General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 1-1-2025
Street Lighting LED upgrade CRP AREA B: E/W Juneau Ave. to E/W Oklahoma Ave, Lake Michigan to West City Limit
04/25/2025 03:30 PM UTC
OFFICIAL NOTICE 53-1-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 53-2-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 18-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; ST211220209 – North 30th Street – West Atkinson Avenue to West Hampton Avenue ST211210219 – West Gertrude Drive – West Stark Street to West Grantosa Drive
04/29/2025 03:30 PM UTC
OFFICIAL NOTICE 25-1-2025
SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING N. 34th St. - W. Clybourn St. to 250’ S. of W. Clybourn St. N. 36th St. – W. Michigan St. to W. Wisconsin Ave. N. 59th St. – W. Vine St. to 460’+/- N. of W. Vine St. E. Brown St. – 140’+/- W. of N. Hubbard St. to N. Hubbard St. W. Michigan St. – N. 36th St. to 145’+/- E. of N. 39th St.
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 25-2-2025
2025 SANITARY SEWER MANHOLE INSPECTION
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 39-1-2021
WP‐329: WATER QUALITY MONITORING UPGRADES at the following locations: Florist Pumping Station, 8525 W. Florist Ave., Milwaukee, WI 53225, Lincoln Pumping Station, 3641 W. Lincoln Ave. Milwaukee, WI 53215, Hawley Road Tank, 1235 N. 57th St. Milwaukee, WI 53208 and Greenfield Tank, 8787 W. Waterford Ave, Greenfield, WI 53228.
04/29/2021 03:30 PM UTC
OFFICIAL NOTICE 42-1-2021
WATER MAIN RELAYS, at the following locations: W. Nash St. (WT410210652), N. 82nd St. to N. 87th St. (38 working days); N. 83rd St. (WT410210653), 250’ S/O W. Keefe Av. to W. Keefe Av. (38 working days); N. 85th St. (WT410210654), W. Keefe Av. to W. Vienna Av. (35 working days); N. 87th St. (WT410210655), W. Lisbon Av. to W. Melvina St. (52 working days); N. 88th St. (WT410210656), W. Vienna Av. to W. Capitol Dr. (39 working days) (Note: Contractor to furnish and install approximately 8313 lin. ft. of 16”, 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/29/2021 03:30 PM UTC
OFFICIAL NOTICE 15-1-2021
SANITARY SEWER MAIN RELAY & SANITARY SEWER LINING & MANHOLE REPAIR AND LINING IN: S. 1st St. – W. Armour Ave. to 150’+/- South of W. Armour Ave. S. 5th St. – 120’+/- North of W. Van Norman Ave. to Wilson Park Creek W. Armour Ave. – S. 1st St. to S. 5th Pl. Area Bounded By S. Howell Ave. to S. 6th St. and W. Bolivar Ave. to W. Layton Ave.
04/28/2021 03:30 PM UTC
OFFICIAL NOTICE 15-2-2021
COMBINED AND STORM SEWER MAIN RELAY in: S. 36th St. – W. Grant St. to W. Lincoln Ave. W. Clybourn St. – N. 32nd St. to N. 35th St.
04/28/2021 03:30 PM UTC
OFFICIAL NOTICE 15-3-2021
COMBINED AND SANITARY SEWER MAIN RELAY in: N. 25th St. - W. Monroe St. to W. Center St. N. 28th St. - W. Concordia Av. to W. Townsend St. N. 35th St. - W. Nash St. to W. Vienna Av. W. Concordia Av. - N. 29th St. to N. 30th St. .
04/28/2021 03:30 PM UTC
OFFICIAL NOTICE 34-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 8” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216210109 – ADA RAMPS FOR 2021 HIGH IMPACT PAVING @ VARIOUS LOCATIONS
04/27/2021 03:30 PM UTC
OFFICIAL NOTICE 47-1-2021
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATIONS: Project 1: CITY-OWNED LOT AREA 1A, BOUNDED BY: Capitol Drive to north City limits and Sherman Boulevard to west City limits
04/19/2021 03:30 PM UTC
OFFICIAL NOTICE 47-2-2021
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATIONS: PROJECT 2: CITY-OWNED LOT AREA 3, bounded by North Avenue, N. 27th Street, Capitol Drive, and N. 20th Street
04/19/2021 03:30 PM UTC
OFFICIAL NOTICE 1-1-2021
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 9” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE SLURRY, 8” CONCRETE BASE, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, PAVEMENT GRINDING, SEWER WORK, WATER WORK, ETC.; Located at: ST211190142 – West Cleveland Avenue – South 20th Street to South 27th Street ST214210101 – North 21st Street – West Galena Street to West Walnut Street
04/15/2021 03:30 PM UTC
OFFICIAL NOTICE 29-1-2021
WATER MAIN RELAYS, at the following locations: N. 77TH ST. (WT410210650), W. Lisbon Ave. to W. Nash St. (52 working days); W. Nash ST. (WT410210651), W. Appleton Ave. to N. 78th St. (62 working days); W. Townsend St. (WT410210682), N. 76TH St. to N. 82nd St. (54 working days). (Note: Contractor to furnish and install approximately 7009 lin. ft. of 16”, 12”, 8”, 6” and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2021 03:30 PM UTC
431 - 440 of 1443 Solicitations
1 2 40 41 42 44 46 47 48 144 145