General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 106-2-2025
WP-346 Cameron Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 106-1-2025
WP-346 Linnwood Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 108-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKINGS, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, BIOSWALES, ETC.;
12/18/2025 04:30 PM UTC
OFFICIAL NOTICE 105-1-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 19th St. (WT410230614), W. Fairmount Av. To W. Eggert Pl. (22 working days); W. Eggert Pl. (WT410230615), N. 19th St. to N. 19th Pl. (9 working days); N. 19th Pl. (WT410230616), W. Fairmount Av. to W. Eggert Pl. (23 working days); N. 19th St. (WT410230617), W. Eggert Pl. to W. Villard Av. (8 working days); W. Cornell St. (WT410230640) N. 20th St. to N. Teutonia Av. (42 working days); W. Linwal La. (WT410230656) N. 22nd St. to N. 24th St. (11 working days); N. 22nd St. (WT410230657) W. Hampton Av. to W. Linwal La. (9 working days); W. Stark St. (WT410230658) N> 20th St. to N. 24th St. (12 working days); W. Custer Av. (WT410230669) N. 20th St. to 100’ W/O N. Long Island Dr. (6 working days); N. 20th St. (WT410230670) W. Custer Av. to W. Neil Pl. (9 working days); W. Neil Pl. (WT410230671) N. 20th St. to 215’ NW/O N. Long Island Dr. (21 working days); W. Pierce St. (WT410250608) S. 6th St. to S. 9th St. (43 working days); N. 51st St. (WT410250754) W. Center St. to W. Burleigh St. (4 working days); N. 60th St. (WT410250756) at W. Burleigh St. (3 working days). (Note: Contractor to furnish and install approximately 9,950 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 105-2-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 68th St. (WT410230642), W. Grantosa Dr. to 425’ S/O W. Grantosa Dr. (9 working days); W. Herbert Av. (WT410230643), W. Tallmadge Pl. to N. 74th St. (12 working days); W. Tallmadge Pl. (WT410230644), W. Grantosa Dr. to W. Custer Av. (8 working days); W. Locust St. (WT410230645), N. 50th St. to N. 57th St. (48 working days); N. 94th St. (WT410230666), W. Center St. to 400’ NE/O W. Center St. (8 working days); W. Hadley St. (WT410230667), 320’ W/O N. 92nd St. to N. Colonial Dr. (19 working days); N. 95th St./W. Lorraine Pl./N. 97th St. (WT410230668), W. Center St. to W. Center St. (25 working days); S. Griffin Av. (WT410230696), E. Plainfield Av. to 350’ S/O E. Plainfield Av. (8 working days); S. Adams Av. (WT410230697), E. Plainfield Av. to 300’ S/O E. Plainfield Av. (9 working days); W. Appleton Av. (WT410240735), W. Hampton Av. (2 working days); N. 76th St. (WT410250601), W. Bobolink Av. to 120’ N/O W. Florist Av. (13 working days); W. Florist Av. (WT410250602), N. 76th St. to N. 77th St. (9 working days); N. 76th St. (WT410250751) W. Northridge Lakes Blvd. (3 working days); W. Becher St. (WT410250755) S. 4th St. (NEC) (2 working days) (Note: Contractor to furnish and install approximately 8,824 lin. ft. of 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICED 85-1-2021
Touchless Plumbing Retrofits – Various MPD
11/04/2021 03:30 PM UTC
OFFICIAL NOTICE 57-1-2021
SANITARY AND STORM SEWER MAIN RELAY & NEW STORM SEWER MAIN & SANITARY BUILDING SEWER RELAY: W. Warnimont Ave. – S. 84th St. to S. 87th St. S. 85th St. – W. Warnimont Ave. to W. Wilbur Ave. S. 86th St. – W. Warnimont Ave. to W. Wilbur Ave. S. 87th St. – W. Warnimont Ave. to W. Crawford Ave.
11/03/2021 03:30 PM UTC
OFFICIAL NOTICE NO. 86-1-2021
BALLISTIC SHUTTERS AT MILWAUKEE FIRE DEPARTMENT ENGINE HOUSE 13 AND 30.
10/29/2021 03:30 PM UTC
OFFICIAL NOTICE 74-1-2021
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING/MILLING, REPAIR PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, CRACKING AND SEATING CONCRETE PAVEMENT, 5” CONCRETE WALK, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, ETC.; Located at: ST211200119 – West Fernwood Circle – (West) West Honey Creek Drive to West Honey Creek. Drive ST211200125 – West Whitaker Avenue - South 20th St. to South Louisiana
10/21/2021 03:30 PM UTC
OFFICIAL NOTICE 75-1-2021
CONSTRUCTION, 7” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, 9” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, 5” CONCRETE WALK, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING/MILLING, TRAFFIC SIGNALS AND LIGHTING INSTALLATION, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, ETC.; Located at: ST211190135 – North 22nd Street - West Meinecke Avenue to West Wright Street ST211200124 – West Philip Place - North 58th Street to North 60th Street
10/21/2021 03:30 PM UTC
OFFICIAL NOTICE 83-1-2021
SANITARY AND COMBINED SEWER MAIN RELAY: Easement SE-2911 – E. Kenwood Blvd. 760’ +/- E. of N. Lake Dr. to E. Hampshire St. 735’ +/- E. of N. Lake Dr. N. Summit Ave. – E. Hartford Ave. to 200’ +/- N. of E. Hartford Ave.
09/21/2021 03:30 PM UTC
OFFICIAL NOTICE 82-1-2021
100 LEAD SERVICE LINE REPLACEMENTS
09/17/2021 03:30 PM UTC
OFFICIAL NOTICE 31-1-2021
Crackfill asphalt and concrete street pavements with a hot-applied asphalt based product used to seal and fill cracks and joints. Additional work involving the filling of small holes, joint failures, exposure of wire mesh and other minor surface defects using hot-applied asphalt based product and pea gravel will be required on all pavements. ETC.; Located at: ST211210139 - Crackfilling on Various Street Locations within the City of Milwaukee
09/10/2021 03:30 PM UTC
OFFICIAL NOTICE 80-1-2021
SANITARY MANHOLE REHABILITATION IN VARIOUS LOCATIONS
09/08/2021 03:30 PM UTC
OFFICIAL NOTICE 81-1-2021
Touchless Plumbing Retrofits Various MPD Sites
09/07/2021 03:30 PM UTC
461 - 470 of 1518 Solicitations
1 2 43 44 45 47 49 50 51 151 152