General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 44-1-2026
WATER MAIN RELAYS Located at the following locations: W. Mangold Av. (Wt410220705), S. 18th St. TO S. 20th St. (16 Working Days); S 19th Ct. (Wt410220706), 240’N/O W. Mangold Av. To W. Mangold Av. (6 Working Days); S. 18th St. (Wt410220707), W. Ramsey Av. TO W. Mangold Av. (25 Working Days); S. 19th St. (Wt410220708), W. Henry Av. TO W. Kimberly Av. (13 Working Days); W. Grantosa Dr. (N/S) (Wt410250642), W. Courtland Av. TO W. Butter Pl. (20 Working Days); W. Palmetto Av. (Wt410250643), N. 87th St. TO S. 92nd St. (30 Working Days); W. Palmetto Ct. (Wt410250644), 170' SE/O W. Palmetto Av. TO W. Palmetto Av. (5 Working Days); N. 85th St. (Wt410250645), W. Arden Pl. TO W. Glendale Av. (7 Working Days); W. Ruby Av. (Wt410250646), N. 84th St. TO N. 85th St. (6 Working Days); N. 85th St. (Wt410250647), W. Congress St. TO W. Lawrence Av. (6 Working Days); W. Congress St. (Wt410250648), N. 80th St. TO N. 84th St. (28 Working Days); W. Olive St. (Wt410250653), N. 88th St. TO N. 89th St. (6 Working Days); N. 89th St. (Wt410250654), W. Hope Av. TO W. Olive St. (5 Working Days); N. 89th St./W. Hope Av. (Wt410250655), W. Fiebrantz Av. TO N. 91st St. (16 Working Days); (Note: Contractor to furnish and install approximately 11,140.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/21/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 49-1-2016
CONCRETE REPLACEMENT SERVICES VARIOUS SITES MILWAUKEE, WI
04/05/2016 03:30 PM UTC
OFFICIAL NOTICE 40-1-2016
WATER MAIN RELAYS, located at the following locations: Water Main Relays – W. Thurston Ave. (WT410160638), N. 71st St. to N. 72nd St. (16 Working Days); N. 71st St. (WT410160639), W. Thurston Ave. to W. Bobolink Ave. (26 Working Days); N. 63rd St. (WT410160640), W. Bobolink Ave. to W. Florist Ave. (16 Working Days); N. 67th St. (WT410160641), W. Bobolink Ave. to W. Florist Ave. (17 Working Days); N. 65th St. (WT410160642) W. Carmen Ave. to W. Florist Ave. (32 Working Days); N. 62nd St. (410160643), W. Carmen Ave. to W. Bobolink Ave. (17 Working Days); W. Bobolink Ave. (WT410160644), N. 64th St. to N. 65th St. (11 Working Days)
04/01/2016 03:30 PM UTC
OFFICIAL NOTICE 41-1-2016
COMBINED SEWER MAINS RELAY in: E. Chicago St. – N. Milwaukee St. to N. Jackson St. N. Jefferson St. – E. Buffalo St. to E. St. Paul Ave.
03/31/2016 03:30 PM UTC
OFFICIAL NOTICE 27-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” AND 8” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (TD04284001) - W. Medford Ave. - W. Congress St. to N. 68th St. (TID-42)
03/30/2016 03:30 PM UTC
OFFICIAL NOTICE 21-1-2016
This project involves the center lock replacement at the Water Street Bascule Bridge over the Milwaukee River.
03/29/2016 03:30 PM UTC
OFFICIAL NOTICE 12-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (ST211140107) - S. 71st St. - W. Kinnickinnic River Pkwy. to W. Cleveland Ave.
03/28/2016 03:30 PM UTC
OFFICIAL NOTICE 42-1-2016
Stump Grinding, Removal, and Site Restoration in the North District Service Area. North District Service Area: Capital Drive North to City Limits.
03/23/2016 03:30 PM UTC
OFFICIAL NOTICE 42-2-2016
Stump Grinding, Removal, and Site Restoration in the Central District Service Area. Central District Service Area: Interstate I-94 North to Capital Drive.
03/23/2016 03:30 PM UTC
OFFICIAL NOTICE 42-3-2016
Stump Grinding, Removal, and Site Restoration in the South District Service Area. South District Service Area: Interstate I-94 South to City Limits.
03/23/2016 03:30 PM UTC
OFFICIAL NOTICE 23-1-2016
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 7”CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST211120159) - N. Pierce St. - E. Center St. to E. Burleigh St.
03/22/2016 03:30 PM UTC
1141 - 1150 of 1554 Solicitations
1 2 111 112 113 115 117 118 119 155 156