General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 7-1-2026
PROJECT NO. 1: COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING. S. 12th St. – W. Manitoba St. to W. Oklahoma Ave. W. Manitoba St. – S. 6th St. to S. 12th St.
09/10/2026 03:30 PM UTC
OFFICIAL NOTICE 7-2-2026
PROJECT NO.2: COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING E. Erie St. – 150’+/- NW. of N. Broadway to N. Broadway E. Menomonee St. – N. Broadway to N. Jefferson St.
09/10/2026 03:30 PM UTC
OFFICIAL NOTICE 81-1-2026
Northwest Garage & DPW Field Headquarters – Air Handling Unit Replacement The project involves two different project sites. At the DPW Field Headquarters an existing rooftop unit will be removed and replaced with a new rooftop unit. At the Northwest Garage an existing air handling unit, energy recovery unit, and associated VAV boxes will be removed and replaced with a new rooftop unit, new VAV boxes, and new energy recovery unit. Both locations include controls improvements. There is mechanical, structural, and controls scope (NIC).
09/17/2026 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 39-1-2024
THE REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: RG1515236321A – Street Lighting Improvements/Upgrades @ Various Locations (City Wide)
02/20/2024 04:30 PM UTC
OFFICIAL NOTICE 12-1-2024
The general work requested is: THE CONSTRUCTION OF; 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT AND SIDEWALK, VARIABLE THICKNESS CONCRETE BASE, 5” CONCRETE WALK, ADA HANDICAP CONCRETE RAMPS, VARIABLE CONCRETE DRIVEWAYS, VARIABLE CONCRETE CURB AND GUTTER, CLAY PAVERS, DETECTABLE WARNING FIELD, INSTALLATION OF CONDUIT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE, VARIOUS TRAFFIC CALMING DEVICES, ASSEMBLY/INSTALLATION, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING REMOVAL, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located at: TD11584006 – East Michigan Street - from North Cass Street to North Lincoln Memorial Drive (Including North Lincoln Memorial Drive)
02/16/2024 04:30 PM UTC
OFFICIAL NOTICE 13-1-2024
The general work requested is: THE CONSTRUCTION OF; CONCRETE TRAFFIC ISLAND, 5” CONCRETE WALK, ADA HANDICAP CONCRETE RAMPS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELD, INSTALLATION OF CONDUIT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE ASSEMBLY/INSTALLATION, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING REMOVAL, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located at: TD04984004 – North Van Buren Street - from East Wisconsin Avenue to East Brady Street TD07984004 – North Van Buren Street - from East Wisconsin Avenue to East Brady Street
02/15/2024 04:30 PM UTC
OFFICIAL NOTICE 43-1-2024
Former Northridge Mall Fence Replacement Project
02/14/2024 04:30 PM UTC
OFFICIAL NOTICE 37-1-2024
Remote Bridge Upgrades at Multiple Locations
02/13/2024 04:30 PM UTC
OFFICIAL NOTICE 32-1-2024
2024 SANITARY BYPASS PUMP & SANITARY LIFT STATION INSPECTION AND BYPASS PUMP WET TESTING
02/02/2024 04:30 PM UTC
OFFICIAL NOTICE 31-1-2024
200 Lead Service Line Replacements prior to Paving
02/01/2024 04:30 PM UTC
OFFICIAL NOTICE 14-1-2024
Former Northridge Mall Fence Replacement Project
01/30/2024 04:30 PM UTC
OFFICIAL NOTICE 6-1-2024
WATER MAIN RELAYS & HYDRANT ALTERATIONS, at the following locations: North 52nd St. (WT410180623), W. Custer Av. to W. Silver Spring Dr. (24 working days); W. Sheridan Av. (WT410220615), N. 51st Blvd. to N. 57th St. (31 working days); N. 87th St. (WT410220630), W. Villard Av. to W. Lawn Av. (14 working days); N. 90th St. (WT410220631), W. Villard Av. to W. Rohr Av. (12 working days); N. 75th St. (WT410220661), 350’ S/O N. 75th Ct. to W. Talmadge Pl. (12 working days); N. 75th Ct. (WT410220662), N. 75th St. to 135’ W/O N. 75th St. (5 working days); N. Dousman St. (WT410230605), E. Meinecke Av. to E. Clarke St. (79 working days); E. Potter Av. (WT410230606), E. Russell Av. to S. Kinnickinnic Av. (64 working days); E. Falling Heath Pl. (WT410230618), S. Kinnickinnic Av. to S. Pennsylvania Av. (19 working days); E. Linus St. (WT410230698), S. Kinnickinnic Av. to S. Logan Av. (67 working days); E. Howard Av. (WT410230753), S. Lennox St. (3 working days); W. Forest Home Av. (WT410230754), 184’ SW/O W. Kelly Pl. (3 working days); E. Wells St. (WT410230755), N. Broadway to N. Van Buren St. (3 working days) (Note: Contractor to furnish and install approximately 11,030 lin. ft. of 16”, 12”, 8”, 6” and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/29/2024 04:30 PM UTC
OFFICIAL NOTICE 5-1-2024
WATER MAIN RELAYS, at the following locations: N. 100th St. (WT410220600), W. Capitol Dr. to W. Grantosa Dr. (26 working days); W. Grantosa Dr. (WT410220614), 225’ E/O N. 100th St. to N. 100th St. (6 working days); N. Burbank Av (WT410220621), W. Casper St. to W Green Tree Rd. (10 working days); N. 84th St. (WT410220622), W. Mill Rd. to N. Burbank Av. (51 working days); W. Acacia St. (WT410220623), N. 77th St. to N. 80th St. (19 working days); N. 78th St. (WT410220624), W. Acacia St. to W. Casper St. (21 working days); W. Casper St. (WT410220625), N. 77th St. to N. 78th St. (7 working days); N. 100th St. (WT410220651), W. Nash St. to W. Lisbon Av. (44 working days); N. 98th St. (WT410220652), W. Metcalf Pl. to W. Lisbon Av. (8 working days); N. 85th St. (WT410220673), W. Capitol Dr. to W. Olive St. (26 working days); W. Olive St. (WT410220674), N. 85th St. to N. 88th St. (18 working days); N. 88th St. (WT410220675), N. Colgate Cr. to W. Marion St. (16 working days); N. 83rd St. (WT410220676), W. Capitol Dr. to W. Hope Av. (25 working days); W. Fiebrantz Av. (WT410220677), N. 82nd St. to N. 84th St. (11 working days); N. 20th St. (WT410230001), W. North Av. to N. Hopkins St. (10 working days); . (Note: Contractor to furnish and install approximately 14575 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/25/2024 04:30 PM UTC
311 - 320 of 1606 Solicitations