 15-1-2016
WATER MAIN RELAYS at the following locations: W. Beloit Rd. (WT410110660), S. 98th St. to S. 100th St. (22 Working Days); W. Beloit Rd. (S/S) (WT410110661), S. 92nd St. to S. 96th St. (26 Working Days); S. 97th St. (WT410110662), W. Oklahoma Ave. to W. Beloit Rd. (47 Working Days); W. Allerton Ave. (WT410140641), S. 62nd St. to S. 67th St. (37 Working Days); S. 95th St. (WT410140664), W. Beloit Rd. to 600’ S/O W. Beloit Rd. (18 Working Days).
02/03/2016 04:30 PM UTC
OFFICIAL NOTICE 14-1-2016
NORTH POINT WATER TOWER MASONRY REPAIR AND RESTORATION 2288 NORTH LAKE DRIVE MILWAUKEE, WI
02/02/2016 04:30 PM UTC
OFFICIAL NOTICE 11-1-2016
PROJECT NO. 1: COMBINED SEWER MAINS RELAY AND COMBINED AND STORM SEWER LINING AND MANHOLE REPAIR & LINING in: N. 51st St. – W. Lloyd St. to W. Garfield Ave. N. 55th St. – W. Lloyd St. to W. Garfield Ave. W. Fond Du Lac Ave. – W. Armitage Ave. to W. Constance Ave. W. Lloyd St. –N. 48th St. to N. 53rd St. N. Sherman Blvd. – W. Lisbon Ave. to W. North Ave. **Attendance at a Pre-Bid meeting on Friday, January 22, 2016 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project. Prequalification requirements are required to be submitted to the Environmental Engineering Section, Room 821, 841 N. Broadway, Milwaukee, WI 53202 prior to the close of business on January 22, 2016.
01/27/2016 04:30 PM UTC