General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 1-1-2025
Street Lighting LED upgrade CRP AREA B: E/W Juneau Ave. to E/W Oklahoma Ave, Lake Michigan to West City Limit
04/25/2025 03:30 PM UTC
OFFICIAL NOTICE 53-1-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 53-2-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 18-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; ST211220209 – North 30th Street – West Atkinson Avenue to West Hampton Avenue ST211210219 – West Gertrude Drive – West Stark Street to West Grantosa Drive
04/29/2025 03:30 PM UTC
OFFICIAL NOTICE 25-1-2025
SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING N. 34th St. - W. Clybourn St. to 250’ S. of W. Clybourn St. N. 36th St. – W. Michigan St. to W. Wisconsin Ave. N. 59th St. – W. Vine St. to 460’+/- N. of W. Vine St. E. Brown St. – 140’+/- W. of N. Hubbard St. to N. Hubbard St. W. Michigan St. – N. 36th St. to 145’+/- E. of N. 39th St.
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 25-2-2025
2025 SANITARY SEWER MANHOLE INSPECTION
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 37-1-2021
100 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee
04/14/2021 03:30 PM UTC
OFFICIAL NOTICE 36-1-2021
ROUTINE PARK AND PLAYGROUND LANDSCAPE MAINTENANCE, WASTE COLLECTION, AND SAFETY INSPECTIONPROJECT DESCRIPTION
04/13/2021 03:30 PM UTC
OFFICIAL NOTICE 36-2-2021
ROUTINE PARK AND PLAYGROUND LANDSCAPE MAINTENANCE, WASTE COLLECTION, AND SAFETY INSPECTION
04/13/2021 03:30 PM UTC
OFFICIAL NOTICE 36-3-2021
ROUTINE PARK AND PLAYGROUND LANDSCAPE MAINTENANCE, WASTE COLLECTION, AND SAFETY INSPECTION
04/13/2021 03:30 PM UTC
OFFICIAL NOTICE 36-4-2021
ROUTINE PARK AND PLAYGROUND LANDSCAPE MAINTENANCE, WASTE COLLECTION, AND SAFETY INSPECTION
04/13/2021 03:30 PM UTC
OFFICIAL NOTICE 9-1-2021
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216210108 – High Impact Project Locations South 14th Street – West Parnell Avenue to West Ramsey Avenue South 68th Street – West Forest Home Avenue to West Oklahoma Avenue South Clement Avenue – East Morgan Avenue to East Oklahoma Avenue South Griffin Avenue – East Armour Avenue to East Bolivar Avenue West Rosedale Avenue – South Chase Avenue to South 6th Street
04/01/2021 03:30 PM UTC
OFFICIAL NOTICE 8-1-2021
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216210107 – High Impact Project Locations North Astor Street – East State Street to East Ogden Avenue East Hartford Avenue – North Lake Drive to North Downer Avenue North Vel R. Phillips Avenue – West Walnut Street to West North Avenue North 38th Street – West Villard Avenue to West Silver Spring Drive North Hackett Avenue – East Locust Street to East Kenwood Boulevard North Prospect Avenue – East Mason Street to East Kilbourn Avenue North Prospect Avenue – East Royal Place to East Kane Place West Mt. Vernon Avenue – North 63rd Street to North 68th Street West Stevenson Street – North 69th Street to North 76th Street West Wisconsin Avenue – (Near North 2nd Street not completed)
03/31/2021 03:30 PM UTC
OFFICIAL NOTICE 40-1-2021
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATIONS: Project 1: CITY-OWNED LOT AREA 1A, BOUNDED BY: Capitol Drive to north City limits and Sherman Boulevard to west City limits
03/31/2021 03:30 PM UTC
OFFICIAL NOTICE 14-1-2021
COMBINED SEWER MAIN RELAY AND LINING Located at: S. 7th St. – W. Orchard St. to W. Lapham Blvd. S. 10th St. – W. Dakota St. to W. Manitoba St. W. Orchard St. – S. 12th St. to S. Cesar Chavez Dr.
03/30/2021 03:30 PM UTC
OFFICIAL NOTICE 14-2-2021
STORM SEWER MAIN RELAY in: N. 58th St. – 140’+/- NW. of W. Roosevelt Dr. to W. Philip Pl. N. 60th St. – 275’+/- S. of W. Philip Pl. to W. Philip Pl. N. Hopkins St. – W. Hampton Ave. to W. Stark St. W. Ruby Ave. – N. 42nd St. to N. Sherman Blvd.
03/30/2021 03:30 PM UTC
441 - 450 of 1443 Solicitations
1 2 41 42 43 45 47 48 49 144 145