General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 44-1-2026
WATER MAIN RELAYS Located at the following locations: W. Mangold Av. (Wt410220705), S. 18th St. TO S. 20th St. (16 Working Days); S 19th Ct. (Wt410220706), 240’N/O W. Mangold Av. To W. Mangold Av. (6 Working Days); S. 18th St. (Wt410220707), W. Ramsey Av. TO W. Mangold Av. (25 Working Days); S. 19th St. (Wt410220708), W. Henry Av. TO W. Kimberly Av. (13 Working Days); W. Grantosa Dr. (N/S) (Wt410250642), W. Courtland Av. TO W. Butter Pl. (20 Working Days); W. Palmetto Av. (Wt410250643), N. 87th St. TO S. 92nd St. (30 Working Days); W. Palmetto Ct. (Wt410250644), 170' SE/O W. Palmetto Av. TO W. Palmetto Av. (5 Working Days); N. 85th St. (Wt410250645), W. Arden Pl. TO W. Glendale Av. (7 Working Days); W. Ruby Av. (Wt410250646), N. 84th St. TO N. 85th St. (6 Working Days); N. 85th St. (Wt410250647), W. Congress St. TO W. Lawrence Av. (6 Working Days); W. Congress St. (Wt410250648), N. 80th St. TO N. 84th St. (28 Working Days); W. Olive St. (Wt410250653), N. 88th St. TO N. 89th St. (6 Working Days); N. 89th St. (Wt410250654), W. Hope Av. TO W. Olive St. (5 Working Days); N. 89th St./W. Hope Av. (Wt410250655), W. Fiebrantz Av. TO N. 91st St. (16 Working Days); (Note: Contractor to furnish and install approximately 11,140.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/21/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 4-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC,: (ST216160103) - Asphalt Overlays located at: N. Jefferson St. - E. Erie St. to E. Chicago St. & E. Chicago St. to E. St. Paul Ave., N. Maryland Ave. - E. Hartford Ave. to E. Edgewood Ave., N. Oakland Ave. - E. Park Pl. to E. Edgewood Ave., N. Van Buren St. - E. Kilbourn Ave. to E. Ogden Ave.
03/08/2016 04:30 PM UTC
OFFICIAL NOTICE 5-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC,: (ST216160104) - Asphalt Overlays located at: N. 37th St. - W. Fond Du Lac Ave. to W. Townsend St., W. Center St. - N. 20th St. to N. 27th St., W. Lisbon Ave. / W. Walnut St. - N. 20th St. to N. 31st St., W. Wells St. - N. 27th St. to N. 37th St.
03/07/2016 04:30 PM UTC
OFFICIAL NOTICE 5-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC,: (ST216160104) - Asphalt Overlays located at: N. 37th St. - W. Fond Du Lac Ave. to W. Townsend St., W. Center St. - N. 20th St. to N. 27th St., W. Lisbon Ave. / W. Walnut St. - N. 20th St. to N. 31st St., W. Wells St. - N. 27th St. to N. 37th St.
03/07/2016 04:30 PM UTC
OFFICIAL NOTICE 33-1-2016
WATER MAIN RELAYS at the following locations: N. 80th St. (WT410160620), W. Thurston Ave. to W. Carmen Ave. (18 Working Days); N. 84th St. (WT410160621), W. Carmen Ave. to W. Bobolink Ave. (20 Working Days); W. Custer Ave. (WT410160624), N. 87th St. to N. 91st St. (27 Working Days)
03/04/2016 04:30 PM UTC
OFFICIAL NOTICE 34-1-2016
Boulevard and Greenspace Mowing and Litter Removal. Work on this project shall consist of up to 26 weekly mowing cycles during the growing season on City-owned boulevards and greenspaces City-wide. Boulevard and Greenspace Mowing and Litter Removal shall begin on or about April 1, 2016 and continue to October 15, 2016.
03/03/2016 04:30 PM UTC
OFFICIAL NOTICE 7-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216160106) - Asphalt Overlays located at: N. 51st Blvd. - W. Capitol Dr. to W. Hampton Ave., W. Roosevelt Dr. - N. 36th St. to W. Fond Du Lac Ave.
03/02/2016 04:30 PM UTC
OFFICIAL NOTICE 7-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216160106) - Asphalt Overlays located at: N. 51st Blvd. - W. Capitol Dr. to W. Hampton Ave., W. Roosevelt Dr. - N. 36th St. to W. Fond Du Lac Ave.
03/02/2016 04:30 PM UTC
OFFICIAL NOTICE 16-1-2016
7TH DISTRICT POLICE STATION RTUs REPLACEMENT 3626 WEST FOND DU LAC AVENUE MILWAUKEE WI
03/01/2016 04:30 PM UTC
OFFICIAL NOTICE 6-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160105) - N. 6th St. - W. Walnut St. to W. North Ave., W. Atkinson Ave. - W. Keefe Ave. W. Teutonia Ave., W. Garfield Ave. - N. 7th St. to N. 8th St.
02/26/2016 04:30 PM UTC
OFFICIAL NOTICE 6-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160105) - N. 6th St. - W. Walnut St. to W. North Ave., W. Atkinson Ave. - W. Keefe Ave. W. Teutonia Ave., W. Garfield Ave. - N. 7th St. to N. 8th St.
02/26/2016 04:30 PM UTC
1161 - 1170 of 1554 Solicitations
1 2 113 114 115 117 119 120 121 155 156