General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 96-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
09/17/2025 03:30 PM UTC
OFFICIAL NOTICE 89-1-2025
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE INSTALLATION, REPAIR OF EXISTING SPEED HUMPS, REPAINTING AND REFURBISHING OF EXSITING PAVEMENT MARKINGS, ETC.; Construction of Asphalt Speed Humps at these locations: ST211250103 2025 Existing Speed Hump Maintenance TBD ST211250155 Cherokee Point Neighborhood (4 Speed Humps) ST211250148 E. Potter Ave. - A pt. 375' e/o E. Russell Ave. to E. Russell Ave. (1 Speed Hump) ST211250149 E. Russell Ave. - S. Quincy Ave. to S. Adams Ave. (1 Speed Hump) ST211250126 E. Van Beck Ave. - S. Whitnall Ave. to S. Howell Ave. (2 Speed Humps) ST211250129 N. 33rd St. - W. Meinecke Ave. to W. Wright St. (1 Speed Hump) ST211250144 N. 39th St. - W. Glendale Ave. to W. Courtland Ave. (1 Speed Hump) ST211250118 N. 41st St. - W. Congress St. to W. Ruby Ave. (1 Speed Hump) ST211250119 N. 45th St. - W. Center St. to W. Hadley St. (1 Speed Hump) ST211250146 N. 51st St. - W. Washington Blvd. to W. Vine St. (1 Speed Hump) ST211250120 N. 58th St. - W. Hadley St. to W. Locust St. (1 Speed Hump) ST211250109 N. 61st St. - W. Melvina St. to W. Capitol Dr. (1 Speed Hump) ST211250140 N. 62nd St. - W. Congress St. to W. Medford Ave. (1 Speed Hump) ST211250141 N. 66th St. - W. Stark St. to W. Lancaster Ave. (2 Speed Humps) ST211250110 N. 70th St. - W. Marion St. to W. Congress St. (1 Speed Hump) ST211250116 N. 88th St. - W. Concordia Ave. to W. Townsend St. (1 Speed Hump) ST211250114 N. Arlington Pl. - E. Hamilton St. to E. Kane Pl. (1 Speed Hump) ST211250111 N. Hackett Ave. - E. Park Pl. to E. Newberry Blvd. (1 Speed Hump) ST211250142 N. Jackson St. - E. Pleasant St. to N. Water St. (2 Speed Humps) ST211250112 N. Prospect Ave. - E. Park Pl. to E. Newberry Blvd. (1 Speed Hump) ST211170121 N. Stowell Ave. - E. Newberry Blvd. to E. Locust St. (1 Speed Hump) ST211250113 N. Warren Ave. - E. Hamilton St. to E. Boylston St. (2 Speed Humps) ST211250132 S. 10th St. - W. Lapham Blvd. to W. Orchard St. (1 Speed Hump) ST211250125 S. 12th St. - W. Lapham Blvd. to W. Greenfield Ave. (2 Speed Humps) ST211250147 S. 23rd St. - W. Parnell Ave. to W. Denis Ave. (2 Speed Humps) ST211250123 S. 37th St. - W. Morgan Ave. to W. Ohio Ave. (3 Speed Humps) ST211250128 S. 9th Pl. - W. Euclid Ave. to W. Oklahoma Ave. (1 Speed Hump) ST211250130 W. Clarke St. - N. 19th St. to N. 20th St. (1 Speed Hump) ST211250122 W. Holt Ave. - S. 91st St. to S. 92nd St. (1 Speed Hump) ST211250117 W. Hope Ave. - N. 81st St. to N. 84th St. (3 Speed Humps) ST211250139 W. Lawn Ave. - N. 87th St. to N. 90th St. (1 Speed Hump) ST211220144 W. Thurston Ave. - N. 89th St. to N. 91st St. (2 Speed Humps) ST211250145 N. 73rd St. - W. Brentwood Ave. To N. Yuba St. (3 Speed Humps)
09/25/2025 03:30 PM UTC
OFFICIAL NOTICE 86-1-2025
PROJECT 1: SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & STORM AND COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING. N. 24th Pl.- W. Melvina St. to W. Capitol Dr. N. 38th St – W. Michigan St. to 300' +/- N of W. Michigan St. W. Capitol Dr. –N. 25th St. to N. 26th St. W. Everett St.– 175' +/- W. of N. Vel R. Phillips Ave. to N. Vel R. Phillips Ave. W. Lisbon Ave.– N. 46th St. to N. 52nd St. N. Pierce St.– 300' +/- S. of E. Wright St. to E. Wright St.
