General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 44-1-2026
WATER MAIN RELAYS Located at the following locations: W. Mangold Av. (Wt410220705), S. 18th St. TO S. 20th St. (16 Working Days); S 19th Ct. (Wt410220706), 240’N/O W. Mangold Av. To W. Mangold Av. (6 Working Days); S. 18th St. (Wt410220707), W. Ramsey Av. TO W. Mangold Av. (25 Working Days); S. 19th St. (Wt410220708), W. Henry Av. TO W. Kimberly Av. (13 Working Days); W. Grantosa Dr. (N/S) (Wt410250642), W. Courtland Av. TO W. Butter Pl. (20 Working Days); W. Palmetto Av. (Wt410250643), N. 87th St. TO S. 92nd St. (30 Working Days); W. Palmetto Ct. (Wt410250644), 170' SE/O W. Palmetto Av. TO W. Palmetto Av. (5 Working Days); N. 85th St. (Wt410250645), W. Arden Pl. TO W. Glendale Av. (7 Working Days); W. Ruby Av. (Wt410250646), N. 84th St. TO N. 85th St. (6 Working Days); N. 85th St. (Wt410250647), W. Congress St. TO W. Lawrence Av. (6 Working Days); W. Congress St. (Wt410250648), N. 80th St. TO N. 84th St. (28 Working Days); W. Olive St. (Wt410250653), N. 88th St. TO N. 89th St. (6 Working Days); N. 89th St. (Wt410250654), W. Hope Av. TO W. Olive St. (5 Working Days); N. 89th St./W. Hope Av. (Wt410250655), W. Fiebrantz Av. TO N. 91st St. (16 Working Days); (Note: Contractor to furnish and install approximately 11,140.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/21/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 120-2-2014
COMBINED SEWER MAINS RELAY AND LINING, AND MANHOLE LINING AND REPAIR IN: E. Auer Ave. – 25’+/- West of N. Booth St. to N. Humboldt Blvd. (various locations), N. Bremen St. – E. North Ave. to E. Meinecke Ave., and E. Meinecke Ave. – N. Fratney St. to N. Weil St.
09/30/2014 03:30 PM UTC
OFFICIAL NOTICE 107-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SODDING, ETC. located at (ST211060141) S. Burrell St. – A point 275’+/- South of E. Ohio Av. to E. Ohio Av.; (ST211140159) S. Kinnickinnic Av. southeast of S. California St. (Sijan Playfield) (Ped Crossing); (ST211140160) S. 43rd St. at W. Montana St. (Ped Crossing); (ST211140155) E. Rosedale Av. – east of S. Chase Av. (Kinnickinnic Bike Trail bridge over S. Chase Av. ADA access point); (ST211140172) S. 6th St. at W. Hayes Av. (Traffic Calming)
09/29/2014 03:30 PM UTC
OFFICIAL NOTICE 106-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SODDING, ETC. located at (ST211140123) N. 52nd St. – W. Nash St. to W. Capitol Dr.
09/26/2014 03:30 PM UTC
OFFICIAL NOTICE 113-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SODDING, ETC. located at (ST211130183) N. 55th St. – W. Vienna Ave. to W. Melvina St.
09/25/2014 03:30 PM UTC
OFFICIAL NOTICE 120-1-2014
COMBINED SEWER MAINS RELAY IN: S. 31st St. – W. Scott St. to W. Greenfield Ave. and S. 33rd St. – W. Greenfield Ave. to W. Branting Ln.
09/24/2014 03:30 PM UTC
OFFICIAL NOTICE 108-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, ETC. located at (ST211140119) W. Spokane St. – N. 60th St. to N. 64th St.; (ST211140147) N. 91st St. – W. Locust St. to W. Burliegh St.; (ST211140148) W. Florist Ave. – N. 55th St. to N. 60th St.
09/23/2014 03:30 PM UTC
OFFICIAL NOTICE 105-1-2014
CONSTRUCTION OF 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC PAVEMENT, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, ETC. located at (ST211140150) E. Erie St. at E. Menomonee St., E. Menomonee St. – N. Broadway to E. Erie St.; (ST211140156) N. Water St. at E. Pearson St. (Marsupial bridge area access); (ST211140158) W. Clybourn St. – a point east of N. 16th St. to N. 16th St. (median)
09/22/2014 03:30 PM UTC
OFFICIAL NOTICE 84-1-2014
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, PAVEMENT REMOVAL, CUTTING, CRUSHED STONE BASE, PERMEABLE PAVERS, ETC. located at (ST212140127) Alley betw W. Hope Ave, W. Marion St., N. 61st St, and N. 62nd St (Permeable alley); (ST212020110) Alley betw W. Appleton Av, W. Congress St, W. Hope Ave, W. Potomac Ave and N. 80th St (N/S Leg) (Permeable alley); (ST212140124) Alley betw W. Hadley St, W. Locust St, N. 81st St and N. 82nd St. (Permeable alley); (ST212140120) Alley betw W. Center St, N. Grant Bl, W. Hadley St and N. Sherman Bl. (Permeable alley)
09/18/2014 03:30 PM UTC
OFFICIAL NOTICE 109-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, 6” POROUS WALK, ETC. located at (ST211140126) N. Pinecrest St. – N. Story Pkwy to N. 49th St. (Permeable Sidewalk)
09/17/2014 03:30 PM UTC
OFFICIAL NOTICE 119-1-2014
COMBINED SEWER MAINS RELAY AND LINING AND MANHOLE LINING AND REPAIR IN: E. Knapp St. - N. Van Buren St. to N. Astor St. & N. Van Buren St. - 100'+/- S. of E. Juneau Ave. to E. Knapp St.
09/16/2014 03:30 PM UTC
1331 - 1340 of 1554 Solicitations
1 2 130 131 132 134 136 137 138 155 156