General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 75-1-2024
The general work requested is: CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS AND CRACKS, GRAVEL FILLING, CRUSH GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, TOPSOILING AND SODDING, ETC.; Located at: ST211230105 – In North 23rd Street Humboldt from West Ruby Avenue to West Cornell Street
09/26/2024 03:30 PM UTC
OFFICIAL NOTICE 89-1-2024
SANITARY AND STORM SEWER MAIN RELAY & SANITARY AND STORM SEWER MAIN LINING S. 24th St. - W. Euclid Ave. to W. Ohio Ave. S. 26th St. - W. Oklahoma Ave. to W. Ohio Ave. S. 28th St. - W. Oklahoma Ave. to W. Euclid Ave. S. 29th St. - W. Oklahoma Ave. to 120' South of W. Euclid Ave. W. Euclid Ave. - S. 27th St. to S. 31st St.
09/27/2024 03:30 PM UTC
OFFICIAL NOTICE 98-1-2024
2nd and Plankinton Parking Structure Renovation 2nd and Plankinton parking structure renovation - at east passenger elevator install new water diversion, Alt 1 (expand office, renovate bathroom and demo existing lobby and build new lobby).
10/01/2024 03:30 PM UTC
OFFICIAL NOTICE 106-1-2024
Milwaukee Police Department – Police Administration Building Service, ATS, & Paralleling Gear Upgrades
10/09/2024 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 112-1-2019
PROJECT NO. 1: COMBINED SEWER MAIN SLIP LINING , MANHOLE REPAIR AND LINING: Located at: N. 26th St. (E/S) – W. North Ave. to W. Wright St. W. Medford Ave. – W. Wright St. / N. 26th St. to N. 27th St. N. 27th St. – W. Medford Ave. to W. Center St.
11/08/2019 04:30 PM UTC
OFFICIAL NOTICE 37-1-2019
PROJECT NO.1: STORM SEWER CLEANING AND EXAMINATION Various Locations in the City of Milwaukee
10/30/2019 03:30 PM UTC
OFFICIAL NOTICE 25-1-2019
HP-186: COAGULATION BASIN #1 FLOCCULATOR UPGRADES
10/22/2019 03:30 PM UTC
OFFICIAL NOTICE 101-1-2019
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENT, AND SODDING & TOPSOIL, CONCRETE WALK AND/OR DRIVEWAY REMOVAL, CURB AND/OR CURB AND GUTTER REMOVAL, ETC.; Located at: ST230190160 - 2019 Scatter Sites Sidewalk Replacements At Various Locations City Wide
10/01/2019 03:30 PM UTC
OFFICIAL NOTICE 99-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE INSTALLATION, ETC.; Construct Asphalt Speed Humps at the Following Locations: (ST211180222) – N. 12th St. – W. Concordia Ave. to W. Keefe Ave. (2 speed humps) (ST211160164)–N. 16th St. – W. Atkinson Ave.to W. Capitol Dr. (1 speed hump) (ST211180269) – N. 21st St. – W. Nash St. to W. Vienna Ave. (1 speed hump) (ST211190113) – S. 25th St. – W. Holt Ave. to W. Ohio Ave. (1 speed hump) (ST211180273) – S. 25th St. – W. Greenfield Ave. to W. Scott St. (1 speed hump) (ST211180271) – S. 25th St. – W. Mineral St. to W. National Ave. (1 speed hump) (ST211190107) – N. 25th St. – W. Center St. to W. Hadley St. (1 speed hump) (ST211180283) – S. 31st St. – W. Hayes Ave. to W. Lincoln Ave. (1 speed hump) (ST211190139) – S. 36th St. – W. Mitchell St. to W. Lapham St. (1 speed hump) (ST211190114) – N. 41st St. – W. Meinecke Ave. to W. Wright St. (1 speed hump) (ST211180276) – N. 45th St. – W. Concordia Ave. to W. Townsend St. (1 speed hump) (ST211190115) – N. 49th St. – W. Washington Bd. To W. Vine St. (2 speed humps) (ST211190118) – N. 62nd St. – W. Hope Ave. to W. Marion St. (1 speed hump) (ST211180249) – N. 70th St. – W. Locust St. to W. Lisbon Ave. (2 speed humps) (ST211180266) – N. 74th St. – W. Marion St. to W. Congress St. (1 speed hump) (ST211190111) – W. Mineral St. – S. 24th St. to S. 25th St. (1 speed hump) (ST211180275) – W. Mineral St. – S. 25th St. to S. 26th St. (1 speed hump) (ST211180268) – W. Rogers St. – S. 23rd St. to S. 24th St. (1 speed hump)
09/30/2019 03:30 PM UTC
OFFICIAL NOTICE 100-1-2019
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, AND SODDING & TOPSOIL, CONCRETE WALK AND/OR DRIVEWAY REMOVAL, CURB AND/OR CURB AND GUTTER REMOVAL, ETC.; Located at: ST230190157 - Area 1 - 2019 Sidewalk Replacements Area Bounded By (ABB): E. Locust St., N. Maryland Ave., E. Kenwood Blvd., to N. Downer St.
09/27/2019 03:30 PM UTC
OFFICIAL NOTICE 36-1-2019
PAVEMENT RESTORATION & REPLACEMENT AT STORM INLETS, CATCH BASINS, MANHOLES, AND OTHER LOCATIONS Located at: VARIOUS LOCATIONS IN THE CITY OF MILWAUKEE
09/25/2019 03:30 PM UTC
OFFICIAL NOTICE 108-1-2019
MACARTHUR SQUARE ELECTRICAL MODERNIZATION 841 N JAMES LOVELL STREET MILWAUKEE WI 53233
09/24/2019 03:30 PM UTC
OFFICIAL NOTICE 111-1-2019
WITKOWIAK PARK RECONSTRUCTION 1648 SOUTH 4TH ST MILWAUKEE WI 53204
09/16/2019 03:30 PM UTC
OFFICIAL NOTICE 98-1-2019
SEALCOAT BITUMINOUS PAVEMENTS USING A SLURRY SEAL BITUMINOUS/AGGREATE MIX. SEALCOATING WILL INCLUDE SURFACE CLEANING/SWEEPING OF PAVEMENT WITH MECHANICAL SWEEPERS, INSTALL/REMOVE PROTECTIVE COVER OVER, WATER BOXES, INLETS GRATES AND MANHOLE COVERS, ETC.; Located at: ST211190148 – 2019 Seal Coating by Contract @ Various Locations City Wide
09/12/2019 03:30 PM UTC
521 - 530 of 1386 Solicitations
1 2 49 50 51 53 55 56 57 138 139