09/26/2025 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 6-1-2021
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216210105 – High Impact Project Locations North 68th Street - West Fond Du Lac Avenue to West Villard Avenue West Brentwood Avenue - North 84th Street to North 89th Street West Calumet Road – e\o North 67th Street to North 76th Street West Grantosa Drive, West Appleton Avenue to North 92nd Street North 99th Street – West Good Hope Road to West Bradley Road (painting of bike lanes only)
03/02/2021 04:30 PM UTC
OFFICIAL NOTICE 3-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF RAMPS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216200108 – ADA RAMPS FOR 2016 HIGH IMPACT PAVING PROJECTS @ THE FOLLOWING LOCATIONS: - West Center Street – North 20th Street to North 27th Street - West Center Street – North 43rd Street to North 60th Street - West Morgan Avenue – West Forest Home Avenue to South 68th Street - West Oklahoma Avenue – South Chase Avenue to South 6th Street - West Grange Avenue – South Howell Avenue to South 6th Street - South 16th Street – West Windlake Avenue to West Oklahoma Avenue
02/24/2021 04:30 PM UTC
OFFICIAL NOTICE 19-1-2021
ASBESTOS & HAZARDOUS MATERIALS ABATEMENT – SELECT INTERIOR DEMOLITION
02/22/2021 04:30 PM UTC
OFFICIAL NOTICE 4-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 8” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216210103 – ADA RAMPS FOR 2021 HIGH IMPACT PAVING @ VARIOUS LOCATIONS (NORTHSIDE PROJECTS)
02/19/2021 04:30 PM UTC
OFFICIAL NOTICE 2-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF RAMPS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216200108 – ADA RAMPS FOR 2016 HIGH IMPACT PAVING NORTHSIDE PROJECTS @ THE FOLLOWING LOCATIONS: - West Lisbon Ave./West Walnut Street - North 20th Street to North 31st Street - 35 corners - West Atkinson Avenue - West Keefe Avenue to North Teutonia Avenue - 67 corners - Ruby Yard - West Congress Avenue to North 30th Street) - 4 corners - West Roosevelt Drive – North 36th Street to West Fond Du Lac Avenue - 38 corners - West Villard Avenue – North 43rd Street to North 51st Street - 25 corners - North 37th Street- West Townsend Avenue to West Fond Du Lac Avenue - 22 corners - North 51st Boulevard- West Fond Du Lac Avenue to West Hampton Avenue- 17 corners - North 85th Street – West Capitol Drive to West hope Avenue- 7 corners - North 87th Court – West Fiebrantz Avenue to a point North - 4 corners - North 88th Street – West Fiebrantz Avenue to West Olive Street - 10 corners - North 92nd Street – West Lisbon Avenue to West Capitol Drive - 12 corners Total Corners = 241
02/17/2021 04:30 PM UTC
OFFICIAL NOTICE 12-1-2021
PROJECT NO. 1: SANITARY SEWER MAIN REPAIR & LINING AND MANHOLE REPAIR & LINING Located at: Area Bounded By S. 27th St. to S. 44th St. and W. Montana St. to W. Ohio Ave.
02/12/2021 04:30 PM UTC
OFFICIAL NOTICE 106-1-2020
WATER MAIN RELAYS, at the following locations: S. Miner St. (WT410200617), W. Fardale Av. to W. Howard Av. (12 working days); W. Fardale Av. (WT410200618), W. Loomis Rd. to S. Miner St. (21 working days); S. 33rd St. (WT410200625), W. Paine St. to W. Verona Ct. (12 working days); W. Paine St.(WT410200626), W. Lakefield Dr. to S. 33rd St. (12 working days); S. Sunset Dr. (WT410200638), W. Morgan Av. to S. Massachusetts Av. (42 working days); W. Tripoli Av. (WT410200639), S. Massachusetts Av. to S. 73rd St. (33 working days); S. 74th St. (WT41020640), W. Van Beck Av. to W. Waterford Av. (17 working days); S. 75th St. (WT410200641), W. Van Beck Av. to W. Waterford Av. (19 working days); W. Warnimont Av. (WT410200656), S. 78th St. to S. 81st St. (17 working days); S. 95th St. (WT410200668), W. Oklahoma Av. to W. Beloit Rd. (22 working days); S. 98th St. (WT410200669), W. Oklahoma Av. to W. Beloit Rd. (37 working days). (Note: Contractor to furnish and install approximately 12,692 lin. ft. of 16”, 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/14/2021 04:30 PM UTC
OFFICIAL NOTICE 11-1-2021
CONSTRUCTION AND INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, STREET LIGHTING POLES, CONDUIT AND CABLE INSTALLATION, ELECTRICAL APPURTENANCE REMOVALS, 5” CONCRETE WALK REMOVAL AND REPLACEMENT, ETC.; Located at: TD05688016 – Historic Third Ward Pole and Fixture Installation in: East Chicago Street, North Milwaukee Street, & East Corcoran Street
01/13/2021 04:30 PM UTC
OFFICIAL NOTICE 10-1-2021
2021 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Wet Testing
01/05/2021 04:30 PM UTC
OFFICIAL NOTICE 103-1-2020
WATER MAIN RELAYS, at the following locations: W. Concordia Ave. (WT410200620), N. 89th St. to N. 98th St. (88 working days); N. 96th St. (WT410200622), N. Colonial Dr. to 240' N/O W. Auer Ave. (28 working days); N. Colonial Dr. (WT410200623), W. Auer Ave. to W. Concordia Ave. (25 working days); W. Auer Ave. (WT410200624), N. 89th St. to N. 97th St. (82 working days); E. Linnwood Ave. (WT410200642), N. Downer Ave. to N. Lake Dr. (46 working days); W. Hampton Ave. (S/S) (WT410200644), N. 84th St. to N. 90th St. (62 working days); (Note: Contractor to furnish and install approximately 11,528 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/04/2021 04:30 PM UTC
521 - 530 of 1500 Solicitations
1 2 49 50 51 53 55 56 57 149 150